• 제목/요약/키워드: Korean Construction Company

검색결과 894건 처리시간 0.023초

자금조달환경과 건설업체 경영상태 간의 관계성 분석 연구 (A Relation between Financing Conditions and Business Operation of a Construction Company)

  • 서정범;이상효;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권1호
    • /
    • pp.61-70
    • /
    • 2012
  • A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.

아파트 브랜드 선호도 요인 비교에 관한 연구 -수도권지역과 시 단위지역 중심의 선호도 비교- (The Research on the Preference Factors of Apartment Brand)

  • 신한우;김대원;강경인;김광희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.77-82
    • /
    • 2008
  • In the housing market, the construction company started to recognize the importance of the brand power since 1998. Many brand names of apartment construction company have newly formed and many apartments are representative of the brands of construction company by quality of apartment construction and service after hand apartment over to owner with many other elements of their brands. According to these trends in the housing market, it should be also interested in improving the value of brand name in apartment construction. The former researches have been achieved several topics in only a specific target market about the distinction of apartment's plan, the examination of preference, and the satisfaction survey of inhabitants etc. But construction company don't have developed any available marketing strategy according to construction location and regional characteristics. Nowadays, they should be interested in improving the value of apartment brand. Therefore, this research was conducted by interviewing and surveying preference factor, which factors are considered by consumer when consumers purchase apartment house, to compare the two regions such as Metropolis and Cities. The purpose of this research is to provide the preference trend of apartment house in the future to construction company by comparing consumer's preference examination.

Causes of Delay in Khuzestan Steel Company Construction Projects

  • Saeb, Sajjad;Khayat, Navid;Telvari, Abdulrasoul
    • Industrial Engineering and Management Systems
    • /
    • 제15권4호
    • /
    • pp.335-344
    • /
    • 2016
  • Construction project is a competitive business with high risk especially in developing countries like Iran which faces with many problems such as delay and time and costs increases. Thus, the first priority here is to determine the causes of prolongation of construction projects and to evaluate their importance. Khuzestan Steel Company (KSC) has made important contribution to the projects in Iran and in turn is required to finish them on time. In this study, an attempt was made to investigate the causes of delay in implementation of construction projects held by this company. Data was collected through questionnaire distributed among the sample including 10 owners, 10 consultants and 15 con-tractors. Accordingly, participants rated the causes in the questionnaire so the most important priorities of each area were specified using TOPSIS method. The results showed that according to the employers, consultants and contractors' viewpoints, the most important reason for delays in construction projects of KSC is related to the financial matters. Hence, according to the results obtained, causes for delays in the company's projects are largely related to the drilling permits and long administrative cycle to renew them. Besides, continuous production of steel in this company is another reason to delays of construction projects.

TOP-MOUNTED IN-CORE INSTRUMENTATION : CURRENT STATUS AND TECHNICAL ISSUES

  • KIM, SUNG JUN;KANG, TAE KYO;CHO, YEON HO;CHANG, SANG GYOON;LEE, DAE HEE;MAENG, CHEOL SOO
    • 에너지공학
    • /
    • 제24권2호
    • /
    • pp.154-166
    • /
    • 2015
  • The in-core instrumentation measures core power distribution and coolant temperature in local regions of the core in pressurized water reactors. The installation types are distinguished by the designs of routing paths that exit either through reactor bottom mounted instrument nozzles or through reactor top mounted instrument nozzles. Although each type has unique advantages, it is generally known that top mounted design is more competitive with respect to emphasizing nuclear safety issues and ability to cope with severe accidents. The international nuclear vendors have provided various types of reactors with top mounted design. Nuclear power reactors in Korea, however, only have been designed to be applicable to the use of bottom mounted design, and it has been pointed out that the capabilities of Korean reactors against severe accidents should be further enhanced. The paper deals with technical issues on reactor internal and external design, in-core instrumentation, support assembly, sealing mechanism with nozzles, handling, and analytical issues in order to establish the ways of development.

건설업의 산업재해 감소와 관련한 안전관리비용 절감에 관한 조사 연구 (A Survey on the Save of Cost for Safety Management by Reduction of Industrial Accidents in Construction Industry)

  • 이영섭
    • 한국안전학회지
    • /
    • 제11권1호
    • /
    • pp.99-107
    • /
    • 1996
  • This survey is to compare the the number of accidents which were occurred in 24 construction companies with the average accident in construction industry. The number of accidents in 24 companiesis is lower than the average accident, then it is classified "save", otherwise it is classified "loss". This survey is conducted to have top management be interested and invest for safety by recognizing that safety management could be profit for the company. The result of this survey is as follows : The total save amount in 1992 is 44,780mi11ion Won and average is 1,870mi11ion Won, with being 11, 200mi11ion Won by reduction amount of deaths and 33,580mi11ion Won by reduction amount of injuries. In 1993 the total is 33,330mi11ion Won and average is 1,390mi11ion Won, and in 1994 the total is 38, 720mi11ion Won and the average is 1,610mi11ion Won. This result is save amount of workmen's compensation insurance with excluding the indirect costs for accidents. The company which ranked the highest save amount is B Construction Company with being 15.1 billion Won and the next is A Construction Company during 3 years. The Company which ranked highest percentage of save amount to sales amount is Q Heavy industry with being 0.359% and the next is B Construction Company during 3 years.pany during 3 years.

  • PDF

건설 CRM 시스템 효과검증에 관한 연구 (A Study on the Effectiveness Verification of Construction CRM systems)

  • 조경린;황욱선;김용수
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.137-145
    • /
    • 2007
  • 본 연구는 건설 CRM 시스템의 효과가 주택사업 고객관리시스템에 어떠한 영향을 미치는지를 파악하기 위하여 수행되었다. 즉 건설 CRM 시스템이 주택사업 분양고객의 구전효과와 고객 만족도, 청약 고객의 재방문에 따른 영향을 실증적으로 분석하는데 목적이 있다. 본 연구의 수행을 위해 분양 고객과 청약 고객 각 175명을 대상으로 분석하였다. 건설 CRM 시스템은 서비스품질 요인에 입각하여 유형성, 신뢰성, 응답성, 확신성, 공감성 등으로 측정하였고 효과검증 변수는 고객 만족도, 구전 효과, 재방문으로 측정하였다. 실증 분석 결과, 부분적 채택으로 나타났다. 즉 건설 CRM 시스템은 분양 고객과 청약 고객의 구전효과, 만족도, 재방문 의사의 향상을 도와 궁극적으로 건설회사의 경영성과 향상에 기여할 수 있는 경쟁력 있는 경영도구로의 활용가능성이 큰 것으로 나타났다. 또한 본 연구는 건설 CRM 시스템의 효과를 실질적으로 검증함으로써 건설 CRM의 필요성과 발전 가능성을 제시하였다.

국내 대형건설회사의 책임형 건설사업관리 도입 현황 분석 (A Current Status Study on the Introduction of CM at Risk on the Domestic Major Construction Company)

  • 유승규;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.5-8
    • /
    • 2009
  • This paper investigated the qualitative introduction status of domestic major construction company. And that focused on a point of suggestions about CM at Risk introduction. The survey analysis showed that three importan suggestions. First, the biggest obstacles factors to CM at Risk introduction that related laws is lagging amendment. Second, we have to improve the available hands ability in domestic major construction company. And last, we have to do that using uncomplicated design and standard design form. Consequently, environmen analysis for the introduction and example project is urgently required.

  • PDF