• Title/Summary/Keyword: Lake model

Search Result 322, Processing Time 0.028 seconds

Development and Application of Freshwater Lake Water Quality Management System(ELAQUM) through the Linkage of Watershed and Freshwater Lake (유역과 담수호를 연계한 담수호 수질관리 시스템 개발 및 적용)

  • 김선주;김성준;김필식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.6
    • /
    • pp.124-136
    • /
    • 2002
  • A freshwater lake water quality management system(FLAQUM) was developed to help regional manager for the water quality of a rural basin. The integrated user interface system FLAQUM written in Visual Basic, includes three subsystems such as a database management system, basin pollutant loads simulation model using SWMM model and freshwater lake water quality simulation model using WASP5 model. Pollutant load simulation model was applied to simulate the discharge and pollutant loading from the watershed, and freshwater lake water quality model was applied to analyze the changes in water quality with respect to watershed pollutant loads, and this model could be used in planning to control watershed pollutant source for water quality management. Database management system was constructed fur all input and output data processing, and it can be used to analyze statistical characteristics using constructed data. Results are displayed both graph and text for convenience of user. The results of FLAQUM application to Boryeong freshwater lake showed that the lake was in eutrophic condition. The major contribution of pollution comes from tributary No.1 and No.4, which have a large number of livestock farms. Therefore, water quality management must be focused on appropriate management of the livestock farming in the two breanchs.

Estimation of Water Quality of Geumgang Lake by Diversion of Geumgang Lake Flow into Saemangeum Lake (금강호물의 새만금호 도입에 따른 금강호 수질변화 분석)

  • Eom, Myung-Chul;Lee, Jae-Myun
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1045-1051
    • /
    • 2006
  • Geumgang canal is planned to connect Geumgang lake with Saemangeum lake to accelerate desalinization and dilute polluted water to improve water quality in Saemangeum lake. The purpose of this study is to evaluate the impact of water quality on Geumgang lake by diversion of its lake flow to Saemangeum lake. WASP5 model was used to estimate water quality of Geumgang lake. Model calibration and verification were done for water quality data for 2001 and 2002. Water quality concentrations in Geumgang lake were simulated for 4 scenarios, which were considered whether the Geumgang canal is built or not. As a result of simulations, there was little impact on water quality in Geumgang lake, though a little of the Geumgang lake flow diverted to Saemangeum lake. As the Geumgang canal is planned to divert the Geumgang water flow which were discharged into the sea through sluice gates when canal is not built, it is thought that there will be little change by diversion of water flow.

Water quality management of Doam lake around the pasture area (목장지대 주변에 위치한 도암호의 수질관리)

  • Cho, Jae-Heon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.3
    • /
    • pp.41-47
    • /
    • 1998
  • Doam Lake is located around the pasture area and Yongpyung Resort. Because of the waste load of domestic animals, nutrient concentration of the stream is high. In this study, waste load of Doam Lake watershed is calculated, and QUAL2E model is applied to the upper part of the Songcheon to calculate the input boundary concentration of Doam Lake. And WASP5 model is applied for the water quality modeling of Doam lake. The results indicate that advanced treatment of domestic animal wastes is necessary for the lake water quality management.

  • PDF

Three-dimensional Numerical Modeling of Water Temperature and Internal Waves in a Large Stratified Lake (대형 성층 호수의 수온과 내부파의 3차원 수치 모델링)

  • Chung, Se-Woong;Schladow, S. Geoffrey
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.4
    • /
    • pp.367-376
    • /
    • 2015
  • The momentum and kinetic turbulent energy carried by the wind to a stratified lake lead to basin-scale motions, which provide a major driving force for vertical and horizontal mixing. A three-dimensional (3D) hydrodynamic model was applied to Lake Tahoe, located between California and Nevada, USA, to simulate the dominant basin-scale internal waves in the deep lake. The results demonstrated that the model well represents the temporal and vertical variations of water temperature that allows the internal waves to be energized correctly at the basin scale. Both the model and thermistor chain (TC) data identified the presence of Kelvin modes and Poincare mode internal waves. The lake was weakly stratified during the study period, and produced large amplitude (up to 60 m) of internal oscillations after several wind events and partial upwelling near the southwestern lake. The partial upwelling and followed coastal jets could be an important feature of basin-scale internal waves because they can cause re-suspension and horizontal transport of fine particles from nearshore to offshore. The internal wave dynamics can be also associated with the distributions of water quality variables such as dissolved oxygen and nutrients in the lake. Thus, the basin-scale internal waves and horizontal circulation processes need to be accurately modeled for the correct simulation of the dissolved and particulate contaminants, and biogeochemical processes in the lake.

A Study on Phosphorus Loading model for Eutrophication Response in the Yongsan Lake (영산호의 부영양화 평가를 위한 인부하모델의 검토)

  • 류일광;이치영
    • Journal of Environmental Health Sciences
    • /
    • v.26 no.4
    • /
    • pp.97-104
    • /
    • 2000
  • The purpose of this is made an examination of phosphorus loading model for eutrophication response in the Yongsan lake. For the model, we measured the total amount of nutrients derived from the Yongsan river watershed, inflow rate to the Yongsan lake, water quality, and water budget from January to December in 1999. The total amount of precipitation in the Yongsan river watershed was 4,951.7$\times$10$^{6}$ ㎥/y and inflow amount was 2,569.7$\times$10$^{6}$ ㎥/y, therefore the outflow rate of the Yongsan river watershed was 51.9%. The develop loading of total nitrogen was 86,928.1kg/d and that of total phosphorus was 22,007.6kg/d at the Yongsan river watershed, But, as the inflow loading of total nitrogen was 33,962kg/d and the inflow loading of total phosphorus was 2,218kg/d to the Yongsan lake. so each infolw rate was 39.0% and 10.1%. The hydraulic residence time was 34days, total phosphorus loading [L(P)] on the surface area was 23.398g/㎥/y, the hydraulic load( $Q_{s}$) of inflow water was 74.269m/y, the reserve rate of phosphorus in the lake was 0.359, and the settinh velocity of phosphorus was 0.114m/d at the Yongsan lake. Mathematical model of phosphorus loading to estimate the responses of eutrophication at the Yongsan lake is [ $P_{j}$] = 0.838 [L(P)/Q.(1+√ $T_{w}$)$^{-1}$ ] . ] . .

  • PDF

Behavior of Water Quality in Freshwater Lake of Tide Reclaimed Area Using SWMM and WASP5 Models (SWMM과 WASP5모형을 이용한 간척지 담수호의 수질거동 특성 조사)

  • 김선주;김성준;이석호;이준우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.2
    • /
    • pp.148-160
    • /
    • 2002
  • Lake water quality assessment information is useful to anyone involved in lake management, from lakeshore owners to lake associations. 11 provides lake water quality, which can improve how to manage lake resources and how to measure current conditions. It also provides a knowledge base that can be used to protect and restore lakes. SWMM was applied to simulate the discharge and pollutant loads from Boryeong watershed, and WASP5 was applied to analyze the changes of water quality in Boryeong freshwater lake. In each model, the most suitable parameters were calculated through sensitive analysis and some parameters used default data. Simulated in SWMM and measured discharge showed the accuracy of 88.6%. T-N and T-P exceeds the criteria in the simulation of water quality in Boryeong freshwater lake, and control of pollutant loads in the main stream showed the most effective way. Integrated water quality management system was developed to give convenience in the operation of SWMM and WASP5 and data acquisition.

Water Quality Behavior by the Sluice Gate Operation of Freshwater Lake (배수갑문 방류시점 및 방류량에 따른 담수호의 수질변화)

  • 김선주;김성준;김필식;이창형
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.1
    • /
    • pp.91-101
    • /
    • 2003
  • Boryeong Seadike located at southwestern seashore of Korean peninsula completed in 1997. Sluice gate operation can be an important factor to maintain lake water quality and reduce retaining time of pollutants within lake. The lake water quality simulation model, WASPS was adopted and tested to find out proper gate operation timing and discharge amount. From the simulation of sluice gate operation, the results showed that the later the time of discharge for loosing 1 day successively to 6 days, the better the quality of water. Discharge amount showed relatively minor changes of water quality. This means that pollutants flowed into lake from watershed do not have enough time to mix up with deep water when the gate opened at early time. About 3 days delay of discharge caused the dilution effect to stabilize the lake water quality in case of Boryeong freshwater lake.

A change of local meteorological environment according to dam construction of Nakdong-River -II. Estimation using numerical model- (낙동강 수계 중의 댐 건설에 의한 주변의 국지기상환경 변화 -II. 수치모델을 이용한 추정-)

  • 전병일;이영미
    • Journal of Environmental Science International
    • /
    • v.11 no.4
    • /
    • pp.281-288
    • /
    • 2002
  • This study was carried out for reading the change of local meteorological environment according to dam construction of Nakdong-river using numerical model. The study used PSU/NCAR Mesoscale Model version5(MM5) for inquiring effect of formation of artificial lake after dam construction. The colleague simulated temperature mixing ratio, latent heat flux and sensible heat flux in two cause of existing lake and not. Temperature and mixing ratio in southwest of Andong lake increased because of the air that was warm and moist above the lake moved to southwest due to the northeasterly wind. In the case of existing lake around Andong, latent heat flux increased much in the daytime after sunrise. However, sensible heat flux decreased but it didn't change distinctly in southwest of Andong like the other values.

Application of EFDC and WASP7 in Series for Water Quality Modeling of the Yongdam Lake, Korea

  • Seo, Dong-Il;Kim, Min-Ae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.6
    • /
    • pp.439-447
    • /
    • 2011
  • This study aims to test the feasibility of combined use of EFDC (Environmental Fluid Dynamics Code) hydrodynamic model and WASP7.3 (Water Quality Analysis Program) model to improve accuracy of water quality predictions of the Yongdam Lake, Korea. The orthogonal curvilinear grid system was used for EFDC model to represent riverine shape of the study area. Relationship between volume, surface and elevation results were checked to verify if the grid system represents morphology of the lake properly. Monthly average boundary water quality conditions were estimated using the monthly monitored water quality data from Korean Ministry of Environment DB system. Monthly tributary flow rates were back-routed using dam discharge data and allocated in proportion to each basin area as direct measurements were not available. The optimum number of grid system was determined to be 372 horizontal cells and 10 vertical layers of the site for 1 year simulation of hydrodynamics and water quality out of iterative trials. Monthly observed BOD, TN, TP and Chl-a concentrations inside the lake were used for calibration of WASP7.3 model. This study shows that EFDC and WASP can be used in series successfully to improve accuracy in water quality modeling. However, it was observed that the amount of data to develop inflow water quality and flow rate boundary conditions and water quality data inside lake for calibration were not enough for accurate modeling. It is suggested that object-oriented data collection systems would be necessary to ensure accuracy of EFDC-WASP model application and thus for efficient lake water quality management strategy development.

Numerical Simulation of Local Circulation Over the Daechung Lake Area by Using the Mesoscale Model (중규모 수치 모델을 이용한 대청 호수 주변의 국지 순환 모의)

  • Byon, Jae-Young;Choi, Young-Jean;Seo, Beom-Keun
    • Journal of the Korean earth science society
    • /
    • v.30 no.4
    • /
    • pp.464-477
    • /
    • 2009
  • In this study, we examined the patterns of local circulation over the Daechung lake area through the numerical experiment designed to investigate the impact of lake on the local circulation. The results of numerical experiment showed that the surface temperature predicted by WRF model was lower than the observation, while the wind speed was stronger than the observation. The local circulation over the lake area was characterized by a lake breeze induced by a horizontal thermal contrast between the lake surface and the Surrounding land. At Daecheong Lake, a lake breeze formed at 09 LST and dissipated at 18 LST, with maximum intensity at 15 LST. The vertical extent of the simulated circulation was about 1,200 m. The specific humidity increased as the humid air above the lake moved landward due to the daytime circulation of the lake breeze. The numerical experiments of sensitivity to existence of the lake showed that the simulated surface temperature decreased in the experiment with the lake. Wind speed was more intense around the lake area when the actual land use was substituted by grassland land use. The results of numerical experiments suggest that the lake-induced lake breeze circulation has an effect on the meteorology of planetary boundary layer around the lake.