Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

Free Surface Procedure for Lifting Operation by Parallel Connected Floating Cranes using Synchronized Operation System and Its Applications to Lifting Operations of a Heavy Cargo (동조 시스템을 적용한 다수대의 해상크레인 병렬 운용 절차 및 대형 중량물의 리프팅 작업 적용)

  • Hwang, Jin-Ho;Ahn, Jeong-Ik;Lee, Soo-Bae;Kim, Yun-Ho;Choung, Jin-Sik;Ham, Seung-Ho;Lee, Won-Joon
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.97-106
    • /
    • 2009
  • Many production methods are tried to enhance the productivity efficiency. Parallel connected floating cranes are one of the examples to lift mega-blocks quickly and efficiently. However, a general operation manual to operate parallel connected floating cranes and a method to consider risks during lifting operation are not confirmed. And if each floating crane is operated by itself, it is very hard to cooperate. Therefore, Synchronized operation system is installed to control parallel connected floating cranes simultaneously and to be informed of each floating cranes data. And weighting factor is calculated by considering all hazards during the operation and the general operation manual is confirmed based on the factor. This paper introduces the procedure for lifting operations by parallel Connected Floating Cranes using synchronized operation system, and its applications to lifting operation of a heavy cargo such as barge lifting test, floating dock installation and 900 ton goliath crane replacement operation, etc.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Guidelines on the Operation Phases of Manual Material Handling Tasks Through Literature Reviews

  • Lee, Kyung-Sun;Jung, Myung-Chul
    • Journal of the Ergonomics Society of Korea
    • /
    • v.36 no.4
    • /
    • pp.325-341
    • /
    • 2017
  • Objective: The purpose of this study is to suggest the guidelines of operation phases to minimize injuries and musculoskeletal disorders in manual material handling (MMH) tasks through literature reviews. The guidelines are presented as the preparing phase, lifting phase, carrying phase, and lowering phase. Also, we summarized the non-numerical general guidelines for MMH tasks. Background: Manual material handling is still a main cause to musculoskeletal disorders. Method: Procedures of a literature review are classified into database selection, keyword search, title review, abstract review related to literature selection, guideline review and arrangement. A total 48 papers and books were analyzed in detail by title and abstract reviews. Results: In the preparing phase, we suggested the basic conditions in MMH, preparing procedure, clothing and protective equipment, and education. In the lifting and carrying phases, we recommended maximal acceptable weight by frequency and body posture. In the lowering phase, we suggested the lowest weight and safety body postures. Finally, we recommended general guidelines and guideline items for MMH. General guidelines are presented to suggest worker selection, technical education, and work design parts. Conclusion: We suggested the guidelines on the four operation phases of MMH tasks such as preparing, lifting, carrying, and lowering phases. Application: The findings of this study can be utilized as guidelines for proactive recommendations according to workers in MMH tasks.

Comparative Analysis of Lifting Loads of Tower Cranes by Core Structure Construction Methods

  • Choi, Yong Seok;Kim, Taehoon;Kim, Sangdae
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.301-306
    • /
    • 2020
  • In tall building construction, the appropriate control of lifting loads on tower cranes is critical in terms of the construction duration of structural works. The adoption of efficient construction methods can be the most effective way of minimizing the inputs of tower cranes and making a lifting plan and management easier. Based on actual data from a tall building project, this study comparatively analyzes lifting loads of tower cranes by the core structure preceding construction method (CSPCM) and the core structure succeeding construction method (CSSCM). The results revealed that the CSSCM could reduce up to about 56.3% of lifting loads for core works and significantly enhance lifting efficiency compared with the CSPCM. Consequently, this enabled a substantial reduction in the construction duration of structural works. This study provides a practical reference to assist engineers and managers in applying efficient construction methods and lifting equipment operation in tall building projects.

Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super High-rise Buildings (초고층 건축공사의 리프트 수직 환승운영 최적화 방안 연구)

  • Moon, Jooyong;Park, Moonseo;Lee, Hyunsoo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.53-62
    • /
    • 2014
  • Recently, the number of super high-rise building projects have been increased after recovering from international financial crisis. In super high-rise building project, vertical lifting is critical to overall project productivity, due to its limited lifting equipments. Also for projects which buildings' height are higher than 400m, transfer operation in lifting is inevitable because of lifts' maximum lifting height. In transfer operation, setting a transfer floor is essential for saving lifting time of resources. In this research, using discrete event simulation modeling with AnyLogic 7.0 software and metaheuristic optimization with OptQuest software, the method of optimizing a transfer floor for workers during the morning peak time is proposed. Comparing to the result of the case which transfer floor is designated to the middle floor, setting optimized transfer floor significantly decrease the total lifting time of workers. By using proposed simulation and optimization tool, saving budget and time through increasing available working hour is expected.

OPTIMIZATION ALGORITHM FOR AUTOMATIC LAYOUT OF TOWER CRANES

  • Dong-Hoon Lee;Hyun-Min Lee;Jin-Kyu Joo;Sun-Kuk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1060-1067
    • /
    • 2009
  • The selection and operation of tower cranes at construction sites are dependent on the personal experience of engineers in charge of lifting work. It often causes to overestimate the safety factor resulting in increase of construction cost, or underestimate it resulting in disastrous accident. Therefore, selection of tower cranes needs to consider cost, safety and maximum lifting condition. This study, for resolving such problems, was intended to propose the algorithm designed for even the inexperienced person to select the optimal lifting equipment in timely manner. The algorithm presented herein is an optimization algorithm that enables automatic arrangement of tower crane and minimization of costs by analyzing such conditions as vertical height and lifting load, etc.

  • PDF

Development of Structural Analysis System for a Ship Block under Lifting and Turnover Operation (선박 블록의 반전 및 이동시 변형예측을 위한 구조해석 시스템의 개발)

  • Han, Jeong-Sam;Lee, Won-Jae;Choo, Yeon-Seok;You, Young-Kyoon;Kwak, Byung-Man
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.219-223
    • /
    • 2001
  • This paper introduces DS/Block-Structure - a structural analysis module of DS/Block, which is a Design System to simulate the behavior of a ship block in various crane operations and to evaluate its structural deformation using the finite element method. It runs based on a CAD program, Pro/ENGINEER, and structural analyses are performed by a developed FE code. Boundary conditions for the FE analysis of a ship block under lifting and turnover operation are also considered.

  • PDF

Launching Simulation of Integrated Mining System for Deep-Seabed Mineral Resources (심해저 광물자원 채광시스템의 설치 거동 해석)

  • Hong, Sup;Kim, Hyung-Woo;Choi, Jong-Su;Yeu, Tae-Kyeong
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.315-318
    • /
    • 2006
  • This paper concerns about coupled dynamic analysis of the deep-seabed mining system in launching operation. The dynamic behavior of mining system consisting of lifting pipe, buffer station, flexible conduit and self-propelled miner is simulated in time domain. The launching operation is divided into four critical phases: (1) deployment of miner and flexible conduit, (2) deployment of lifting pipe, flexible conduit and miner, (3) touch-down of miner, (4) final launching. The dynamic responses of sub-systems - miner, flexible conduit, buffer and lifting pipe - are analyzed in each launching phase. According to the changing periods of forced excitation at the top, the dynamic responses of sub-systems are diverse in their characteristics. It has been shown that the total integrated responses of sub-systems are strongly affected by the design parameters. Especially, the principal dimensions of flexible conduit seem to be significant in determining of the global response. Based on the simulation results, safe operation conditions are investigated.

  • PDF

Development of a System Observing Worker's Physiological Responses and 3-Dimensional Biomechanical Loads in the Task of Twisting While Lifting

  • Son, Hyun Mok;Seonwoo, Hoon;Kim, Jangho;Lim, KiTaek;Chung, Jong Hoon
    • Journal of Biosystems Engineering
    • /
    • v.38 no.2
    • /
    • pp.163-170
    • /
    • 2013
  • Purpose: The purpose of this study is to provide analysis of physiological, biomechanical responses occurring from the operation to lifting or twist lifting task appears frequently in agricultural work. Methods: This study investigated the changes of physiological factors such as heart rate, heart rate variability (HRV) and biomechanical factors such as physical activity and kinetic analysis in the task of twisting at the waist while lifting. Results: Heart rates changed significantly with the workload. The result indicated that the workload of 2 kg was light intensity work, and the workload of 12 kg was hard intensity work. Physical activity increased as the workload increased both on wrist and waist. Besides, stress index of the worker increased with the workload. Dynamic load to herniated discs was analyzed using inertial sensor, and the angular acceleration and torque increased with the workload. The proposed measurement system can measure the recipient's physiological and physical signals in real-time and analyzed 3-dimensionally according to the variety of work load. Conclusions: The system we propose will be a new method to measure agricultural workers' multi-dimensional signals and analyze various farming tasks.