• Title/Summary/Keyword: Large-scale road section

Search Result 14, Processing Time 0.026 seconds

The Study on Damaged Hanbuk Mountain Range in Gyeonggi-Do (경기도 한북정맥 훼손유형 연구)

  • Seo, Jung-Young;Lee, Yang-Ju
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.4
    • /
    • pp.65-74
    • /
    • 2010
  • This study is for Hanbuk Mountain Range within Gyeonggi province which is to propose the conservation plan by each damage pattern through site survey of the mountain range. The damage patterns are classified by siding, pointing and lining. The total damaged area is 103 areas: The siding pattern is damaged by developing farmland, mineral and quarry mining, dam, large scale development complex and cemetery park; The pointing pattern is including the development of road, transmission tower and way and mountaineering trail; The construction of electricity and communication facility, military facility, mobile communication station, heliport and shelter. The damages by developing road and large scale development complex are the most cause, and military facility, dam and reservoir, and residential area are the main causes, respectively. One of the compromised situation Hanbuk-Mountain Range usage as per section 7 section (18.45%), 12 section (18.45%) is the largest number of compromised has been surveyed, undermine the situation if you look at the usage by the road 25 locations (24.22%), military facilities and dam and reservoir to undermine this 11 established respectively (10.68%) were the most undermine. Therefore, this research propose the conservation plan as follow: first, need to understand, educate and publicize on Hanbuk-Mounatin Range; second, manage through the regulations and ordinance of Gyeonggi province; third build and expand the law for protecting Baekdu-Great Mountain Range.

A Competition-based Algorithm for Routing Discovery and Repair in Large-scale VANET

  • Wu, Cheng;Wang, Lujie;Wang, Yiming
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.12
    • /
    • pp.5729-5744
    • /
    • 2017
  • Vehicular Ad Hoc Networks (VANET) in the large-scale road section usually have typical characteristics of large number of vehicles and unevenly distribution over geographic spaces. These two inherent characteristics lead to the unsatisfactory performance of VANETs. This poor performance is mainly due to fragile communication link and low dissemination efficiency. We propose a novel routing mechanism to address the issue in the paper, which includes a competition-based routing discovery with priority metrics and a local routing repair strategy. In the routing discovery stage, the algorithm uses adaptive scheme to select a stable route by the priorities of routing metrics, which are the length of each hop, as well as the residual lifetime of each link. Comparisons of different ratios over link length and link stability further show outstanding improvements. In the routing repair process, upstream and downstream nodes also compete for the right to establish repair process and to remain as a member of the active route after repair. Our simulation results confirm the improved performance of the proposed algorithm.

Practical 2-Arch Road Tunnel Design in Mountainous area (산악지형에서 효율적인 2-Arch 터널의 설계사례)

  • Jeong, Kyeong-Han;Lee, Joo-Gong;Han, Sung-Su;Hwang, Yong-Sub;Kim, Ji-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.601-612
    • /
    • 2005
  • In mountainous area, Two parallel tunnels have been usually recognized as a road tunnel which has benefits in aspects of cost and stability. However, Design and construction of 2-Arch road tunnel are growing recently due to environmental destruction, compensation of land and difficulty of route separation. As studies are mainly undergoing on only guaranteeing stability and developing a waterproofing-drainage system to avoid water leakage through comprehension for characteristics of 2-arch tunnel behaviors, there is a tendency to evaluate quantity of support by empirical method with a tunnel which has a complicated cross-section and lack of construction ability. In this study, therefore, we made a plan of tunnel cross-section which had shown good construction ability and developed the waterproofing-drainage system which is able to solve the water leakage problem fundamentally by analyzing precedented 2-arch tunnels and investigating their sites in and out of nation. We also determined fixed quantity of support by a large-scale model test and numerical analysis. We want to contribute to 2-arch tunnel design hereafter introducing design procedure and method applied here.

  • PDF

한강 연안 경관 녹화 계획

  • 권오준
    • Proceedings of the Korean Professional Engineer Association Conference
    • /
    • 1995.12b
    • /
    • pp.23-29
    • /
    • 1995
  • Green landscape plan to the riverfront area of the Han River The Han River, one of the symbolic elements in metropolitan Seoul, structures an axis of waterscape as the openspace crossing east to west of the city of Seoul. As riverside urban motorway(88 Olympic motorway) and riverside public park were constructed by the Han River Comprehensive Development Project in 1986, the necessity of general plan for the in-stallation of envirommental facility belt to conserve living enviroument is being required with relation to, dense residential areas closed to the river Therefore, the goal of the study is to provide better riverview and to increase environmental purifi-cation ability as a large scale waterscape axis by the preparation of landscape plan to the riverfront area of Han River, In order to achieve the goal, the study deals with sectional speciality, the introduction of landscape assessment techniques and ecological approach to given environment. As unity is kept through whole waterfront area, the area is divided into 9 zoning sections to study development methods for each section, and themes for speciality are given to each section, and the. sort of plants which can be symboliged to the area is selected. Also, the planting methods for harmony with the type of road structure and riverscape is offered. Though the study may give significane to the image and the function of riverside road, in con-clusion, the characteristic ecological approach to the river is so limited that has not been reflected enough on the plan. It is expected that the study should be continued, and long-term riverfront openspace plan, environmentally sustainable, should be arepared.

  • PDF

Risk analysis and countermeasures for subsea tunnel planning of national road 77 construction work between Abhae and Hwawon (압해-화원 간 국도77호선 건설공사 해저터널 계획을 위한 리스크 분석 및 대책방안)

  • Kim, Young-Joon;Kim, Zu-Cheol;Lee, Jae-Sung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.15-38
    • /
    • 2022
  • Recently, tunnel technology in Korea has shown various achievements such as long tunnel and large section by tunnel construction using TBM in Korea and abroad. Especially subsea tunnels are frequently designed and constructed. The Ga-deok subsea tunnel was completed in December 2010, and the Incheon North Port Tunnel was opened and operated in 2017, and the Bo-ryeong subsea tunnel between Dae-cheon Port and Won-san Island will be completed in 2021. In foreign countries, many subsea tunnels have been constructed and operated in such as Norway and Japan. The main technical problem in the construction of subsea tunnel is to secure stability due to high water pressure conditions and large-scale seawater inflow in fault zones and weak zones. In this paper, various risk factors and solutions are described in the subsea tunnel planning of national road 77 construction work between Abhae and Hwawon.

A study on the enhancement and performance optimization of parallel data processing model for Big Data on Emissions of Air Pollutants Emitted from Vehicles (차량에서 배출되는 대기 오염 물질의 빅 데이터에 대한 병렬 데이터 처리 모델의 강화 및 성능 최적화에 관한 연구)

  • Kang, Seong-In;Cho, Sung-youn;Kim, Ji-Whan;Kim, Hyeon-Joung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.6
    • /
    • pp.1-6
    • /
    • 2020
  • Road movement pollutant air environment big data is a link between real-time traffic data such as vehicle type, speed, and load using AVC, VDS, WIM, and DTG, which are always traffic volume survey equipment, and road shape (uphill, downhill, turning section) data using GIS. It consists of traffic flow data. Also, unlike general data, a lot of data per unit time is generated and has various formats. In particular, since about 7.4 million cases/hour or more of large-scale real-time data collected as detailed traffic flow information are collected, stored and processed, a system that can efficiently process data is required. Therefore, in this study, an open source-based data parallel processing performance optimization study is conducted for the visualization of big data in the air environment of road transport pollution.

A Study on the Determination of Shock Loss Coefficient on the Branch in the Double-deck Road Tunnel for Small Car (소형차 전용 복층터널 분기부에서의 충격손실 계수 결정 연구)

  • Rho, Jang-hoon;Lee, Seung-jun;Kim, Jin
    • Tunnel and Underground Space
    • /
    • v.27 no.1
    • /
    • pp.50-57
    • /
    • 2017
  • In this study, the experiment for determining shock loss at the branch is conducted for the design of network double-deck road tunnel ventilation. The shock loss coefficient that determines the quantity of shock loss has been considered only regarding the constant aspect ratio of circular or rectangular section. However the suggestion of shock loss coefficient is needed since the aspect ratio of double-deck road tunnel for small vehicle is considered around 1:3 with the low height in Korea. The experiment model was made with the scale of around 1:23 applying Reynolds similarity law, so that the shock loss coefficient on the branch of the large aspect ratio was measured. The result of the study showed that shock loss coefficients of both split branch and straight branch were measured two to three times higher than those calculated from the theoretical equation or design values of previous studies. Therefore the study resulted the effect of large aspect ratio on shock loss coefficient was huge, and it is expected that precise design value can be suggested for the design of network double-deck tunnel ventilation.

A Traffic Flow Micro-simulation System Using Cellular Automata (CA모형을 이용한 미시적 교통류 시뮬레이션 시스템 개발에 관한 연구)

  • 조중래;고승영;김진구;김채만
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.3
    • /
    • pp.133-144
    • /
    • 2001
  • The purpose of this study is to develop micro simulation model for large-scale network with driver's behavior model. This study is performed for uninterrupted flow road section. And this model is developed to simulate traffic flow of the real network with unique geometric structure. The vehicle transmission and drivers' behavior model based on the exiting Cellular Automata approach.

  • PDF

TORANOMON HILLS - Super High-Rise Building on Urban Highway -

  • Hitomi, Yasuyoshi;Takahashi, Hiroshi;Karasaki, Hidenori
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.167-171
    • /
    • 2014
  • TORANOMON HILLS is the main building of a large-scale re-development project located in the center of Tokyo. This high-rise building has a height of 247 m and 52 floors above ground, 5 floors below ground, and $62m{\times}80m$ in plan. It is used as hotel, residential facilities, offices, shops and conference facilities. The super structure is mainly a rigid steel frame with response-control devices, using concrete-filled steel tube columns. The underground section is a mixed structure composed of steel, steel-reinforced concrete and reinforced concrete framings. The piled-raft foundation type is used. The remarkable feature of this high-rise building is that the motorway runs through the basements of the building, which makes it stand just above the motorway. This condition is an important factor of the building design. The plan shape is designed to fit along the curve of the motorway. Special columns at the corners are required to avoid placing columns in the motorway. This special column is a single inclined column in the lower floors that branches into two columns in the mid-floors to suit the column location in the upper floors. The cast steel joint is used for the branching point of each special column to securely transfer the stress.

A Study for Developing of Rail Bridge Inspection Robot (철도교량 자동화 로봇 개발을 위한 기초 연구)

  • Koo, Ja-Kyung;Hwang, In-Ho;Lee, Jong-Seh;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF