• Title/Summary/Keyword: LNG ship

Search Result 229, Processing Time 0.031 seconds

Parametric Investigation of BOG Generation for Ship-to-Ship LNG Bunkering

  • Shao, Yude;Lee, Yoon-Hyeok;Kim, You-Taek;Kang, Ho-Keun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.3
    • /
    • pp.352-359
    • /
    • 2018
  • As a fuel for ship propulsion, liquefied natural gas (LNG) is currently considered a proven and reasonable solution for meeting the IMO emission regulations, with gas engines for the LNG-fueled ship covering a broad range of power outputs. For an LNG-fueled ship, the LNG bunkering process is different from the HFO bunkering process, in the sense that the cryogenic liquid transfer generates a considerable amount of boil-off gas (BOG). This study investigated the effect of the temperature difference on boil-off gas (BOG) production during ship-to-ship (STS) LNG bunkering to the receiving tank of the LNG-fueled ship. A concept design was resumed for the cargo/fuel tanks in the LNG bunkering vessel and the receiving vessel, as well as for LNG handling systems. Subsequently, the storage tank capacities of the LNG were $4,500m^3$ for the bunkering vessel and $700m^3$ for the receiving vessel. Process dynamic simulations by Aspen HYSYS were performed under several bunkering scenarios, which demonstrated that the boil-off gas and resulting pressure buildup in the receiving vessel were mainly determined by the temperature difference between bunkering and the receiving tank, pressure of the receiving tank, and amount of remaining LNG.

A Study on the Design of Training Contents for LNG Bunkering Workers (LNG 벙커링 종사자 교육 콘텐츠 설계에 관한 연구)

  • Yoo, Hyoung-Soo;Roh, Beom-Seok;Kang, Suk-Yong;Seo, Seong-Min;Jung, Dong-Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.5
    • /
    • pp.809-818
    • /
    • 2022
  • The number of ships using liquefied natural gas (LNG) as fuel is increasing to respond to the International Maritime Organization's (IMO) air pollutant emission regulations. At the same time, the need to expand LNG bunkering infrastructure for stable fuel supply and demand for ships is emerging. LNG bunkering is carried out in three ways: truck to ship (TTS), pipe to ship (PTS), and ship to ship (STS). In foreign countries, all three methods are being carried out, but in Korea, LNG bunkering is carried out only with the TTS method owing to the lack of infrastructure. LNG bunkering is a high-risk operation. For safe bunkering operations, the competence of the workers is extremely important, and a professional training course is required to strengthen the competence. This study was conducted to design training contents for LNG bunkering workers for fostering LNG bunkering experts and performing safe and systematic bunkering work. To this end, the current status of LNG-fueled ships and bunkering was identified, and related domestic and abroad educational contents were analyzed. In addition, opinions on the importance of educational contents were collected through expert questionnaires. Consequently, we designed training contents suitable for various training targets and divided them into basic and advanced training courses, with a duration of 4 days, and proposed. Based on the designed training contents, if additional research is conducted by sufficiently reflecting Korea's bunkering environment, it will be of great help to improve the competence of LNG bunkering workers and to foster human resources.

Study of Process for Offshore LNG Production (해상에서의 LNG 생산을 위한 공정 고찰)

  • Kim, Seung-Hyuk;Ha, Mun-Keun;Kim, Byung-Woo;Sadasivam, M.;Koo, Keun-Hoe
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.119-123
    • /
    • 2002
  • Liquefied Natural Gas(LNG) continues to attract modern gas industries as well as domestic markets as their main energy source in the recent years. This is mainly because LNG is inherently cleaner and more energy efficiency than other fuels. Offshore LNG production plant is of interest to many oil producing companies all over the world. This article discuss about the production process encountered while developing such a production facility. Typical offshore oil and gas processing required for oil stabilization and other optional units that can be added to the facilities. The production process can broadly be divided into five major units namely, (i) Oil Stabilization unit, (ii) Gas Treatment unit, (iii) Methane Recovery unit, (iv) Distillation unit and (v) LNG Liquefaction unit. The process simulation was carried out for each unit with a given wellhead composition. The topside facilities of offshore LNG production plant will be very similar to the process adopted in offshore processing platform along with the typical onshore LNG production plant. However, the process design problems associated with FPSO motion to be taken care of while developing floating LNG production plant.

  • PDF

Performance Assessment of Navigation Seakeeping for Coastal Liquified-Natural-Gas Bunkering Ship (연안선박용 LNG 벙커링 전용선박의 내항성능 평가에 대한 연구)

  • Yi, Minah;Park, Jun-Bum;Lee, Chang-Hee
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.7
    • /
    • pp.904-914
    • /
    • 2020
  • Through the Ministry of Trade, Industry, and Energy, South Korea is trying to support the "Building Project for Liquified Natural Gas (LNG) Bunkering Ship," centered on the Korea Gas Corporation, while the Ministry of Maritime Af airs and Fisheries is pushing to construct an LNG bunkering terminal at Busan New Port. LNG bunkering ships are essential for supplying LNG fuel from the terminal to the ships, resulting in the need for safety operation procedures. Therefore, in this study, the stability of a coastal LNG bunkering ship operating from Busan New Port to the anchorage in Busan Port was assessed to investigate the need for operational procedures for coastal LNG bunkering ships. Seakeeping analysis of the LNG bunkering ship was performed for each significant wave height by combining the response amplitude operator from the ship motion analysis under the potential flow theory with the actual observed sea data for five years and Texel, Marsen, and Arsloe (TMA) spectrum suitable for the Busan coast. The results showed that the roll and horizontal acceleration were the main risks that affected the navigation seakeeping performance above a significance wave height of 2 m. The operational periods of the LNG bunkering ship ranged from 83.3% to 99.9% of the total observation period.

A Study on the Development of Educational Programs for LNG Bunkering in Consideration of the Safety System

  • Han, Se-Hyun;Yun, Yong-Sup;Kim, Jong-Su;Lee, Young-Chan
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.3
    • /
    • pp.268-277
    • /
    • 2016
  • This paper aims at presenting bunkering educational programs for LNG fueled ship taking into consideration existing similar education programs and safety systems at the international level in order to enhance both seafarers' and vessels' safety. Heavy fuel oil has typically been used as fuel of ship propulsion. The competitiveness of the fuel oil is recently getting weak in terms of cost and environmental aspects. Liquefied natural gas is introduced for ship propulsion in the maritime field as a new energy source replacing heavy fuel oil. In order to prepare for installation and operation of LNG fueled propulsion ship on board, International Maritime Organization has discussed this subject for about 10 years. As a result of the discussion on such ships in IMO, the International Code of Safety for Ships Using Gases or Other Low-Flash-Point Fuels entered into force on the year 2015. International organizations and several countries therefore drives actively entire researches and other businesses with a view to providing equipment and system of LNG bunkering. The systems are divided into ship-to-ship transfer, terminal / pipeline-to-ship transfer and truck-to-ship transfer. By adopting transfer system of LNG bunkering, many human resources will be needed in these areas on scene as well as on managing, operating, trading, finance, design of LNG bunkering industries. LNG bunkering is just in the beginning stage. Hence, this paper reviews and proposes professional educational programs of LNG bunkering in consideration of technical aspects of the safety system of LNG bunkering based on the types of bunkering systems.

Development of the First LNG Bunkering Barge System in Korea (한국 최초의 LNG벙커링 바지시스템 개발)

  • Jung, Dong-Ho;Oh, Seung-Hoon;Jung, Jae-Hwan;Hwang, Sung-Chul;Sung, Hong-Gun;Lee, Jae-Ik;Kim, Eun-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.162-163
    • /
    • 2018
  • This study introduces the R&D project of development of the 1st LNG bunkering barge in Korea. The Design and pilot test of Barge-To-Ship 500cbm LNG bunkering barge system for coastal trading LNG-fueled ship is proposed. The following technologies will be developed from the project ; Basic/Detail design and pilot test of LNG Bunkering barge system, Basic/Detail design and pilot test of LNG bunkering process system considering LNG loading/unloading, Basic/Detail design and pilot test of 500cbm LNG tank in type-C, Evaluation of bunkering performance according to conditions (environment, SIMOPs) by numerical simulation, Performance evaluation of bunkering barge, towed barge and Barge-To-Ship motion considering ocean environment load, and scenario in Barge-To-Ship LNG bunkering. This project will contribute expansion to LNG-fueled ship industry and pave the way to establish LNG bunkering hub port.

  • PDF

Comparative Study on Collision Strength of LNG Carriers

  • Choe, Ick-Hung;Kim, Jae-Hyun;Ahn, Ho-Jong;Kim, Oi-Hyun
    • Journal of Ship and Ocean Technology
    • /
    • v.5 no.3
    • /
    • pp.36-44
    • /
    • 2001
  • The collision energy absorbing characteristics of side structure of the LNG carriers which have the cargo containment systems of the spherical and the membrane types are compared. A failure mechanism of the double hull side structures of 130, 000 $m^3$ class LNG carriers under sideways collision event has been simulated by using the detailed finite element calculations. In ship collision analysis, the finite element method based on explicit time integration has been use[1 with much success. Finite element modeling techniques for detail description of structural members antral ship motion regarding the dynamic behavior allowed to investigate the effect of bow shape and the initial contact position on side shell of collided ship. In the numerical simulations of the ship-to-ship sideways collision, the effect of the colliding bow shapes and the change of the colliding ship draft are investigated. The critical collision energy which is absorbed by a side structure of a collided ship until the fore-end of colliding ship arrives at the boundary of the cargo tank is calculated. The critical speed of specified colliding ships which can not penetrate the boundary of the LNG cargo tank of the collided ship under collision accident if evaluated.

  • PDF

Study on sloshing simulation in the independent tank for an ice-breaking LNG carrier

  • Ding, Shifeng;Wang, Gang;Luo, Qiuming
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.12 no.1
    • /
    • pp.667-679
    • /
    • 2020
  • As the LNG carrier operates in ice covered waters, it is key to ensure the overall safety, which is related to the coupling effect of ice-breaking process and internal liquid sloshing. This paper focuses on the sloshing simulation of the ice-breaking LNG carrier, and the numerical method is proposed using Circumferential Crack Method (CCM) and Volume of Vluid (VOF) with two main key factors (velocity νx and force Fx). The ship motion analysis is carried out by CCM when the ship navigates in the ice-covered waters with a constant propulsion power. The velocity νx is gained, which is the initial excitation condition for the calculation of internal sloshing force Fx. Then, the ship motion is modified based on iterative computations under the union action of ice-breaking force and liquid sloshing load. The sloshing simulation under the LNG tank is studied with the modified ship motion. Moreover, an ice-breaking LNG ship with three-leaf type tank is used for case study. The internal LNG sloshing is simulated with three different liquid heights, including free surface shape and sloshing pressure distribution at a given moment, pressure curves at monitoring points on the bulkhead. This present method is effective to solve the sloshing simulation during ice-breaking process, which could be a good reference for the design of the polar ice-breaking LNG carrier.

Analysis of Life Cycle Assessment (LCA) for Sustainable Basic Design Alternatives for Medium-Sized LNG-DF Propulsion Ship (LNG-DF추진 중형선박의 지속가능한 기본설계 대안을 위한 전과정평가(LCA) 분석)

  • Ki Seok Jung;Dong Kun Lee
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.60 no.5
    • /
    • pp.358-366
    • /
    • 2023
  • Due to the International Maritime Organization's (IMO) environmental regulations on NOx and SOx, LNG-fueled eco-friendly ships are gaining attention worldwide, and various eco-friendly ships are being proposed and demanded for conversion to eco-friendly ships in Korea, as the eco-friendly ship law has recently been enforced. In this study, the initial basic design was performed to convert an existing Marine Gas Oil (MGO) fueled ship into an LNG-DF propulsion ship, targeting medium-sized ship, to select the fuel tank capacity and main dimensions and appropriate fuel ratio between the two fuels. In particular, Sustainable basic design method considering environmental impact were proposed by performing a Life Cycle Assessment (LCA) throughout the design process, and various design options were compared and analyzed to meet different design conditions by applying them.