• 제목/요약/키워드: LNG supply system

검색결과 69건 처리시간 0.024초

가스추진선박의 가스연료공급시스템에 대한 CFD를 이용한 정량적 위험도 해석에 관한 연구 (A Study on the Quantitative Risk Analysis Using CFD for the Fuel Gas Supply System of Gas Fueled Ship)

  • 김기평;김대헌;이영호
    • 대한조선학회논문집
    • /
    • 제54권1호
    • /
    • pp.1-9
    • /
    • 2017
  • LNG has significant advantages in regard to environmental aspects comparing with conventional fuel oil. In fact, it is estimated that NOx and SOx emission can be reduced by about 90% and 100%, respectively in case of using LNG as a fuel. LNG-fuelled ship has been considered to be the best option both from an environmental and an economic point of view. Along with these trends, some major shipyards and Classification Societies have started to carry out the risk-based system design for LNG-fuelled ship such as passenger ship, platform supply vessel and large container vessel etc. However, new conceptual gas fuelled ship has high risk level compared with vessel using traditional crude oil especially in view of gas explosion accident. Therefore safety area where installed fuel gas supply system is required risk based system design with special considerations. On this paper, the entire process necessary for the quantitative risk analysis was explained to meet the satisfactory safety level of gas fuelled ship.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

Case study on operating characteristics of gas fueled ship under the conditions of load variation

  • Chun, Jung-Min;Kang, Ho-Keun;Kim, You-Taek;Jung, Mun-Hwa;Cho, Kwon-Hae
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제40권5호
    • /
    • pp.447-452
    • /
    • 2016
  • The use of gas as fuel, particularly liquefied natural gas (LNG), has increased in recent years owing to its lower sulfur and particulate emissions compared to fuel oil or marine diesel oil. LNG is a low temperature, volatile fuel with very low flash point. The major challenges of using LNG are related to fuel bunkering, storing, and handling during ship operation. The main components of an LNG fuel system are the bunkering equipment, fuel tanks, vaporizers/heaters, pressure build-up units (PBUs), and gas controlling units. Low-pressure dual-fuel (DF) engines are predominant in small LNG-powered vessels and have been operating in many small- and medium-sized ferries or LNG-fueled generators.(Tamura, K., 2010; Esoy, V., 2011[1][2]) Small ships sailing at coast or offshore rarely have continuous operation at constant engine load in contrast to large ships sailing in the ocean. This is because ship operators need to change the engine load frequently due to various obstacles and narrow channels. Therefore, controlling the overall system performance of a gas supply system during transient operations and decision of bunkering time under a very poor infrastructure condition is crucial. In this study, we analyzed the fuel consumption, the system stability, and the dynamic characteristics in supplying fuel gas for operating conditions with frequent engine load changes using a commercial analysis program. For the model ship, we selected the 'Econuri', Asia's first LNG-powered vessel, which is now in operation at Incheon Port of South Korea.

고압 LNG 펌프의 이상 진동 진단 (Abnormal Vibration Diagnosis of High Pressure LNG Pump)

  • 김학은;최병근
    • 동력기계공학회지
    • /
    • 제9권2호
    • /
    • pp.45-49
    • /
    • 2005
  • Liquefied natural gas takes up six hundredths of the volume of natural gas, which makes storage and transportation much easier. To send out natural gas via a pipeline network across the nation, high-pressure LNG pumps supply highly compressed LNG to high-pressure vaporization facilities. The Number of high-pressure LNG pumps determined the send-out amount in LNG receiving terminal. So it is main equipment at LNG production process and should be maintained on best conditions. In this paper, to find out the cause of high beat vibration at cryogenic pumps, vibration and motor current signal analysis have been performed. High vibration of cryogenic pumps could be reduced due to the modification of motor rotor.

  • PDF

LNG 냉열을 이용한 공기액화분리시스템의 시뮬레이션 및 공정 해석 (Process Analysis and Simulation for System of Air Liquefaction Separation Using LNG Cold Energy)

  • 한단비;백영순
    • 한국수소및신에너지학회논문집
    • /
    • 제30권3호
    • /
    • pp.276-281
    • /
    • 2019
  • The process of separating oxygen and nitrogen from the air is mainly performed by electric liquefaction, which consumes a lot of electricity, resulting in higher operating costs. On the other hand, when used for cold energy of LNG, electric power can be reduced compared to the electric Linde cycle. Currently, LNG cold energy is used in the cold refrigeration warehouse, separation of air-liquefaction, and LNG cold energy generation in Japan. In this study, the system using LNG cold energy and the Linde cycle process system were simulated by PRO/II simulators, respectively, to cool the elevated air temperature from the compressor to about $-183^{\circ}C$ in the air liquefaction separation process. The required amount of electricity was compared with the latent heat utilization fraction of LNG, the LNG supply pressure, and the LNG cold energy usage. At the air flow rate of $17,600m^3/h$, the power source unit of the Linde cycle system was $0.77kWh/m^3$, compared with $0.3kWh/m^3$.

극저온 잠액식 펌프 연구개발 프로세스에 관한 융합 연구 (A Convergence study on the Research and Development process for the cryogenic submerged pump)

  • 배태용;황규완
    • 한국융합학회논문지
    • /
    • 제8권10호
    • /
    • pp.185-191
    • /
    • 2017
  • 최근, LNG는 저렴한 가격과 친환경적 연료 등의 이유로 선박용 대체연료로 각광을 받고 있으며, 그 수요량도 급성장이 예상된다. 그러나, 선박의 LNG 연료공급을 위한 극저온펌프(Cryogenic Pump) 제작과 관련한 국내 기술력은 매우 미흡한 실정으로 핵심 부품의 설계와 제작 기술이 절실한 시점이다. 따라서, 본 연구는 선박용 LNG 공급 시스템용 극저온 잠액식 원심펌프(Cryogenic Submerged Centrifugal Pump)의 단계별 개발절차에 대하여 기술하였다. 그리하여, 각 단계별 특성 및 주요 개발항목을 공학적이고 관리적인 측면에서 접근함으로써 실질적이고 구체적인 개발방법을 제시하는데 연구 목적을 두었다.

Research of design challenges and new technologies for floating LNG

  • Lee, Dong-Hyun;Ha, Mun-Keun;Kim, Soo-Young;Shin, Sung-Chul
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제6권2호
    • /
    • pp.307-322
    • /
    • 2014
  • With the rate of worldwide LNG demand expected to grow faster than that of gas demand, most major oil companies are currently investing their resources to develop floating LNG-FLNG (i.e. LNG FSRU and LNG FPSO). The global Floating LNG (FLNG) market trend will be reviewed based on demand and supply chain relationships. Typical technical issues associated with FLNG design are categorized in terms of global performance evaluation. Although many proven technologies developed through LNG carrier and oil FPSO projects are available for FLNG design, we are still faced with several technical challenges to clear for successful FLNG projects. In this study, some of the challenges encountered during development of the floating LNG facility (i.e. LNG FPSO and FSRU) will be reviewed together with their investigated solution. At the same time, research of new LNG-related technologies such as combined containment system will be presented.