• Title/Summary/Keyword: LNG 플랜트 프로젝트

Search Result 5, Processing Time 0.021 seconds

Decision Methodology for LNG Plant FEED Evaluation using Analytic Hierarchy Process (LNG 플랜트 프로젝트의 기본설계 평가방법에 관한 연구)

  • Park, Jong-Hwa;Cho, Dae-Myeong
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.3
    • /
    • pp.52-58
    • /
    • 2016
  • In this study, evaluation method for LNG plant FEED is suggested and its validity is confirmed using a well-known decision making technique of Analytic Hierarchy Process (AHP). It is a pairwise comparison technique which can be used when multiple options must be considered for a single decision making problem. In order to develop an objective decision methodology, various decision parameters, sub-parameters as well as the concept of scale of assessment were introduced, and its consistency among these parameters was also checked by calculating the consistency index (C.I.). The methodology suggested in this article will contribute in evaluation of LNG plant FEED with less bias and subjectivity associated with the decision making procedure.

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.

LNG시장과 LNG Offshore Terminal 개발 동향

  • 김재신
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.41 no.2
    • /
    • pp.94-99
    • /
    • 2004
  • 전 세계적으로 천연가스의 수요가 급격하게 증가함에 따라 천연가스의 생산 및 공급이 활발하게 이루어지고 있고, 향후 10년 간 천연가스의 사용량이 현재의 2배 이상이 될 것이라는 추측도 나오고 있다. 이에 따라 천연가스 생산지에서는 천연가스 액화 플랜트(Liquefaction Plant)와 저장 탱크(LNG Storage Tank), 수입하는 곳에서는 재기화 플랜트(Regasification Plant)와 저장 탱크, 그리고 LNG를 운송할 LNG 운반선의 신조프로젝트가 활발하게 진행되고 있다. 미국의 경우 911테러와 NIMBY 사고의 확대로 인하여 LNG 수입기지의 육상건설을 주민들의 반대하자 해상에 건조하려는 경향을 보이고 있으며, 이에 따라 여러 가지 형태의 LNG Offshore 터미널이 설계되고 있다. 향후 LNG의 급격한 수입이 예상되는 나라로는 미국, 중국, 인도 등이 있으며 수출국으로는 카타르가 급격하게 부상하고 있다. (중략)

  • PDF

Application of Metadata System for Efficient Information Management in Logistics of LNG plant (LNG 플랜트 로지스틱스 단계의 효율적 정보관리를 위한 메타데이터 시스템 적용 방안)

  • Choi, Chang-Hoon;Won, Seo-Kyung;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.92-100
    • /
    • 2016
  • Many research efforts have made on various fields to develop a system which is able to process diverse data in terms of efficiency and accuracy as well as minimizing the error in data-processing. As known, it is obvious that procurement is crucial process for the plant projects due to its importance and impact on the performance. It is strongly required to develop an effective metadata system to assist optimal controlling data for the logistics discipline of procurement processes in plant projects. Therefore, the main purpose of this paper is to apply a metadata system for logistics of the plant projects. The suggested technical module is tested using sample data and evaluated its performance in terms of accuracy and running speed. The results of this research will be extended to the other processes of plant projects in order to achieve a ultimately process-based life-cycle plant project information management system

Advanced Dual Refrigerant Expansion Cycle for LNG Liquefaction (천연가스 액화용 이중 냉매 팽창 사이클)

  • Kim, Minki;Kim, Mungyu;Lee, Kihwan;Kim, Hyobin;Lee, Donghun;Min, Joonho;Kim, Jinmo
    • Plant Journal
    • /
    • v.15 no.2
    • /
    • pp.46-55
    • /
    • 2019
  • This paper presents a LNG Liquefaction cycle configuration using two stages of methane expansion (i.e. spliting into two stages as warm & cold to generate an additional inflection point within a cold composite curve) and a single stage of nitrogen expansion to improve the efficiency of the conventional Methane & Nitrogen Expansion Cycle. In comparison with Double Nitrogen Expansion Cycel and Methane & Nitrogen Expansion Cycle, the cycle efficiency has increased approximately from 13.92 and 13.13 to 12.08 kW/ton/day (8~15% efficiency increase). A Life Cycle Cost (LCC) analysis based on Net Present Value (NPV) also show an improvement in therms of project NPV, against a minor increment of a CAPEX.