• Title/Summary/Keyword: Large-scale test facility

Search Result 86, Processing Time 0.025 seconds

Experimental investigation on a freestanding bridge tower under wind and wave loads

  • Bai, Xiaodong;Guo, Anxin;Liu, Hao;Chen, Wenli;Liu, Gao;Liu, Tianchen;Chen, Shangyou;Li, Hui
    • Structural Engineering and Mechanics
    • /
    • v.57 no.5
    • /
    • pp.951-968
    • /
    • 2016
  • Long-span cross-strait bridges extending into deep-sea waters are exposed to complex marine environments. During the construction stage, the flexible freestanding bridge towers are more vulnerable to environmental loads imposed by wind and wave loads. This paper presents an experimental investigation on the dynamic responses of a 389-m-high freestanding bridge tower model in a test facility with a wind tunnel and a wave flume. An elastic bridge model with a geometric scale of 1:150 was designed based on Froude similarity and was tested under wind-only, wave-only and wind-wave combined conditions. The dynamic responses obtained from the tests indicate that large deformation under resonant sea states could be a structural challenge. The dominant role of the wind loads and the wave loads change according to the sea states. The joint wind and wave loads have complex effects on the dynamic responses of the structure, depending on the approaching direction angle and the fluid-induced vibration mechanisms of the waves and wind.

Demonstration-scale Offshore CO2 Storage Project in the Pohang Basin, Korea (포항분지 해상 중소규모 CO2 저장 실증연구)

  • Kwon, Yi Kyun
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.133-160
    • /
    • 2018
  • $CO_2$ storage is a very important technology for reduction of greenhouse gas emissions and has been considered as almost the only viable and effective option for immediate large-scale $CO_2$ sequestration. Small-scale demonstration project for offshore $CO_2$ storage in the Pohang Basin is the transitional stage R&D program for technological preparation of large-scale $CO_2$ storage project in Korea. Through the extensive exploration research for prospective $CO_2$ storage sites, the offshore strata in the Pohang Basin was recommended for the storage formation of the small-scale demonstration project. The Pohang Offshore Storage Project launched at 2013, and has accomplished the technical demonstration and technological independence in a wide range of $CO_2$ storage technology, such as geophysical exploration, storage site characterization, storage design, offshore platform construction, injection-well drilling and completion, deployment of injection facility, operation of $CO_2$ injection, and $CO_2$ monitoring. The project successfully carried out $CO_2$ test injection in early 2017, and achieved its final goal for technical development and demonstration of $CO_2$ storage in Korea. The realization of $CO_2$ injection in this project is the measurable result and has been recorded as the first success in Korea. The Pohang Offshore Storage Project has a future plan for the continuous operation of $CO_2$ injection and completion of $CO_2$ monitoring system. The project has provided in-house technical and practical expertises, which will be a solid foundation for the commercial-scale $CO_2$ storage business in Korea. Additionally, the project will help to secure national technical competitiveness in growing international technology market for $CO_2$ storage.

The Research Relating to QA of the Absorbed Dose in the 10 MeV E-beam Facility in Accordance with the International Standards (국제표준에 따른 10 MeV급 전자빔 조사시설의 흡수선량 품질보증에 관한 연구)

  • Ha, Tae-Sung;Ahn, Cheol;Jung, Pyeong-Hwan;Cho, Jeong-Hee;Lee, Jong-Seok;Lee, Hye-Nam;Yoo, Beong-Gyu
    • Journal of radiological science and technology
    • /
    • v.33 no.4
    • /
    • pp.387-394
    • /
    • 2010
  • In the field of healthcare, the conventional sterilization treatments have been replaced by irradiation methods which are in accordance with internationally well established quality standards. The quality control in radiation sterilization assures that the absorbed dose of the irradiated material is in agreement with its requirements and standards. The electron beam irradiation requires technical assessments of more process parameters than gamma irradiation does. Korea has witnessed wide uses of electron accelerators since early 2000 but there hasn't been research experiences relating to quality system in accordance with international standards. The new large scale e-beam irradiation system with the specification of 10 MeV, 8 kW was installed and operated in 2008 by Seoul Radiology Services Co. It consists of the electron accelerator, product handling system, safety, documentation and control subsystems into an integrated system to meet the requirement of the Good Manufacturing Practice such as process quality assurance and management of product tracking records. To implement the international standard such as EN ISO11137, it is necessary to understand the purposes aimed in the standard and carry out the tests following the procedures required. This study presented the specification of the e-beam facility and showed what its design requirements and features are. The test results on a variety of process parameters were presented and validated it they are within the required limits.

A study on the development of distribution simulator and simulation results for use in distribution automation system of IEC 61850 protocol (IEC 61850 프로토콜의 배전자동화시스템에 사용을 위한 배전시뮬레이터 개발과 시뮬레이션 결과에 관한 연구)

  • Kim, Jae-Hong;Oh, Jae-Gon
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.15 no.2
    • /
    • pp.95-102
    • /
    • 2022
  • It is a study for the evaluation of the stability of the distribution automation system for the expansion of renewable energy. Through the Renewable Energy 3020 Implementation Plan, the government plans to expand new renewable energy and convert it to participatory energy that improves the quality of life of the people by 2030. The government has set a target of 20% of domestic supply energy for renewable energy generation by 2030. It is planning to establish more than 95 percent of its new facilities with clean energy such as solar power and wind power. By expanding the supply of renewable energy, new energy businesses and distributed power industry were fostered, and short-distance, low-voltage, and small-scale power generation were rapidly expanded rather than large-scale power development in the past. Due to this demand, the importance of power distribution facility operation has emerged and the need for distribution automation system is increasing. This paper discusses the development of a power distribution simulator for the performance and function evaluation of power distribution automation systems and presents the results of an interlocking test with the power distribution automation system. In order to introduce an advanced system into the power distribution system, it is necessary to take advantage of the transmission and distribution system. The DNP3.0 protocol is used in the distribution system and the IEC61850 protocol is used in the transmission and distribution system. It was concluded that the functions and performance of operations were satisfied when these two protocols are mixed and used in the distribution automation system.

Analysis of Permanent Deformation under Repetitive Load Based on Degraded Secant Modulus (할선탄성계수를 이용한 반복하중 하 지반의 영구변형 해석)

  • Ahn, Jaehun;Oh, Jeongho;Shin, Hosung
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.2
    • /
    • pp.15-21
    • /
    • 2013
  • The analysis of long-term performance of pavement sections under wheel loads is normally conducted in two separated steps. First the resilient behavior of the pavement is calculated assuming the pavement is a layered or discrete elastic medium, and then the permanent deformation is evaluated based on empirical permanent displacement equations. Material properties required in both steps can be obtained from cyclic triaxial tests, in other words, resilient and permanent deformation tests. While this analytical approach is simple and convenient, it does not consider the modulus degradation caused by cyclic loads, and some types of reinforcements such as geosynthetic cannot be modeled in this type of analysis. A model for degraded secant modulus is proposed and suggested to be used for the analysis of permanent behavior of unpaved roadway sections. The parameter for suggested model can be obtained from cyclic triaxial tests, regular practice in pavement engineering. Examples to estimate the model parameters are presented based on both laboratory permanent deformation test and large-scale plate load test.

Case Study on the Improvement of Pollutant Removal Efficiency in Sihwa Constructed Wetland (시화호 인공습지의 수질정화기능 향상을 위한 사례연구)

  • Choi, Don-Hyeok;Kang, Ho;Choi, Kwang-Soon
    • Journal of Wetlands Research
    • /
    • v.12 no.2
    • /
    • pp.25-33
    • /
    • 2010
  • Three plans(induction of water flow, supply of oxygen into water, control of fish causing resuspension of solids) proposed to improve the pollutant removal efficiency of Sihwa Constructed Wetland(CW) were estimated by considering the their efficiency and application to the wetland. After construction of facility for induction of water flow in lower part(W 122m${\times}$L 103m) of the wetland, the mean removal efficiencies of BOD, SS, TN and TP were in range of 12.8~37.4% and BOD was showing the highest efficiency. This result indicates that water flows is one of very important factors in the pollutant removal of wetland, especially near the outlet of a large scale wetland such as Sihwa CW. Dissolved oxygen(DO) concentrations after operation of two oxygen supply systems such as Air Bubble Diffuser and Surface Aeration System increased 15.5% and 27.2%, respectively. For maintaining effective DO concentration in Sihwa CW, the operation of oxygen supply system may be desirable during midnight to dawn in the location in which DO concentration is not enough, for instance less than 2 mg/L in CW. In experiments of the fish removal from Sihwa CW, the mean turbidity was lower in test site(6.2 NTU) than control site(10.6). The removal efficiency of thurbidity by th fish removal from the wetland was 41.5%. Therefore, a relevant fish management through a periodical monitoring of fish and turbidity is needed.