• Title/Summary/Keyword: Line capacity

Search Result 1,075, Processing Time 0.024 seconds

An Improvement of Optical Fiber Composite Power Cable On-Line Monitoring System for Underground Distribution Network (지중 배전계통 적용을 위한 광복합 케이블 실시간 감시시스템 개선)

  • Cho, Jin-Tae;Kim, Ju-Yong;Lee, Hak-Ju;Park, Jung-Sung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.7
    • /
    • pp.77-83
    • /
    • 2012
  • Since power system is switching to smart grid, on-line monitoring technology has become necessary for underground distribution power cable. Therefore, the application of DTS(Distributed Temperature Sensing) technology using OFCPC(Optical Fiber Composite Power Cable) capable of monitoring underground distribution power cables has been developed. These can bring about reductions in faults and increases in operating capacity of underground distribution system. To date, the test-bed of optical fiber composite power cable on-line monitoring system has been constructed. Then, matters to be improved have been drawn through verification experiments. This paper presents the improvement and experiment results of the optical fiber composite power cable on-line monitoring system to apply to underground distribution lines in the field.

Prediction of Dynamic Line Rating Based on Thermal Risk Probability by Time Series Weather Models (시계열 기상모델을 이용한 열적 위험확률 기반 동적 송전용량의 예측)

  • Kim, Dong-Min;Bae, In-Su;Cho, Jong-Man;Chang, Kyung;Kim, Jin-O
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.7
    • /
    • pp.273-280
    • /
    • 2006
  • This paper suggests the method that forecasts Dynamic Line Rating (DLR). Thermal Overload Risk Probability (TORP) of the next time is forecasted based on the present weather conditions and DLR value by Monte Carlo Simulation (MCS). To model weather elements of transmission line for MCS process, this paper will propose the use of statistical weather models that time series is applied. Also, through the case study, it is confirmed that the forecasted TORP can be utilized as a criterion that decides DLR of next time. In short, proposed method may be used usefully to keep security and reliability of transmission line by forecasting transmission capacity of the next time.

Parameter Study of Position Keeping for Semi-submersible Offshore Structure by Tugs (Tug에 의한 반잠수식 해양 구조물 위치 유지를 위한 제반 파라메터 검토)

  • Lee, Jin Ho;Park, Jun Heum;Jang, Hag Soo
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.4
    • /
    • pp.274-279
    • /
    • 2014
  • This paper investigates the line dynamic forces connecting tugs and a floater, where the planar motion of the floater is due to the weather criteria during the position keeping of the offshore structure by tugs. The analysis situation consists of the position keeping states for the seabed mooring line connection work of the offshore structure at the offshore site. Specifically, the decision about the tug power capacity for the position keeping is essential and depends on the weather criteria, line characteristics, length of line, etc. The planar motion of the structure is constrained by the interference of the installation vessel's operational range, behavior of the underwater fairlead, and other surrounding structures. In this paper, the tug line forces and planar motion of an offshore structure are summarized dependent on the tug line length and line material characteristics in the states fora given floater draft and weather criteria. The tug line dynamic forces and planar motion evaluated here will be used to determine the proper tug power and clearance of an offshore structure.

A Study on Correction of the Protective Relay Equipped in the Dedicated Line Used for Connecting Distributed Generators to Power Network (분산전원 계통 연계 전용선로에 설치된 보호 계전기의 정정에 관한 연구)

  • Jeong, Jong-Chan;Jang, Sung-Il;Choi, Don-Man;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.141-144
    • /
    • 2002
  • This paper describes the correction of the protective relay equipped in the dedicated line used for connecting distributed generators (DG) to power grid. The fault current measured in a relaying point might be changed according to the fault conditions. Generally, the fault current of the line to line fault or the line to ground fault at the dedicated line is much higher than the protective set value due to the large fault level. However. when the high impedance fault is occurred in the dedicated line, we may not detect it because its fault level can be lower than the generating capacity of DG. And, the protective relay with conventional set value may generate a trip signal for insertion of DG due to the large transient characteristics of generators. Through the various simulations such as the fault in the dedicated line and the insertion of DG, we show that it would be necessary to modify the protective relay set value for detecting the high impedance fault occurred in the dedicated line and for preventing the mis-operation of protective relay caused by the insertion of DG.

  • PDF

Effect of Generation Capacity Constraints on a Mixed Strategy Nash Equilibrium in a Multi-Player Game (다자게임에서 발전력제약이 복합전략 내쉬균형에 미치는 영향)

  • Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.34-39
    • /
    • 2008
  • Nash Equilibrium(NE) is essential to investigate a participant's bidding strategy in a competitive electricity market. Congestion on a transmission line makes it difficult to compute the NE due to causing a mixed strategy. In order to compute the NE of a multi-player game, some heuristics are proposed with concepts of a key player and power transfer distribution factor in other studies. However, generation capacity constraints are not considered and make it more difficult to compute the NE in the heuristics approach. This paper addresses an effect of generation capacity limits on the NE, and suggest a solution technique for the mixed strategy NE including generation capacity constraints as two heuristic rules. It is reported in this paper that a role of the key player who controls congestion in a NE can be transferred to other player depending on the generation capacity of the key player. The suggested heuristic rules are verified to compute the mixed strategy NE with a consideration of generation capacity constraints, and the effect of the generation constraints on the mixed strategy NE is analyzed in simulations of IEEE 30 bus systems.

Capacity Characteristics of the Indoor Propagation Channel for MIMO System at 5 GHz (5GHz 대역 MIMO 시스템에 대한 실내 전파 채널용량 특성)

  • Ryu, Seong-Hyun;Kim, Jung-Ha;Kwon, Se-Woong;Yoon, Young-Joong
    • Proceedings of the Korea Electromagnetic Engineering Society Conference
    • /
    • 2003.11a
    • /
    • pp.43-46
    • /
    • 2003
  • This paper presents capacity characteristics of the indoor LOS(Line-Of-Sight) propagation channel for MIMO system at 5GHz. The distance between antenna elements, their moving path, and number of transmitting and receiving antennas can be determined by wanted eigen-vlaue, and channel capacity of the MIMO communication channel using only reliable simulation without measurements. The simulation uses 3D Ray tracing and patch scattering model to which electromagnetic material constants are applied. As distance between antenna elements increases, distribution of the eigen-value show a tendency to decrease, but channel capacity increases in LOS environment. However, despite of short distance between antenna elements, large value of channel capacity is obtained in positions which have high AS. When the position of receiver antennas are shifted, channel capacity hardly changed, and as number of antenna elements increases, channel capacity also increases regularly.

  • PDF

Channel Capacity Maximization in a Distorted 2×2 LOS MIMO Link

  • Ko, In-Chang;Park, Hyung-Chul
    • Journal of information and communication convergence engineering
    • /
    • v.16 no.2
    • /
    • pp.72-77
    • /
    • 2018
  • This paper presents a novel channel capacity maximization method for a distorted $2{\times}2$ line-of-sight (LOS) multiple-input multiple-output (MIMO) link. A LOS MIMO link may be distorted by the influence of environmental factors such that the channel capacity of the LOS MIMO link may be degraded. By using the proposed method, the channel capacity of a distorted $2{\times}2$ LOS MIMO link can be the same as that of the ideal $2{\times}2$ LOS MIMO link. The proposed method employs an additional receiver antenna to maximize the channel capacity. In contrast to a $3{\times}2$ LOS MIMO link, a receiver circuit for a third receiving antenna is not necessary. Hence, the receiver for the proposed method is much simpler than that for a $3{\times}2$ LOS MIMO link. We determine the optimal position of the additional receiver antenna analytically. Simulation results show that the channel capacity can approach the ideal using the proposed method.

A Study on Selecting the Optimal Location of BTB HVDC for Reducing Fault Current in Metropolitan Regions Based on Genetic Algorithm Using Python (Python을 이용한 유전 알고리즘 기반의 수도권 고장전류 저감을 위한 BTB HVDC 최적 위치 선정 기법에 관한 연구)

  • Song, Min-Seok;Kim, Hak-Man;Lee, Byung Ha
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1163-1171
    • /
    • 2017
  • The problem of fault current to exceed the rated capacity of a power circuit breaker can cause a serious accident to hurt the reliability of the power system. In order to solve this issue, current limiting reactors and circuit breakers with increased capacity are utilized but these solutions have some technical limitations. Back-to-back high voltage direct current(BTB HVDC) may be applied for reducing the fault current. When BTB HVDCs are installed for reduction in fault current, selecting the optimal location of the BTB HVDC without causing overload of line power becomes a key point. In this paper, we use genetic algorithm to find optimal location effectively in a short time. We propose a new methodology for determining the BTB HVDC optimal location to reduce fault current without causing overload of line power in metropolitan areas. Also, the procedure of performing the calculation of fault current and line power flow by PSS/E is carried out automatically using Python. It is shown that this optimization methodology can be applied effectively for determining the BTB HVDC optimal location to reduce fault current without causing overload of line power by a case study.

Comparison of Yield and Growth Characteristics of Korean High Yielding Cultivars and IRRI's New Plant Type Rice Line

  • Lee, Byun-Woo;Ha, Jong-Ryuk
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.44 no.1
    • /
    • pp.59-63
    • /
    • 1999
  • Yield and growth characteristics were compared for five rice cultivars; a new Tongil-type, so called "super-rice", Dasanbyeo, an old Tongil-type Milyang 23, two japonicas Dongjinbyeo and Ilpumbyeo, and a new plant type (NPT)line IR65600-27-1-2. The objective of this stusy was to clarify the high yielding capacity of Dasanbyeo in terms of growth characteristics. The average grain yield (9 t/ha) of Dasanbyeo was higher than that of Milyang 23 by ca. 9% that of japonicas by 20 to 30%, and that of NPT line by ca. 100%. The higher grain yield of Dasanbyeo was attributable not only to the greater dry matter production but also to the higher harvest index (HI). Dasanbyeo showed the greatest dry matter at harvest owing not only to the rapid leaf expan-sion at early growth stage and the resulting high LAI through the entire growth stage but also to the high NAR despite the high LAI. The rapid leaf expansion of Dasanbyeo at early growth stage seemed to be related in part to the profuse tillering capacity. HI was 0.53 in Dasanbyeo, 0,51 in Milyang 23, 0.41 in japonicas, and 0.35 in NPT line. Dasanbyeo was indebted for its higher HI to the relatively high grain filling ratio in spite of a much greater sink size than the other cultivars. Dasan had a greater source to sink ratio during grain ripening as measured by LAD/spikelet and dry matter production/spikelet which showed positove correlations with the grain ripening ratio. New plant type (NPT) line showed the lowest grain yield owing to the small sink size and the low grain filling ratio which seemed to have resulted from the abundant occurrence of weak-strength spikelets. The weak sink strength, in turn, seemed to have suppressed photosynthesis during the grain ripening stage.

  • PDF