• Title/Summary/Keyword: Large(Mother) vessel

Search Result 2, Processing Time 0.016 seconds

Analysis of Operational Requirements for Mother Ship with a Mounted Unmanned Surface Vehicle(USV) Using the Development Process of the Operational Concept (운용개념 개발 프로세스를 활용한 무인수상정(USV) 탑재 모함의 운용 요구사항 분석)

  • Hur, Jang Wan;Hong, Soon Kook;Lim, Kyung Han;Ryu, Jae Kwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.1
    • /
    • pp.25-35
    • /
    • 2020
  • The South Korean Navy is making efforts to acquire vessels that the new technology of the 4th industry is applied, and as a part of these efforts, it has a plan to mount and operate an Unmanned Surface Vehicle(USV) on a vessel that will be introduced later. However, the recent studies have focused on only development of common platforms and mission equipment for the USV, and have not sufficiently analyzed studies and operatinoal requirements on mother ship that will operate the mounted USV. Hence, this study analyzed and presented requirements of mother ship with the mounted USV in order to operate effectively it when the future medium and large vessels to be acquired by the South Korean Navy intent to operate the USV.

An Empirical Study on Berth-Length Calculation of Container Terminal (컨테이너 터미널 선석길이 산정에 관한 실증 연구)

  • Song, Yong-Seok;Nam, Ki-Chan;Yeon, Jeong-Hum;Kim, Jeong-Eun
    • Journal of Navigation and Port Research
    • /
    • v.27 no.2
    • /
    • pp.179-184
    • /
    • 2003
  • In order to mitigate the overcapacity of Busan port, Busan new port has been developed as transshipment port which is capable of handling 8,000 TEU containership. Generally, design of transshipment port has to reflect the capacity of feeder because both mother vessels and feeders enter the planned port at the same time. However, the existing plan of Busan new port capacity needs to be reexamined since the adopted capacity of each berth at new port, 300,000 TEU, does not seem to be enough to handle both mother vessels and feeders. Therefore, in this study we calculated the required number of berth and berth length by considering cargo handling capacity in terms of the ship size and this study makes some implications in relation with the terminal development plan.