• Title/Summary/Keyword: Leakage Repair

Search Result 172, Processing Time 0.025 seconds

Design of Leakage Current Detecting Equipment of an Arrester Diagnostic Type in a Distribution Line (배전선로용 피뢰기 진단형 누설전류 검출장치 설계)

  • Yoon, Gi-Gab;Park, Jong-Beom;Yoon, Suk-Mu;Lee, Seung-Hak;Kim, Hong-Pil;Kim, Kwang-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.501-503
    • /
    • 2000
  • Since an arrester has been generally used at the distribution line and abroad for the protection of electrical equipments against overvoltage (or abnormal surge) taking place in or from an electrical system, a fault, especially, in the distribution line is very likely to result in the destruction of insulation of other protection devices to cause an overall paralysis of a power system, a chaos. Considering the importance of arresters, its earlier replacement than its proposed life cycle causes an economical loss, and a negligence not to replace or repair it in time gives rise to a crucial accidence. The purpose of this paper is to invent an electric leakage current detector and to solve such problems by the continuous and regular inspection of an arrester.

  • PDF

Development of Standard Guideline for Water-leakage and Maintenance by parts of the Underground Structures in Multi-Family Housing - A Case Analysis of Water Leak Diagnosis - (공동주택 지하구조물의 부위별 표준 누수 진단 유지관리 지침 개발 - 누수 진단 사례 분석 -)

  • Kim, Soo Yeon;Lee, Jung Hun;Song, Je Young;Jang, Duk Bae;Oh, Sang Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.142-143
    • /
    • 2017
  • An analysis of the current water leak status of understand structure (underground parking lots, staircases, plumbing systems, water reservoirs, etc.) of multi-family housing in South Korea shows that water leaks are found from cracks in all areas of the underground structure caused by the degradation environment (water pressure by underground water, humidity, temperature, earth pressure, soil behaviour and vibration, etc.), which result in various problems, including mold, malodour, debonding of finishing materials, exfoliation, breakout, water leaks in electrical boxes, efflorescence, sedimentation of calcium hydroxide, decoloration, rusting, damages and pollution among others. Therefore, this study aims to analyse the current status of water leaks in underground structure and use the results as the basic data for developing a standard guideline for water leaks and maintenance by parts of the underground structure of multi-family housing.

  • PDF

Development of a Probability Model for Burst Risks of Water Main using the Analysis Methods of Leakage Type (매설환경에 따른 배수관망의 누수발생원인 특성분석)

  • Park, Sang-Bong;Choi, Tae-Ho;Koo, Ja-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.2
    • /
    • pp.141-152
    • /
    • 2011
  • In this study, we extracted effective factors of pipe burst from the status data of water asset, operating data of pressure, volume and etc. and 7 years' pipe burst and repair records. The extracted factors were sorted by each attribution and then a statistical analysis was performed to generate a pipe burst probability function using the logistic regression model. As the result, material, diameter, length, laying year, pressure and road width affected to pipe burst significantly. Especially, in case of small diameter, laying year was most effective factor and in case of steel pipe, external loading was main cause of burst, and in case of cast iron, PE, PC, HP pipes, the deterioration of joint was main cause. The other side, as a result of Hosmer-Lemeshow goodness of fit test the models are turned out significant statistically. Also the classification criteria were determined to minimize the total cost from classification errors, when the predicted probability was more than 18% this pipe could have a chance of burst.

Study on Leak Rate of SCC Degraded Alloy 600 Tubings of PWRs

  • Hwang, Seong Sik;Kim, Joung Soo;Kasza, Ken E.;Park, Jangyul
    • Corrosion Science and Technology
    • /
    • v.3 no.6
    • /
    • pp.233-239
    • /
    • 2004
  • Primary water stress corrosion cracking of steam generator tubings occur on many tubes in pressurized water reactors(PWRs), and they are repaired using sleeves or plugs. In order to develop proper repair criteria, it is necessary to know the leak behavior of the tubes, which have stress corrosion cracks. Crack development tests were carried out on the tubes at room temperature, and leak rate and burst pressure were measured on the degraded tubes at room temperature and a high temperature. No leakage was detected on the tubes where 100 % through wall crack developed, at 1560 psi, which is an operating pressure difference of pressurized water reactors(PWRs). In some tests, leak rates of the tubes increased with time at a constant internal water pressure. A test tube showed a very small amount of leakage at 2700 psi in a high temperature pressure test at $282^{\circ}C$, but it disappeared after the pressure increased slightly. Even cracks are 100 % through wall, they need to open in order to reach a certain amount of leak rate at the operating pressure difference.

Current perspectives of bio-ceramic technology in endodontics: calcium enriched mixture cement - review of its composition, properties and applications

  • Utneja, Shivani;Nawal, Ruchika Roongta;Talwar, Sangeeta;Verma, Mahesh
    • Restorative Dentistry and Endodontics
    • /
    • v.40 no.1
    • /
    • pp.1-13
    • /
    • 2015
  • Advancements in bio-ceramic technology has revolutionised endodontic material science by enhancing the treatment outcome for patients. This class of dental materials conciliates excellent biocompatibility with high osseoconductivity that render them ideal for endodontic care. Few recently introduced bio-ceramic materials have shown considerable clinical success over their early generations in terms of good handling characteristics. Calcium enriched mixture (CEM) cement, Endosequence sealer, and root repair materials, Biodentine and BioAggregate are the new classes of bio-ceramic materials. The aim of this literature review is to present investigations regarding properties and applications of CEM cement in endodontics. A review of the existing literature was performed by using electronic and hand searching methods for CEM cement from January 2006 to December 2013. CEM cement has a different chemical composition from that of mineral trioxide aggregate (MTA) but has similar clinical applications. It combines the biocompatibility of MTA with more efficient characteristics, such as significantly shorter setting time, good handling characteristics, no staining of tooth and effective seal against bacterial leakage.

A Literary Study on the Management of the JeongJaGak(丁字閣, T shaped building) of the Joseon Royal Tombs in the Late Joseon Dynasty - Focusing on the JeongJaGak damage record of Gakneung Suri Deungnok(Records relating to the repair of royal tombs, 1675-1713) - (조선 후기 왕릉 정자각 관리에 대한 문헌적 고찰 -『각릉수리등록(各陵修理謄錄, 1675-1713년)』의 정자각 훼손기록을 중심으로-)

  • Hong, Eun-Ki;Hwang, Jong-Kook;Chang, Hun-Duck
    • Journal of architectural history
    • /
    • v.32 no.2
    • /
    • pp.37-48
    • /
    • 2023
  • A literature study was conducted on the management of the pavilion of the royal tomb in the late Joseon Dynasty, focusing on "Gakneung Suri Deungnok(Records relating to the repair of royal tombs)". This study analyzed the royal tomb management system, organized the types of damage identified in the building, and examined how the damage status was recorded by type. In the above, the records related to the 1675~1713 repair of three JeongJaGak(Geonwonneung, Sungneung, and Mokneung), which are registered as state-designated cultural properties, are summarized in three aspects: management system, damage status, and expression words. The results of the study are as follows. First, the royal tomb pavilion was regularly inspected by Observator(觀察使) in spring and autumn, and Surunggwan(守陵官) every 5th, and Servant(守僕) regularly inspected every day and night, and also inspected and reported emergency cases of natural disasters or unexpected damage. Second, the damage status of each building was continuously observed and reported for the continuous maintenance of the buildings in the royal tomb. A total of 75 records of damage to the three royal tombs' pavilion were found to have been most frequently inspected, including 19 cases (25.3%), 14 cases (18.7%), 23 cases (30.7%) of the roof, and 19 cases (25.3%) of the roof. Third, the expression of the damage status is confirmed in various ways, such as separation, separation, burst, damage, excitation, moisture, leakage, and exfoliation. Among them, the main damage records were confirmed due to the separation of the base from the peeling, the furniture, cracks, leaks, leaks in the roof, and the collapse of the roof was able to check the damage records.

Interrupted Single-layer Suture Technique in Esophageal Anastomosis Using Monofilament Polypropylene Suture (Monofilament Polypropylene사를 이용한 단속단층 식도문합술)

  • 성시찬;편승환
    • Journal of Chest Surgery
    • /
    • v.31 no.7
    • /
    • pp.711-717
    • /
    • 1998
  • Background: Although various anastomotic techniques and suture materials have been used in esophageal anastomosis, anastomotic leakage and stenosis are still somewhat frequent and serious complications when compared to other intestinal anastomoses. We have used interrupted single-layer suture technique using monofilament polypropylene suture in various esophageal anastomoses, including repair of the esophageal atresia, since 1990. Methods and method: We retrospectively evaluated the efficacy of this technique on postoperative leakage and stenosis in several esophageal reconstructions. The esophageal reconstructions using this technique were performed in 90 patients at Dong-A University Hospital from April 1990 through December 1996. Results: Anastomotic leakage occurred in 5 patients(5.6%) with one operative death. Stenosis at the anastomotic site occurred in 15 patients(n=86, 17.4%), which was most common in esophagogastrostomy(22%) and least common in esophagocolostomy (5%). This result was comparable to other methods including the autosuture technique. Conclusions: We concluded that this suture technique in esophageal anastomosis can be used with reasonable results in various esophageal reconstructions including correction of the esophageal atresia.

  • PDF

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Production of SCC Flaws and Evaluation Leak Behavior of Steam Generator Tubes (누설 및 파열실험용 SCC 결함 전열관 제작 및 누설거동 평가)

  • Hwang, Seong-Sik;Jung, Man-Kyo;Park, Jang-Yul;Kim, Hong-Pyo
    • Corrosion Science and Technology
    • /
    • v.8 no.5
    • /
    • pp.188-192
    • /
    • 2009
  • A forced outage due to a steam generator tube leak in a Korean nuclear power plant was reported.1) Primary water stress corrosion cracking has occurred in many tubes in the plant, and they were repaired using sleeves or plugs. In order to develop proper repair criteria, it is necessary to understand the leak behavior of the tubes containing stress corrosion cracks. Stress corrosion cracks were developed in 0.1 M sodium tetrathionate solution at room temperature. Steam generator(SG) tubes with short cracks were successfully fabricated with a restricted solution contact method. The leak rates of the degraded tubes were measured at room temperature. Some tubes with 100 % through wall cracks showed an increase of leak rate with time at a constant pressure.

Three dimensional finite element analysis of 4 inch smart flange on offshore pipeline

  • Moghaddam, Ali Shaghaghi;Mohammadnia, Saeid
    • Ocean Systems Engineering
    • /
    • v.4 no.4
    • /
    • pp.279-291
    • /
    • 2014
  • Smart flanges are used for pipeline and riser repair in subsea. In a typical case in the gas export pipeline project, the end cap bolts of a 4inch smart flange were broken during operation, and in turn leakage occurred. This work presents the detail of three dimensional finite element analysis of the smart flange to support the observed end cap bolts failure. From finite element analysis it turns out that in the presence of external bending moment, an uneven contact distribution is present between seal and end cap, which in turn changes the uniform load distribution on bolts and threaten the integrity of bolts. On the other hand, 3D finite element analysis of interaction between pipeline and seabed is presented by means of Abaqus to explore the distribution of bending moment along the pipeline route. It is found that lateral buckling occurs in the pipeline which introduces large bending moment.