• Title/Summary/Keyword: Line capacity

Search Result 1,075, Processing Time 0.033 seconds

Allocation of Buffer Capacity in Automatic Transfer Line Using Robust Design Method (안정성 설계방법을 이용한 자동흐름라인의 완충재고용량 할당)

  • Seo, Sun-Keun;Chung, Won-Kee
    • IE interfaces
    • /
    • v.12 no.2
    • /
    • pp.210-221
    • /
    • 1999
  • Several researchers have previously studied the problem of allocating buffer storage to maximize the throughput rate and/or minimize the mean buffer average of a transfer line for a given total amount of buffer space. But there seems to be very little difference in performance between intuitively reasonable and optimal allocations. This paper proposes and illustrates a methodology, based on the robust design concept of Taguchi, to allocate buffer storage of long transfer lines with a given total amount of buffer capacity when up and down times follow exponential distributions, respectively. We show how this procedure using simple heuristic rule can be used for design of long transfer lines.

  • PDF

An Analysis the Distribution Power System Voltage Sag Case by a High Capacity Motor Connection (대용량 전동기 기동시 배전계통의 순간전압강하 발생사례 분석)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.10
    • /
    • pp.143-148
    • /
    • 2010
  • Recently, the KEPCO is constructing the PQMS(Power Quality Monitoring System) each of the distribution line and will establish the voltage sag standard based on the long time measurement data of PQMS. The voltage sag prospect is difficult for the power system manager, however, the voltage sag forecasted is very important because the damage effect of the voltage sag is very broad. This paper describes the prospect formula of the voltage sag magnitude in the PCC(Point Common Coupling) by the starting current when the high capacity equipment is connected with the distribution line. To achieve this, this paper has proposed the sag prospect formula revision of KEPCO for the reliability improvement and the proposed formula has been applied the voltage sag real case to inspect the calculation procedure and reliability.

Distributed Energy System Connection Limit Capacity Increase Technology Using System Flexible Resources (계통유연자원을 활용한 분산에너지 계통접속 한계용량 증대 기술)

  • Jeong Min Park
    • Journal of Integrative Natural Science
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2023
  • Due to changes in the distribution system and increased demand for renewable energy, interest in technology to increase the limit capacity of distributed energy grid connection using grid flexible resources is also increasing. Recently, the distribution system system is changing due to the increase in distributed power from renewable energy, and as a result, problems with the limited capacity of the distribution system, such as waiting for renewable energy to connect and increased overload, are occurring. According to the power generation facility status report provided by the Korea Power Exchange, of the total power generation capacity of 134,020 MW as of 2021, power generation capacity through new and renewable energy facilities is 24,855 MW, accounting for approximately 19%, and among them, power generation through solar power accounts for a total portion of the total. It was analyzed that the proportion of solar power generation facilities was high, accounting for 75%. In the future, the proportion of new and renewable energy power generation facilities is expected to increase, and accordingly, an efficient operation plan for the distribution system is needed. Advanced country-type NWAs that can integrate the operation and management of load characteristics for each line of the distribution system, power distribution, regional characteristics, and economic feasibility of distributed power in order to improve distribution network use efficiency without expanding distribution facilities due to the expansion of renewable energy. An integrated operating system is needed. In this study, in order to improve the efficiency of distribution network use without expanding distribution facilities due to the expansion of renewable energy, we developed a method that can integrate the operation and management of load characteristics for each line of the distribution system, power distribution, regional characteristics, and economic feasibility of distributed power. We want to develop an integrated operation system for NWAs similar to that of advanced countries.

Evaluation for Lifetime and Thermal Ratings for Aged Overhead Transmission Lines (노후 가공송전선의 수명과 열용량의 평가)

  • Kim, Sung-Duck
    • Journal of IKEEE
    • /
    • v.16 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • Thermal rating or lifetime evaluation for aged overhead transmission line becomes more important concerns with respect to keeping power delivery stable having proper capability. Both load rating and dip/clearance are essential factors to determine transmission capacity. In order to evaluate thermal rating and conductor lifetime for domestic transmission lines with double-circuit, the dip/ground clearance standards as well as the electrical equipment technical standard are examined. Conductor temperature and dip are calculated under the assumption of a contingency, and then, a method to up-rate load capacity is searched. As thermal rating and limit dip for aged conductor are properly evaluated, an improved strategy in order to guarantee the existing power system reliability is presented in this paper.

A Simulation Based Study on Increasing Production Capacity in a Crankshaft Line Considering Limited Budget and Space (예산과 공간 제약하에서 크랭크샤프트 생산라인의 생산능력 증대를 위한 시뮬레이션 기반의 연구)

  • Wang, Guan;Song, Shou;Shin, Yang Woo;Moon, Dug Hee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.5
    • /
    • pp.481-491
    • /
    • 2014
  • In this paper, we discussed a problem for improving the throughput of a crankshaft manufacturing line in an automotive factory in which the budget for purchasing new machines and installing additional buffers is limited. We also considered the constraint of available space for both of machine and buffer. Although this problem seems like a kind of buffer allocation problem, it is different from buffer allocation problem because additional machines are also considered. Thus, it is not easy to calculate the throughput by mathematical model, and therefore simulation model was developed using $ARENA^{(R)}$ for estimating throughput. To determine the investment plan, a modified Arrow Assignment Rule under some constraints was suggested and it was applied to the real case.

Comparison of properties at Fossil Power Plant by On-Line Real Time Performance Monitoring System (On-Line 실시간 성능감시 시스템을 이용한 화력발전소 운전 Parameter 값 비교분석)

  • Jung, Hoon;Park, Doo-Yong
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3501-3505
    • /
    • 2007
  • As the power plant industry has been changed into competition structure, power generation companies do more with less by increasing capacity and lowering operation costs. In order to achieve this goals, an on-line real-time performance monitoring system has been needed to introduced to fossil power plant. The system represents a suite of related software modules which consist of on-line data, and on-line performance modules. This system can help the plant staff get the most out of their facilities by continuously monitoring deviations in equipment performance and the impact on those deviations on plant power, heat rate and operating cost. This paper shows the comparison of design value with acceptance test and current(measured) value.

  • PDF

A study of SMOS line driver with large output swing (넓은 출력 범위를 갖는 CMOS line driver에 관한 연구)

  • 임태수;최태섭;사공석진
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.34S no.5
    • /
    • pp.94-103
    • /
    • 1997
  • It is necesary that analog buffer circuit should drive an external load in the VLSI design such as switched capacitor efilter (SCF), D/A converter, A/d converter, telecommunicatin circuit, etc. The conventional CMOS buffer circuit have many probvlems according as CMOS technique. Firstly, Capacity of large load ar enot able to opeate well. The problem can be solve to use class AB stages. But large load are operated a difficult, because an element of existing CMOS has a quadratic functional relation with inptu and outut voltage versus output current. Secondly, whole circuit of dynamic rang edecrease, because a range of inpt and output voltages go down according as increasing of intergration rate drop supply voltage. In this paper suggests that new differential CMOS line driver make out of operating an external of large load. In telecommunication's chip case transmission line could be a load. It is necessary that a load operate line driver. The proposal circuit is planned to hav ea high generation power rnage of voltage with preservin linearity. And circuit of capability is inspected through simulation program (HSPICE).

  • PDF

A Study on Methods of Interference Avoidance between Power Line Communications and Radio Communications (고속전력선통신과 무선통신간의 간섭 회피 방법에 대한 연구)

  • Jang, Dong-Won;Lee, Young-Hwan
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.223-226
    • /
    • 2007
  • This paper first outlines the technology used in Power Line Communications(PLC) systems, and the political support being offered to the technology, from the point of view of its effect on electromagnetic compatibility (EMC). The radio spectrum needs protection from other interferers, and there is a regime in place to provide this interference avoidance/mitigation. Nevertheless, PLC has several features that mean that it is capable of creating such interference. These features are discussed, and some published field trial results are reviewed. Difficulties in achieving compatibility between the requirements for radio protection and the requirements for operation of the PLC system mean that there is no consensus as yet as to how PLC system components can be made compliant with EMC requirements. It is concluded that there is little prospect of an accommodation between the competing demands, so that if PLC is to become widespread it will be at the expense of the radio environment.

  • PDF

Examination of Increasing Power Delivery Capacity with variable Tab Autotransformer (가변탭 변압기를 사용한 급전용량 증가 검토)

  • Lee, Chang-Mu;Han, Moon-Seub;Lee, Han-Min;Kim, Ju-Rak;Kim, Gil-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1163_1164
    • /
    • 2009
  • AC AT feeding method consists return circuits of electric train inserting in parallel between trolly line and feeding line and connecting neutral line to rail and FPW. Due to increasing train number, electric load at feeding system are increasing and collecting voltage of train are going down. To increase electric load and collecting voltage between trolly line and rail, the usefulness of new autotransformer are considered which variation of short impedance and change of line voltage is simulated with modified winding ratio of autotransformer from 1:1 to variable tab.

  • PDF

Load capacity of high-strength reinforced concrete slabs by yield line theory

  • Gorkem, Selcuk Emre;Husem, Metin
    • Computers and Concrete
    • /
    • v.12 no.6
    • /
    • pp.819-829
    • /
    • 2013
  • The objective of this study is to determine whether or not the yield line theory, an effective method widely used for slabs made of ordinary concrete, can be used also for the reinforced concrete slabs made of high-strength concrete. Flexural behavior of simply supported slabs in three different sizes were investigated under concentrated load at mid-span. Additionally, behavior of high strength reinforced concrete slabs with 50 mm and 150 mm reinforcement spacings also studied. Failure loads, deflections, experimental and theoretical failure mechanisms were evaluated. The difference between the moments based on yield line theory and experimental moments varied between 1% to 3%. Experimental and analysis results revealed that yield line analysis could conveniently be employed in the analysis of high strength reinforced concrete slabs.