• Title/Summary/Keyword: Legal engineering

Search Result 693, Processing Time 0.029 seconds

Design of Environmentally Sound Manufacturing Process of Fork Lift using LCA and DfE Methodology (LCA와 DfE기법을 이용한 친환경적인 지게차 제조공정의 설계)

  • Park, Kwang-Ho;Hwang, Yong-Woo;Park, Il-Do
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.7
    • /
    • pp.677-685
    • /
    • 2005
  • Life Cycle Assessment(LCA) and Design for Environment(DfE) method were applied to design the environmentally sound manufacturing process of f31k lift in this study. Not only external movement of LCA and DfE method in the legal and systemic phase, but also active researches of those in the development phase of case study and application to the industrial field, have been going on. In concretely, the manufacturing processes of the folk lift generating the most environmental impact were examined by applying LCA method, and the environmentally sound manufacturing process was designed by applying, DfE method to the processes. As the results of LCA, environmental impacts for the eco-toxicity and human toxicity of seven major environmental categories were in high value, and so be in the cutting & welding process and painting process among the manufacturing processes. High solid paints, increasing the solid content of the existing solvent paints used in painting process, were developed to reduce the environmental impacts generated in the painting process. By utilizing the high solid paints, about 20% of environmental impacts (as environmental index of LCA) could be reduced.

Consumer Awareness Analysis of Residential Building Underground Structure Leakage Prevention Measurements (공동주택 지하공간 누수 예방 기술 정책 수립을 위한 소비자 인식 분석 연구)

  • Han, Yoon-Jung;Oh, Kyu-Hwan;Kim, Su-Ryon;Kim, Byoung-Il;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.4
    • /
    • pp.379-387
    • /
    • 2016
  • In this study, a survey was conducted on the required measurement and waterproofing performance for residential building underground structure leakage prevention system. According to the results of the survey, it has been determined that leakage problem is considered to be quite severe, and many respondents have agreed. The legal guidelines and regulation systems do not reflect properly on the environmental requirements or conditions, resulting in continued leakage problem. In regards to this, a standardized waterproofing technique that can be used in underground areas of residential structures is required as an obligation and the development of high performance waterproofing method that allows for wet concrete surface adhesion and a guideline, design and maintenance method that allows the control of overall situational control of leakage is required.

A Relationship study between the internal marketing-related organizational factors in construction companies and corporate performance - Surveyed by executives and employees in Contractor - (건설기업 내부마케팅 구성요인과 기업성과 간의 관계 연구 - 시공사 임직원을 대상으로 -)

  • Lee, Jong-Sun;Park, Soon-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.65-77
    • /
    • 2013
  • Recent economic slump is making the construction industry's overall construction business environment worse. Contractors which are under the legal management and/or walk out are to the brink of 25 companies according to the Construction association of Korea released in 2011. It means that existing construction companies are required to transform the fundamental ideology of existing operation framework, and besides, existing companies should be transformed to service industry in order to proceed further into the developing future industries. In this study, it will be chosen the internal marketing related factor like 'Satisfying employees, internal customer, are the first thing to do in order to satisfy external customer.' which is about existing service industry field before its implementation in construction companies. In addition, appropriateness test will be performed including both interactions between each of the factors affect mutually and looking into any management improvement effects on contractors. And also, this proposal is suggested by approaching with internal marketing strategy which is both paradigm shift for customers by construction company members and another internal communication way as a means of overcoming the crisis of overall construction industry under currently happening.

Problem Analysis and Improvements Plans for PF ABCP of Apartment Housing Development Projects (공동주택 PF ABCP의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Soo-Yeol;Hwang, Uk-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.133-142
    • /
    • 2011
  • The purpose of this study is to analyze the problems of the parties involved in the issuance of apartment housing development projects. The adapted research method selected four apartment housing development as PF ABCP projects. This study carried out the case about participant institution of PF ABCP funding project including developer, constructor, financial institution so as to draw problems by participant institution. On the basis of the selected case, this thesis proposes methods for involved parties to negotiate and work out problems of the PF ABCP. The results of this study are as follows 1) Launching long-term project financing should be developed, including operating funds and strengthen the ABS and ABCP issuance of credit assessment procedures, combined with the simplicity of the instruments. 2) The Low-risk contract for the construction of simple managerial focus should be the construction, financial institutions essentially dependent on project financing feasibility verification purpose loans to prevent the division a true story, the development should be of interest to be preserved. The proposed included, among other, partial guarantee based on the construction plan financial institutions' share-based investment, and the supplement of legal issues.

Developing Aged-Housing Remodeling Technology for Improving Structural and Equipment performance;Introduction of Center for Aged-housing Remodeling Technology (노후 공동주택 구조 및 설비성능개선 기술 개발;2차년도 실적 및 차년도 연구계획 소개)

  • Han, Ju-Yeoun;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.190-196
    • /
    • 2007
  • As the number of aged-housing has been rapidly increased, many kinds of defects and problems such as degeneration of housing environment, structural performance, and equipment performance have been appeared. The reconstruction as the way to improve the aged-housing has been used mostly because the legal process of the reconstruction is relatively easy. On the other hand, it has caused problems such as the lack of natural aggregates, the environmental damages owing to construction wastes, the loss of national resources, and the lack of the housing for rent nearby the reconstruction area. This problems limit active tying into the reconstruction business at present in the industrial and political perspective. In this context, it is necessary to revitalize the remodeling rather than the reconstruction. In order to reach this objective, this research aims at identifying the user-oriented performance for the housing and deducing the core technology. It is expected that the result of this research can contribute to more revitalize the remodeling as tying researches in terms of design, structure, equipment, and construction.

  • PDF

A Study of the China Construction Laws and BOT Policies from Overseas EPC Contractor's View (중국 건설 법률과 BOT 정책에 대한 조사 연구;해외 EPC 건설업체의 관점)

  • Choi, Jae-Ho;Park, K.R.;Yun, H.J.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.519-522
    • /
    • 2007
  • China infrastructure construction market has huge potential for increased use of PPP/BOT mode and one of the most attractive markets of doing business. However, there are still a multitude of challenges for overseas EPC contractor to enter into the China PPP/BOT market both internally and externally. Especially, the construction legal system and relevant policies are considered at present the biggest barriers in accessing China construction market. Therefore, the main purpose of the paper is to identify the impact of the construction laws, regulations and BOT-related policies on the viability of foreign contractor-led BOT project in China. To the satisfaction of the purpose, this paper will first analyze China construction laws based on the key issues that must be tackled by foreign EPC contractor before they enter into China. This summary gives the possible contract scheme for a BOT project of interest in which foreign contractors could define the scope of works and measure the viability of the project. Finally, a case study of wastewater treatment plant BOT project in China subsequently illustrates some of the lessons learned from the foreign contractor's perspectives for successfully participating in future environmental market in China.

  • PDF

Evaluation of Handover Requirements of Construction Information for Efficient Facility Management (효율적인 자산관리를 위한 건설정보 이양요건 평가)

  • Lee, Ikhaeng;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.12-20
    • /
    • 2018
  • As facilities have become larger, more complex, and advanced, the importance of the facility management in the operation phase of the building is increasing. As a result, the scope of the facility management function is expanding, and the requirements of information are ever-increasing. However, inefficient exchange of information occurs due to duplicated tasks and lack of collaboration among the construction life cycle phases, resulting in cost loss. These low interoperability issues can be complemented by construction information management from a life cycle perspective. Efficient construction information management at each life-cycle stage is derived from the owner's will and is materialized through the construction information handover requirements by the owner. The purpose of this study is to develop an evaluation method of construction information handover requirements for facility management. In order to develop the method, facility management types and business functions are also classified and defined in this paper. Using the methodology proposed by this study, a case-study of evaluating the 'takeover items' submitted by contractors was performed for the purpose of research validation. The results of the case-study found that the most effective areas are in the order of 'legal informations', 'drawings', 'guides', etc. This study can be used as a reference data for deriving handover requirements for construction information at the early stage of the project.

Assessment of Risk of Exposure to Chemicals in the Analysis Centers of Organizations for measuring the Working Environment, using CHARM (CHARM을 이용한 작업환경측정기관 분석실의 화학물질노출 위험성 평가 연구)

  • Park, Hyun-A;Choi, Seo-Yeon;Woo, In-Sung;Rie, Dong-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.660-668
    • /
    • 2017
  • In this study, we conducted an assessment of the risks posed by the noxious chemicals often handled at the analysis centers of organizations involved in Work Environment Measurement (WEM) using the Chemical Hazard Risk Management (CHARM) system. For this purpose, six organizations involved in WEM located in Seoul and Gyeonggi, which conducted the risk assessment, were selected and, as a result, 29 materials were selected as chemical substances presenting a risk of exposure. In terms of their physical properties, there were 16 liquid and 10 solid materials, and for the special management materials (CMR), the findings were as follows: 'Carcinogenic' 1A - 11 and 1B - 1 (2 - 8); 'Mutagenic' 1A - 4 and 1B - 3 (2 - 8); and 'Repro-toxic' 1A - 0 and 1B - 1 (2 - 6). In the risk estimation, 30.4%, 66.1% and 3.6% of the materials presented 'low', 'average' and 'high' risks, respectively. In addition, two of these six institutions had materials presenting a 'high' risk. This study is significant in that the risk assessment was conducted using CHARM, a chemical substance assessment tool. It is expected that the results will be utilized as the basic data for safety assessment, the establishment of a plan for emergency measures and drawing up a safety management manual, and the institutional and legal management of accidents and risks in the analysis centers of organizations involved in WEM and the management of chemicals by drawing attention to the risks involved.

A Study on Improvement of Contract Regulations for Adjusting Contract Amount in Public Construction - Focused on examples of price fluctuation classification - (공공건설 계약금액 조정의 계약예규 개선방안 연구 - 물가변동 분류 사례 중심으로 -)

  • Lee, Wonjei;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.82-89
    • /
    • 2020
  • Article 64 of the Enforcement Decree of the National Contract Act The requirement of the pre-amendment statute related to the adjustment of the contract price was 5% or more of the price fluctuation rate from the date of the contract. However, the meeting requirement was changed from 5% or more to 3% or more from the date of signing of the Presidential Decree No. 19035 to 2005. 9. 8. The method of adjusting the contract amount was also changed to determine the contractor's desired adjustment method at the time of contract. Alleviating these requirements and revising the empowerment of contract partners is intended to prevent difficulties in achieving smooth objectives by applying to public construction contractors without unfairly benefiting or unfavorable to contract partners. Even if the standards are relaxed and the rights are secured as described above, if the existing provisions for the adjustment of price fluctuation are applied, unlike the original purpose of the government system, the Korea Bank's price economic statistics classification method and the contract construction classification criteria applied in public construction work Due to the inconsistency, it can be seen that the amount of adjustment for price fluctuation by construction type is excessive and underestimated. Therefore, the purpose of this study is to analyze problems through cases and to make appropriate construction cost adjustment through improvement measures.

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.