• Title/Summary/Keyword: Leakage monitoring

Search Result 319, Processing Time 0.026 seconds

Electrical Characteristic Changes of ZnO Varistors by Energy Absorption

  • Kim, Woo-Hyun;Hwang, Seong-Cheol;Wang, Guoming;Kil, Gyung-Suk;Ahn, Chang-Hwan
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.30 no.12
    • /
    • pp.817-821
    • /
    • 2017
  • As a ZnO varistor is subjected to electrical and environmental stresses, it degrades gradually, which may result in power interruption by short circuit. This study investigates changes in the electrical characteristics of ZnO varistors due to deterioration owing to energy absorption, and determines the optimal parameters for on-line diagnosis of the varistor. Two types of varistors were used for an accelerated aging experiment involving the application of the $8/20{\mu}s$ standard lightning impulse current. The electrical characteristics in terms of the reference voltage, total leakage current, resistive leakage current, and third-harmonic component of the total leakage current were measured, and their change rates were analyzed. The results revealed that the total leakage current increased slightly with an increase in the varistor absorbed energy, while the resistive leakage current and the third-harmonic component increased apparently. Therefore, the third-harmonic component of the total leakage current was proposed as the optimal parameter for on-line monitoring of ZnO varistor conditions.

An Predictive System for urban gas leakage based on Deep Learning (딥러닝 기반 도시가스 누출량 예측 모니터링 시스템)

  • Ahn, Jeong-mi;Kim, Gyeong-Yeong;Kim, Dong-Ju
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2021.07a
    • /
    • pp.41-44
    • /
    • 2021
  • In this paper, we propose a monitoring system that can monitor gas leakage concentrations in real time and forecast the amount of gas leaked after one minute. When gas leaks happen, they typically lead to accidents such as poisoning, explosion, and fire, so a monitoring system is needed to reduce such occurrences. Previous research has mainly been focused on analyzing explosion characteristics based on gas types, or on warning systems that sound an alarm when a gas leak occurs in industrial areas. However, there are no studies on creating systems that utilize specific gas explosion characteristic analysis or empirical urban gas data. This research establishes a deep learning model that predicts the gas explosion risk level over time, based on the gas data collected in real time. In order to determine the relative risk level of a gas leak, the gas risk level was divided into five levels based on the lower explosion limit. The monitoring platform displays the current risk level, the predicted risk level, and the amount of gas leaked. It is expected that the development of this system will become a starting point for a monitoring system that can be deployed in urban areas.

  • PDF

A study on the Application of a Monitoring System for Gas Insulaterd Switchgear (가스절연개폐장치용 감시시스템 적용에 관한 연구)

  • Kim, Jeong-Bae;Kim, Min-Su;Song, Won-Pyo;Kim, Deok-Su;Jeon, Chan-Seok;Gil, Gyeong-Seok
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.51 no.1
    • /
    • pp.22-30
    • /
    • 2002
  • ln this paper, it was reported the developed results of the monitoring unit for 72.5kY GIS which it is one part of the monitoring system for the substation that Korea Railway Company is promoting. In order to monitor the operational status of GIS, four parameters were chosen: the number of times of the circuit breaker switching, tightness of the gas-sealed units (circuit breaker / disconnecting switch / earthing switch), the number of times of the lightning arrestor operating and the leakage current of the lighting arrester. We constructed the monitoring system that can be judged the operating condition of the GIS from the signal of the suitable sensor for the purpose. Therefore, it is possible to on line monitoring for the condition of the GlS without efforts of the Periodic inspection.

Development of the Cabinet Panel of Real-Time Availability Checks for Electrical Disaster Decreasing at Traditional Markets (재래시장 전기재해 감소를 위한 실시간 확인이 가능한 분전반 개발)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Shin, Seong-Su;Bae, Seok-Myung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.3
    • /
    • pp.335-339
    • /
    • 2010
  • In this paper, in order to reduce the electrical disaster damage which is caused by with electrical equipment of traditional markets, we developed the cabinet panel and the electrical safety monitoring system which is able to monitor the electrical equipments condition(over current, leakage current, arc, WH, electrical fire factor etc.) at traditional markets. We constructed Test-bed for testing reliability of electrical safety monitoring system and cabinet panel. And we tested the cabinet for over current, leakage current and arc under the traditional markets actual condition. This paper will be used with the data for an demonstration project after compensating the defects which are occurred to operation of traditional markets actual loads.

Leakage experiments and applications of leakage detection algorithm in the pilot plant of water distribution system (상수관망 파일럿플랜트에서의 누수실험 및 누수탐지 알고리즘의 적용)

  • Kwon, Hyuk Jae
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.9
    • /
    • pp.609-616
    • /
    • 2017
  • In this study, algorithm for the selecting the optimum monitoring location and leakage detection algorithm based on back tracing calculation method were developed and verified by the experiments in pilot plant of water distribution system. First of all, optimum monitoring locations were selected and pressure changes were measured due to artificial leakage by pressure gauges in pilot plant. Simulations of leakage detection was performed for the verification of back tracing calculation method as a leakage detection method. From the results, it was found that leakage locations and leakage amount were exactly estimated. Various leakage amount from $0.0005m^3/s$ to $0.0018m^3/s$ were reproduced and leakage location was detected by back tracing calculation method. It was verified that back tracing calculation method as a leakage detection method is effective.

Application of Resistivity/SP Monitoring Technique to Maintenance of Water Utilization Facilities (수리시설물의 유지관리를 위한 비저항/SP 모니터링기법 연구)

  • Park, Sam-Gyu;Kim, Jung-Ho;Seo, Goo-Won;Won, Jong-Geun;Kim, Byung-Ho
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.71-76
    • /
    • 2005
  • The subject of this paper is research into the application of resistivity/SP monitoring to detecting the water leakage of water utilization facilities. For this purpose, we installed a comprehensive monitoring system consisting of resistivity/SP measurement, inclinometer, piezometer, and water gauge at an embankment, Using this monitoring system, we monitored the various kinds of measurement data and compared the resistivity structures and SP variations that of hydrological and engineering data in order to investigate the water leakage and stability of the embankment. The variations of resistivity and SP at the embankment were provided from the monitoring data and we could accurately locate the portions of which resistivities and SP have sharply changed, Furthermore, we could estimate the stability of the embankment more effectively and quantitatively by jointly interpreting the monitoring data of resistivity and SP, water level, pore water pressure, and subsurface displacement. The monitoring experiments in this study led us to the conclusion that for the efficient maintenance of the water utilization facilities, monitoring the resistivity and SP data would be much more preferable to performing the just one-time measurements.

  • PDF

Application of Electrical Resistivity Monitoring Technique to Maintenance of Embankments (저수지의 유지관리를 위한 전기비저항모니터링 기법 응용)

  • Park Sam Gyu;Kim Jung-Ho;Seo Goo Won
    • Geophysics and Geophysical Exploration
    • /
    • v.8 no.2
    • /
    • pp.177-183
    • /
    • 2005
  • The subject of this paper is research into the application of electrical resistivity monitoring to detecting the water leakage of water utilization facilities. For this purpose, we installed a comprehensive monitoring system consisting of resistivity measurement, inclinometer, piezometer, and water gauge at an embankment. Using this monitoring system, we monitored the various kinds of measurement data and compared the resistivity structures and that of hydrological and engineering data in order to investigate the water leakage and stability of the embankment. The variant images of electrical resistivity at the embankment were provided from the monitoring data and we could accurately locate the portion of which resistivities have sharply changed. Furthermore, we could estimate the stability of the embankment more effectively and quantitatively by jointly interpreting the monitoring data of resistivity, water level, pore water pressure, and subsurface displacement. The monitoring experiments in this study led us to the conclusion that for the efficient maintenance of the water utilization facilities, monitoring the resistivity data and hydrological data would be much more preferable to performing the just one-time measurements.

Development of Automation System of Water-Hydraulic and Leakage Test for Pressure Vessel (압력용기 수압 및 기밀시험 자동화 시스템 개발)

  • 이원희;김동수;이승현;김광영
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1672-1675
    • /
    • 2003
  • In this study, we developed full automation test system for pressure vessel. This pressure vessel containing oxygen, nitrogen and carbon is widely used in industrial field. The test items of pressure vessel are divided into three branches which is weight measurement, water-hydraulic, and leakage test. After leakage test is completed, cleaning and dry progress is carried out. And control system is consist of three controller which is PLC, monitoring system and database system. PLC is control all of system. Monitoring system measures weight, pressure, flow etc and display to all conditions. Database system stores tested data. we design system to control all test modules in communication by a second period with three control modules. Finally, we verified this system by field test.

  • PDF

Corrosion Reduction Techniques of Pipe Line Net Using DVGW (DVGW이론에 따른 상수관망의 부식방지에 관한 연구)

  • Choo, Tai-Ho;Kim, Ha-Il;Je, Sung-Jin;Ok, Chi-Youl
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.11
    • /
    • pp.310-316
    • /
    • 2006
  • Leakage of waterworks pipe line net cause loss of water resources, additional foundation of pressurization facilities from pressure loss and soil weakening near leaked pipe line, etc.. This makes it difficult to maintain and manage waterworks pipe line net and so cause serious economic loss. The rate of accounted water can be improved by monitoring always water pressure and flux, and so on. from isolated region, preparing positively against leakage accident and preventing leakage from occurring. Actually after isolating region, average rate of accounted water in this region went up 88.94% by continuously monitoring control of water pressure and inflow rate. It is about 9.44% higher than that of Busan metropolitan city in 2003, 79.5%.

  • PDF

Development and Performance Test of Online Electrical Safety Monitoring System Applying an Algorithm to Measure Resistive Leakage Currents using Phase Differences (위상차를 이용한 저항성 누설전류 측정 알고리즘을 적용한 온라인 전기안전 감시시스템의 개발 및 성능시험)

  • Yoo, Jeong Hyun;Kim, Hie Sik;Jeong, Yong Wook
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.3
    • /
    • pp.27-32
    • /
    • 2018
  • Nowadays, to prevent electrical accidents in Korea, inspectors directly performed checking general electrical facilities as a cycle from every one to three years. It is difficult to presuppose an omen because intact conditions of electrical equipments are not kept at the time of inspection. In this paper, in order to ensure effectiveness of an online basis electric inspection, we developed an electrical safety IoT system using LoRa communication technology to enable monitoring mainly electrical safety components such as overcurrent, overvoltage, resistive leakage current, and power. Then we proposed a method for verifying performances of the prosed electrical safety IoT system. Resistive leakage currents are calculated by using difference of phase between voltages and currents. We verified that average errors are 0.97%, which reference goal is ${\pm}5%$ for a device, through reliability test according to conditions. Results of this research can be used as basic study materials to develop technologies for measuring three phase leakage current and for implementing public electrical safety. platform.