• Title/Summary/Keyword: Leadtime

Search Result 24, Processing Time 0.02 seconds

Asymptotic Analysis on Service Differentiation with Customer Arrival Information (고객 도착 정보를 이용한 서비스 차별화에 관한 점근적 분석)

  • Choi, Ki-Seok
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.2
    • /
    • pp.115-135
    • /
    • 2008
  • An interesting problem in capacitated supply chains is how to guarantee customer service levels with limited resources. One of the common approaches to solve the problem is differentiating service depending on customer classes. High-priority customers receive a better service at the cost of low-priority customers' service level. One of common criteria to determine a customer's priority in practice is whether he has made a reservation before arrival or not. Customers with a reservation usually receive service based on the time the reservation was made. We examine the effect this advance information of customer arrival has on customer service levels. We show the trade-offs between the leadtime and other system characteristics such as the proportion of high-priority customers. when the service level is high. We also suggest how to differentiate service using the asymptotic ratio of the service levels for both types of customers.

A Stochastic Partial Backorder Inventory Model with a Backorder Ratio Depending on Backorder periods (부재고기간(負在庫期間)에 의존하는 부재고비율(負在庫比率)을 갖는 확률적(確率的) 부분부재고(部分負在庫)모델)

  • Kim, Jung-Ja
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.1
    • /
    • pp.127-136
    • /
    • 1998
  • This paper presents a stochastic partial backorder inventory model for the situation in which demand follows normal distribution and back order ratio during that stockout period decreases exponentially according to the length of backorder period. In the paper, an objective function is formulated to minimize the average annual cost, which is the sum of the ordering, carrying, time-proportional backordering, and lost sales cost. And then sensitivity analysis for various exponential backorder ratios and standard deviations of leadtime demand are presented. The inventory model in the paper is reduced to a backorder model and lost sales model, when backorder ratio is 1 and 0, respectively.

  • PDF

Numerical Analysis of Forming for KEP engine Sheet matal part (KFP 엔진 박팍 부품 드로잉 성형해석)

  • 오성국;정완진;안홍;이영호
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1994.06a
    • /
    • pp.163-172
    • /
    • 1994
  • The Aerospace and automobile industries have need to avoid sheet-metal forming problem such as incorrect springback after forming and trimming process, excessive thinning/tearing, wrinking/perkering. It is common practice to use costly trial-and-error experimental methods to develop tooling and manufacturing process parameters. Experimentation should be complemented with computer simulation to reduce cost and leadtime in manufacturing and to influence the design of components. In this study, firstly we solved the springback problem after drawing and trimming process of KFP(F100-229) engine airsealing bearing support part(53H00) forming and studied on the effect of several process parameters on the gap between the formed blank and punch shape using the implicit F.E.M code(ABAQUS). Secondly by the three dimensional dynamic analysis using the explicit. F. E. M code (LS-DYNA3D), we studied on the effect of several process parameters which can be used for avoid tearing and wrinking during the drawing process.

An One-for-One Ordering Inventory Policy with Poisson Demands and Losses with Order Dependent Leadtimes

  • Choi, Jin-Yeong;Kim, Man-Sik
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.27-33
    • /
    • 1987
  • A stochastic model for an inventory system in which depletion of stock takes place due to random demand as well as random loss of items is studied under the assumption that the intervals between cussessive unit demands as well as those between cussessive unit losses, are independently and identically distributed random variables having negative exponential distributions with respective parameters .mu. and .lambda. It is further assumed that leadtime for each order is an outstanding-order-dependent random variable. The steady state probability distribution of the net inventory level is derived under the continuous review (S -1, S) inventory policy, from which the total expected coast expression is formulated.

  • PDF

An approach for inventory routing problem using TOC in supply chain (공급사슬 환경에서 제약이론을 적용한 재고 보충 및 차량경로문제 결정)

  • Kim Gang-Tae;Lee Yeong-Hae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.179-186
    • /
    • 2006
  • There was a lot of research to integration of the transshipment and inventory problem in supply chain. Such a integration of inventory and transshipment problem called IRP (Inventory Routing Problem). We consider a distribution problem in which a set of products has to be shipped from a supplier to several retailers in a given planning horizon. Transshipment from the supplier to the retailer is performed by vehicles of limited capacity. Each retailer determines replenishment leadtime and order quantity with buffer management. A supplier determines optimal vehicle routing in supply chain. We suggest a heuristic algorithm which be used TOC buffer management in a replenishment problem and a tabu search algorithm in VRP (Vehicle Routing Problem).

  • PDF

A Study on enhancement of emotional quality of prototype-car (시작 차량 감성 품질 개선에 관한 연구)

  • 최재원;양화준;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.358-361
    • /
    • 2000
  • To reduce the leadtime for a new model according to the strict market requirements, automobile manufacturer begins to utilize 3-dimensional CAD based techniques such as DMU(Digital Mock-Up). RP(Rapid Prototyping), VE(Virtual Engineering). But, not so many satisfactory utilities have been introduced to deal with the emotional properties such as embossment on the surface of interior parts and touch from material characteristics in virtual environment. It is required to manufacture prototype parts to verify actual feeling of the passengers in real automobile. This paper suggests a methodology to enhance emotional property via embedding embossment on the surface of prototype car interior trim without deterioration of dimensional accuracy using RIM(Reaction Injection Molding) and vacuum forming method.

  • PDF

A Framework of the Integrated Production/Distribution Model with Non-Integer Lags (비정수 지연시간을 고려한 통합 생산/분배 모형)

  • Kim, Jong Soo;Shin, Ki Young;Moon, Chi Ung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.31 no.2
    • /
    • pp.120-126
    • /
    • 2005
  • Until now, the traditional production models and logistics have developed a broader strategic approach called supply chain. However, there are some obstacles to apply industry practice because of unrealistic assumptions. The most serious of them is that they assume the lead times are integer multiples of the planning time grid. This assumption makes it difficult to express the processing and transportation lags correctly. Thus, in this paper, we propose a new methodology for the integrated production/distribution model having non-integer time lags using the concept of dynamic production function. In case that the time lags are integer or non-integer, the dynamic production function reflects well the situation under given environments. Experiments show that the proposed model can express the real system more accurately than the prior model can.

Building an Efficient Supply Chain by reduction of lead time with a Focus on Korea Server Manufacturer (리드타임 감소에 의한 효율적 공급체인 구축 - 국내 서버 공급체인을 대상으로 -)

  • 신용석;김태현;문성암
    • Journal of Distribution Research
    • /
    • v.6 no.2
    • /
    • pp.1-17
    • /
    • 2002
  • The recent dot-com craze has been one of the main causes that accelerated the growth of internet-related companies in diversity as well as in size. Meanwhile, the domestic market of supplies and equipment for internet businesses has been dominated by major foreign companies. To regain their market positions, the domestic manufacturers had to find the way to build up their competitive advantages, such as meeting their customers needs and reducing overall costs. In this study, one domestic PC server manufacturer, which competes fiercely with foreign manufacturers for the top place, has been chosen as a model to evaluate its current supply chain and to find an area that can be improved for a better performance. System Dynamics is used throughout the study. The central concept to system dynamics is understanding how all the objects in a system interact with one another. It focuses on feedback and secondary effects to think through how a strategy might or might not work, depending on how organizational changes are received, and what kinds of consequences emerge. Then, computerized models were built for simulations, each with different conditions, and, finally, the results were evaluated based on some criteria which are considered to be important and meaningful. The inefficiency that exists in the supply chain was proved to be a thirty-day long purchasing order leadtime, and it was expected that more effective supply chain could be formed if the leadtme were reduced to 14 days or 7 days. The results of simulations showed that the overall expected costs in supply chain was the least with the purchasing leadtime being 7 days. The lower average number of parts held as inventory, along with the reduced lost sales, acted as the factor reducing the expected overall costs. Although there was a slight increase in the average number of final products held as inventory and the total ordering cost, the benefits from lower parts inventory and reduced lost sales were large enough to justify the overall cost reduction.

  • PDF

Development of the Collaborative Electronic Quotation System in the Mold Plant (금형공장의 협업적 전자주문처리 시스템 개발)

  • Choi Yong-Ju;Leem Chun-Seong;Shin Ki-Tae;Heo Young-moo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.1116-1121
    • /
    • 2003
  • 현재 금형공장에서는 변화하는 시장에 빠른 반응을 보이고, 생산하고 있는 제품의 높은 품질과 낮은 가격을 보장하기 위하여 기존 시스템과 인터넷을 접목하려는 많은 시도를 하고 있다 금형공장에는 ETO(Engineering To Order) 방식의 제조방식과 사출금형의 특수성으로 인하여 표준견적 시스템의 개발이 어렵다. 그리고 영업과 수주에 반영할 객관적인 정보가 없으며 고객의 요청 시 실시간으로 확인가능한 정보가 존재하지 않는다. 이러한 금형공장의 특징을 반영하고, 문제점을 극복할 수 있는 협업적 전자주문 처리 시스템의 프레임웍(framework)을 설계하고, 또한 각 세부 모듈인 견적가격 산정기능(Cost Estimation Tool), 납기 가능일자 산정기능(Leadtime Tool), 주문상황 응답처리 기능(Order Status Tool), 작업상황 파악기능(Shop Status Tool)을 설계한다. 그리고 현장 적용이 가능하도록 하기 위하여 금형공장의 업무 프로세스를 분석한다. 그리고 주문처리 프로세스의 UMM 방법론 모델링을 통하여 원형(prototype) 시스템을 설계 및 개발하고자 한다.

  • PDF

A Study of Piping Leadtime Forecast in Offshore Plant’s Outfittings Procurement Management (해양플랜트 의장품 조달관리를 위한 배관 공정 리드타임 예측 모델에 관한 연구)

  • Ham, Dong Kyun;Back, Myung Gi;Park, Jung Goo;Woo, Jong Hun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.1
    • /
    • pp.29-36
    • /
    • 2016
  • In shipbuilding and offshore plant construction, pipe-stools of various types are installed. Moreover, these are many quantities but they must be installed in a successive manner. Due to these characteristics the pipe-stool installation processes easily tends to cause the schedule delays in the overall production processes. In order to reduce delay, the goal of this study is to predicts production’s lead time before manufacturing. Through this predictions it’s expected to reduce total production’s lead time by improving it's process. First of all, we made MLR(Multiple Linear Regression) and PLSR(Partial Least Square Regression) model to predict pipe-spool's lead time and then compared predictability of MLR and PLSR model. If a explanatory variable is added, it will be possible to predict results precisely.