Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

반복공정 최적 공법대안 선정 방법 (Optimizing Construction Alternatives for Repetitive Scheduling)

  • 박상민;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론 (Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB)

  • 민규태;이홍철;리현군;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

물류창고 불출자 로드밸런스율 증대 휴리스틱 알고리즘 개발 (A Study on the Heuristic Algorithm Development for Load Balance Ratio Increase of Workers in Warehouse)

  • 전욱;장정환;장청윤;조용철;이창호
    • 대한안전경영과학회지
    • /
    • 제19권1호
    • /
    • pp.203-210
    • /
    • 2017
  • Companies are pursuing the management of small quantity batch production or JIT(Just-in-time) system for improving the delivery response and LOB(Line Balancing) in order to satisfy consumers' increasing demands in the current global economic recession. And in order to improve the growth of production for reducing manufacturing cost, improvements of the Load Balancing have become an important reformation factor. Thus this paper is aimed at warehouse which procures materials on the assembly line in procurement logistics of automotive logistics and proceed with research on heuristic algorithm development which can increase the Load Balancing of workers. As a result of this study, when applied the primary target value, it was verified that the whole workers decreased from 28 to 24. Furthermore, when specified the secondary target value and applied algorithm once more, it was verified that the Load Balance Ratio was improved from 44.96% to 91.7%.

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

선형 공정계획 모델의 작업 관계성 적용 방법 (A Method of Applying Work Relationships for a Linear Scheduling Model)

  • 류한국
    • 한국건축시공학회지
    • /
    • 제10권4호
    • /
    • pp.31-39
    • /
    • 2010
  • 선형 공정계획 방법은 1929년 엠파이어 스테이트 빌딩에서 그래픽한 용도로 사용되면서 현재는 다양한 작업 공간, 현장 작업과 조립 작업에 적용되고 있다. 선형 공정계획 상에 동시적인 크리티칼 패스가 발생하면 자원 관리는 작업흐름의 최적화 문제로 연결되어 유연한 작업생산성과 지속적인 자원의 할당을 하기 위해 적용되고 있다. 그러나 선형 공정계획 모델 연구에서 간과하고 있는 선형 공정계획 모델의 작업 관계성을 고려하는 것이 필요하다. 이에 본 연구는 선형 공정계획 모델에 관한 기존 연구를 분석하여 네트워크 공정표의 관계성을 선형 공정표에 적용할 수 있는 방법을 제시한다. 네트워크 공정표를 선형공정표로 변환 시에 발생하는 작업의 관계성을 고찰하고 건축물의 물리적 층수 변화와 같이 작업공간의 변화에 따라 선형 공정표에 반영되어야 할 선형 공정표상의 액티비티의 이동 문제를 고찰하여 네트워크 공정표를 선형 공정표로 호환할 수 있는 시스템 개발을 위한 기초연구를 제공하는 것이 본 연구의 목적이다.