A case study of slope failure for large cut-slope (대절토사면내 붕괴발생에 따른 안정성검토 사례연구)

  • Lee, Yeon-Hee;Shin, Chang-Gun;Kim, Yong-Soo;Han, Jae-Hee;Choi, Jun-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.697-702
    • /
    • 2006
  • A counterplan of slope failure has to investigate about various and engineering safety factors. Especially, it is important that large cut-slope must examine rational and economic solution. In this case study, cut-slope failure caused by inflow of rainwater into alternate layers. Hereafter it is suggested that large cut-slope should consider analysis the cause for a decline of safety factor and the engineering character of corestone ground mass.

  • PDF

Reinforcement Effect of Stabilizing Piles in Large-scale Cut Slops (대절토사면에 보강된 억지말뚝의 활동억지효과에 관한 연구)

  • 홍원표;한중근;송영석;신도순
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.65-81
    • /
    • 2003
  • During the last few decades in Korea, the development of hillside or mountain areas has rapidly increased for infrastructure construction such as railroads, highways and housing. Many landslides have occurred during these constructions. Also, the amount and scale of damage caused by landslides have increased every year. In the case of Far East Asia including Korea, the damage of landslides is consequently reported during the wet season. In this paper, the effect of stabilizing piles on slope stability is checked and the behavior of slope soil and piles are observed throughout the year by field measurements in the large-scale cut slopes. In particular a large-scale cut slope situated on the construction site for the express highway in Donghae, Korea. First of all, The behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil gradually increased and rapidly decreased at depth of sliding surface indicating that the depth of sliding surface below the ground surface can be predicted. On the basis of being able to predict the depth of the sliding surface, stabilizing piles were designed and constructed in this slope. To ensure the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. The maximum deflection of piles is measured at the pile head and it is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.

  • PDF

A Case Study on Slope Failure by Excessive Under Cut (절토사면 하부의 과도한 굴착에 따른 붕괴 사례 연구)

  • Rhee, Jong-Hyun;Kim, Seung-Hyun;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1154-1160
    • /
    • 2009
  • Cut slope failure is happened in various form by several causes. In this study, we searched causes of cut slope failure shortly, and we made a study of slope failure by excessive under cut. Under cutting slope does to add unstability. Thereby, cut slope failure can be happened on a large scale.

  • PDF

The study of Cut-slop failure characteristics caused by typhoon' MAEMI' (태풍 매미에 의한 절토사면의 대규모 붕괴 특성 연구)

  • Jung, Young-Kook;Chang, Buhm-Soo;Shin, Chang-Gun;Lee, Yeon-Hee;Park, Sun-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.643-650
    • /
    • 2004
  • In general, slope failures are occurred by the interaction among various factors(slope shape, hydraulic condition, and geologic condition, etc.). In the area where has a heavy rainfall, a great portion of slope failures are caused by seepage increasement with suitable failure condition. Many studies have been performed to find the cause of large-scale failures. In this study, three Cut-Slope failures caused by typhoon 'MAEMI' were investigated to find out factors causing large-scale slope failures. It was confirmed in this research that major reason of slope failures was the weak layer working along with other unstable factor. The large-scaled investigation concerning Cut-Slope will be needed to find out the Weak Layer.

  • PDF

A Study on Slope Stability of Corestone (핵석지반의 사면안정성 연구)

  • 이수곤;금동헌
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.551-558
    • /
    • 2000
  • When cut slope is excavated, corestone in cut slope exists 20∼30%. In case of soil and soft rock mixing, people lay out gradient of 1 : 0.5, because of soft rock slope. In a case, slope that exists corestone between soil happens to large landslide. So, As a study performs geological survey, Analysis of slope stability reinforcement measures, etc, A study presents example meaures and analysis on slope stability of corestone.

  • PDF

A Consideration about Stability Investigation method of Failure Cut-Slope Covered by Vegetation (식생공이 시공된 붕괴절토사면의 안정성 검토기법에 관한 고찰)

  • Yoo, Ki-Jeong;Koo, Ho-Bon;Rhee, Jong-Hyun;Kim, Seung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.725-730
    • /
    • 2005
  • In case of the national roads which is opened in the past, there are carried out the expansion and improvement for enlargement of the traffic demand by industrial development and safety road operation to narrow of road width and serious change of the road alignment with effect of topography and graphical features of a mountain. A protection method using vegetation in the cut-slope has been constructed for harmony of ambient environment after cutting the slope recently. But it requires a study because the surface lose and the failure have been occurred in the large cut-slope which is covered by vegetation. In this study it was presented a countermeasure and examined a stability of contained uncertainty in the cut-slope according to the failure example of the cut-slope which is covered by vegetation. The additional research will be necessary against the development of the investigation technique which executes the stability investigation of the cut-slope which is covered by vegetation.

  • PDF

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.

The Behavior of Stabilizing Piles installed in a Large-Scale Cut Slope (대규모 절개사면에 설치된 억지말뚝의 거동)

  • Song, Young-Suk;Hong, Won-Pyo
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.191-203
    • /
    • 2009
  • The effect of stabilizing piles on cut slopes is checked and the behavior of slope soil and piles are observed throughout the year by field measurements on the large-scale cut slopes. First of all, the behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil are gradually increased and rapidly decreased at depth of sliding surface. As the result of measuring deformation, the depth of sliding surface below the ground surface can be known. Based on the measuring the depth of the sliding surface, some earth retention system including stabilizing piles were designed and constructed in this slope. To check the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. As the result of instrumentation, the maximum deflection of piles is measured at the pile head. It is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. The deflection of piles is increased during cutting slope in front of piles for the construction of soil nailing. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.

Stability Analysis and Reinforcement of Large Excavated Slope considering Precipitation Infiltration in Rainy Season (강우침투로 인한 대절취사면의 붕괴안정성검토 및 대책)

  • Chun, Byung-Sik;Choi, Hyun-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.1
    • /
    • pp.101-110
    • /
    • 2000
  • In case heavy rainfall is a key factor of slope failure, the failure zone is usually developed within the depth of 3~5m from the ground surface regardless of the location of the watertable. If rainfall is taken into consideration, it is general that the slope stability analysis is carried out under the assumption that the cut slope is saturated to the slope surface or the watertable elevates to a certain height so that ${\gamma}_{sat}$, the unit weight of saturated soil, is used. However, the analysis method mentioned above can't exactly simulate the variation of pore water pressure in the slope and yields different failure shape. The applicability of slope stability analysis method considering the distribution of pore water pressure within the slope with heavy rainfalls, was checked out after the stability analysis of a lage-scale cut slope in a highway construction site, where surface failure occurred with heavy rainfalls. An appropriate slope stabilization method is proposed on the base of the outcome of the analysis.

  • PDF

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.