• Title/Summary/Keyword: Landscape unit

Search Result 270, Processing Time 0.024 seconds

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification (조경공사 표준품셈 공종 개정에 관한 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.119-126
    • /
    • 2011
  • The standard unit manpower and material in landscape architectural construction was consist of a standard and universal work classification. However, these constructional methods have created a number of problems in utilizing and responding on a variety of recently-developed working methods such as new constructional skills and technologies. This research decided that presenting the amendments of work classification of a standard unit manpower and material in landscape architectural construction was very important, and investigated those work classifications which required these new amendments. First of all, assessment items were selected through the literature reviews and a preliminary survey. Then, these assessment items were surveyed to the total of 60 professional landscape architecture field. The results of this study were as follows; First, the utilization level of the a standard unit manpower and material in landscape architectural construction was highest in the area of work classification of planting unit manpower and material. Second, the work classifications that needed to be added were recognized as leveling the ground construction, landscape structure construction, paving construction, water facilities construction, and outdoor facilities construction. Third, in the field of the a standard unit manpower and material in landscape architectural construction, 66.7% of the respondents replied that some amendments were necessary, and those amendments needed work classifications were identified as work classification of planting unit manpower and material was gigantic plant, topiary tree, temporary planting, exchange dead tree, etc. In the area of digging out was gigantic plant and plastic tree were recognized. The survey respondents also answered that, in keeping and management work classifications some amendments in pruning waste were necessary, and in the fields of rubble masonry work classifications some improvements were required in rubble aperture planting unit manpower and material and sodding and herbaceous sowing was a realistic lawn size unit manpower and material was needed. Based on the results explained above, this study suggests that amendments for a standard unit manpower and material in landscape architectural construction are necessary, especially in the areas of planting size and quality of work classifications unit manpower and material and in the unit manpower and material that affects the quality of lands caping constructions.

Characteristics of Periodical Changes on Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Korea (우리나라 조경공사 표준품셈의 시대적 변천 특성)

  • Lee, Kwan-Hee;Yun, Ju-Cheul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.131-138
    • /
    • 2009
  • This research was carried out to keep a sharp look-out on changes of estimated unit power and material in landscape architectural construction in Korea from 1962 to 2007 and to suggest basic information for its desirable direction in the near future. The research results are as follows. At first, work classification of estimated unit power and material landscape architectural construction was included under the earth work and in 1974 it had the name which was called landscape architectural process with earth works, and in 1984 the estimated unit power and material of landscape architectural construction was separated from the earth work but it was still under name of estimated unit manpower and material of the engineering construction. In 1972 the estimated unit power and material began with a 'planting' and a 'pruning' and still consists of 7 work classification total: 'sodding and herbaceous sowing', 'digging out', 'planting', 'digging round the root', 'keeping and management', 'rubble masonry' and 'planting for protection of rocks split section'. The processes consist of 29 sub-processes in total. The lawn construction was mainly established in the 1960s, the planting construction in the 1970s, the keeping and management in the 1980s, split section protection in the 1990s along with new technology with keeping management in the 2000s. On the basis of these research results, the process to be added in the near future could be related to new material and new technology and the process might be much more subdivided.

A Study on the Amelioration of the Standard of estimated Unit Manpower & Material' in the Landscape Planting Work (造景植栽工事 標準품셈의 改善方案에 關한 硏究)

  • Sohn, Chang-Ku;Kim, Kwi-Gon;Yoon, Keun-Young;Kang, Tae-Ho;Kim, Ik-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.18 no.3 s.39
    • /
    • pp.23-37
    • /
    • 1990
  • The purpose of this study was to suggest, an ameliorated, 'standard of estimated unit manpower & material' in the Landscape Planting Work. To achieve this goal of this study, following process was performed to reach more advanced results. First, relevant domestic & foreign references were gathered & analyzed with a viewpoint of the system & contents within, Second, most similar foreign country‘s relevant 10 forms & actual site were surveyed, Third, actual site data were collected from the 17 selected landscape Planting sites Fourth, the collected data from reference study & actual site survey were analyzed and calculated. And Finally, analyzed data were reorganized & rearranged in good order with 3 principles to produce more ameliorated 'Standard of estimated unit manpower & material' in the landscape Planting Work. The suggested main results of this study include, 1. Reorganization of current system to transplanting(includes excavation & root ball wrapping), planting(includes tree & shrub), turfing & maintenance 2. Deletion of the Range of 'account of labor' & simultaneous distribution of 'account of labor' with a proposed regular ratio 3. Adjustment of the range of the plant's size 4. Amelioration of the level of 'Account of labor' 5. New establishment in maintenance items as Watering, Fertilizing & spraying chemicals on turf area. 6. Readjustment & new establishment of the backfill volume. 7. Actualization, readjustment & new establishment of the transportation amount.

  • PDF

A Study on the Planning of Exterior Spaces of Housing Complexes Where Landscape View Corridors Were Planned (통경구간이 지정된 공동주택단지의 외부공간계획에 관한 연구 - 남악신도시 공동주택단지를 중심으로 -)

  • Kim, Jeong-Gyu;Lee, Jang-Hyuk
    • Journal of the Korean housing association
    • /
    • v.21 no.2
    • /
    • pp.11-18
    • /
    • 2010
  • The purpose of this study is to analyze the exterior space designs of housing complexes where landscape view corridors were planned. In addition, the purpose of the study is to propose reference data for planning and designing a new landscape view corridor. The process of this study is as follows: (1) To understand the role of the landscape view corridor, this study investigated cases of district unit plans and classified the landscape view corridors in terms of the types of functions. (2) To extract analysis items on the exterior space design of housing complexes where landscape view corridors were planned, this study investigated guidelines to be set up for the design of landscape view corridors and the present state of the condition of landscape view corridors. (3) This study analyzed the relationship between the landscape view corridor and the courtyard, the roadway and convenience facilities of the housing complex. This study also proposed reference data for planning a new landscape view corridor and designing the exterior space of a new housing complex.

An Analysis of Recognition and Preference for the View in an Apartment Unit (아파트 단위세대에서 보이는 경관에 대한 인지 및 선호 특성)

  • Moon, Ji-Won;Ha, Jae-Myung
    • Journal of the Korean housing association
    • /
    • v.18 no.1
    • /
    • pp.83-93
    • /
    • 2007
  • Following the previous ones, this study is intended to explore methods of qualitative assessment on the view from apartment units. It first complemented and analyzed the attributes of landscape elements and then set up questionnaire items based on these attributes to identify the tendencies in apartment inhabitants' recognition of landscape elements, and then conducted a preference assessment on the test cases sampled on the basis of picture and other data collected in the previous studies to identify the characteristics of the preference for the view from apartment units according to landscape elements. Consequently, the following results have been derived. First, the landscape elements seen from apartment units may be classified into a total of sixteen categories, and the overall ratio of natural elements to artificial ones is shown to be approximately one to three. Second, it is also shown that apartment dwellers tend to prefer natural landscape elements over artificial ones, and the preferences for the distance to and location of landscape elements exhibit certain variance depending on the type of the elements. Third, the analysis of the preference for landscape elements has revealed that the types of landscape elements, the make-up and diversity of landscape elements, and the perceived distance to landscape elements as well as the resultant feeling of openness all affect the preference tendencies.

Defects of Planting in Landscape Plants in Apartment Complex (아파트단지 조경수목의 식재하자에 관한 연구)

  • 임원현;김용수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.2
    • /
    • pp.61-67
    • /
    • 2001
  • The purpose of this thesis was to provide the basic data for landscape architecture of apartment constructions and to minimize the users´ and builder´ loss in terms of finance and landscape due to defects in planting. After a review of literature related to defects of planting work, the researcher investigated the defects in planting of landscape plants on the basis of data from the drawing and defect-repair construction of 50 civil apartment complexes in Daegu and Kyongbook are from 1994 to 1998. The defect-ratio was analysed in terms of the species, shapes, and sizes of trees. It provides matters for consideration in terms of the design of the landscape planting on the apartment unit. It also provided the future directions for landscape architecture in apartment constructions with regard to the selection of the planting trees, etc., given statistics on defect occurrence. The causes of defect of the landscape planting trees were not studied accurately in this study due to the board range of researched area, the differences of the planting ground environment, the management ability, and the parameters of judging planting defects. It is recommended that those areas should be researched in the future.

  • PDF

Improvement Strategy by Case Study on the Direct Payment Program for Rural Landscape Preservation: Bonghwa-gun, Chungwon-gun, Hongsung-gun (경관보전직불제 시범사업의 시행사례 분석 및 개선방안: 봉화군, 청원군, 홍성군 사례를 중심으로)

  • Jang, Hyo-Sun;Gim, Uhn-Soon;Um, Dae-Ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2007
  • The purpose of this study is to analyze the problems of operating the Direct Payment Program for Rural Landscape Preservation and to derive the way of improvement based on case study for three areas in Bonghwa-gun, Cheongwon-gun, Hongseong-gun. The most important factor for the program is farmer's consciousness and positive participation of the farmer who are the subject of this project. Even if farmers are not satisfied with the amount of direct payment income, they try to create income by utilizing landscape preservation crops. Particularly current unit payment dose not surpass the for the crops farm operating costs and payment time is not appropriate for the farming cycle. Hence, it needs to be considered increasing unit payment and rearranging the payment time. Also, we need to introduce incentive system based the degree of fulfillment of the Direct Payment Program in each areas. In general the Direct Payment Program for Rural Landscape Preservation has potentiality to contribute farmer's income stability and the vitalization of region with three revisions.

Calculation of Pollutant Loadings from Stream Watershed Using Digital Elevation Model and Pollutant Load Unit Factors (발생부하원단위와 수치표고모형을 이용한 하천유역 오염부하량 산정)

  • Yang, Hong-Mo;Kim, Hyuk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.1
    • /
    • pp.22-31
    • /
    • 2001
  • The purpose of this study is to compare calculated pollutant loadings using pollutant load unit factors and vector type coverage, and expected mean concentration(EMC) and raster type of digital elevation model(DEM). This study is also focusing on comparison of the advantages and the disadvantages of the two methods, and seeking for a method of calculation of pollutant loadings using DEM. Estimation of pollutant inputs using pollutant load unit factors has limitations in identifying seasonal variations of pollutant loadings. Seasonal changes of runoffs should be considered in the calculation of pollutant loadings from catchments into reservoirs. Evaluation of pollutant inputs using runoff-coefficient and EMC can overcome these drawbacks. Proper EMC and runoff-coefficient values for the Koeup stream catchments of the Koheung estuarine lake were drawn from review of related papers. Arc/Info was employed to establish database of spatial and attribute data of point and non-point pollutant sources and characteristics of the catchments. ArcView was used to calculate point and non-point pollutant loadings. Pollutant loads estimated with either unit factors-coverages, i.e., pollutant load unit factors and vector coverages f point sources and land use, or EMC and digital elevation mode(DEM) were compared with stream monitoring loads. We have found that some differences were shown between monitoring results and estimated loads by Unit Factors-Coverage and EMC-DEM. Monthly variations of pollutant loads evaluated with EMC-DEM were similar to those with monitoring result. The method using EMC-DEM can calculate accumulated flows and pollutant loads and can be utilized to identify stream networks. A future research on correcting the difference between vector type stream using flow direction grid and digitalizing vector type should be conducted in order to obtain more exact calculation of pollutant loadings.

  • PDF

Principles of Eco-Village Planning Applying Landscape Ecological Indices (경관생태지표를 활용한 생태마을계획 원리)

  • Whang Bo-Chul;Lee Myung-Woo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.4 s.111
    • /
    • pp.71-78
    • /
    • 2005
  • The purpose of this study is the practical application of landscape ecological indices to establishment of eco-village planning methodology. Planning an eco-village has to be carried out in the boundary of a small watershed that is defined by homogeneous ecological character. Because the small watershed is a landscape unit it can have unique ecological character. On this viewpoint, the spatial structure is analyzed by the ecological attributes of form, distribution arrangement and composition of the sub-landscape units. Among all of the sub-landscape units, a green tract of land is the main subject of the analyzing entity. Woodland or forest as a green tract of land is a source of biological species and materials. Therefore the ecological attributes of green patches are especially analyzed by landscape ecological indices. The selected landscape ecological indices are elongation, lobes, interior area ratio, convolution of perimeter and proximity of the green patches. These indices represent the state of ecological conditions and they will be the evaluation factors of the landscape ecological planning. These frameworks for landscape ecological planning apply to Obok and Ganggeum villages in Wanju-gun, Korea. A proposed planning was evaluated by the selected landscape ecological indices. Among the selected landscape ecological indices of green patches, perimeter convolution and proximity were increased. It means that the ecological condition of peen paches will be mon sound and green areas of the village will be expanded naturally. In addition to this connectivities among green patches will also be improved.