References
- U.S. Nuclear Regulatory Commission Technical Training Center, "Combustion Engineering Technology Cross Training Course - Systems Manual", Chapter 1.0, 1996, [Online]. (http://pbadupws.nrc.gov/docs/ML0228/ML022840127.pdf)
- Electric Power Research Institute, "Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines", MRP-227 Final Report, Revision 0, December, 2008, [Online]. (http://pbadupws.nrc.gov/docs/ML0901/ML090160205.pdf)
- Westinghouse Electric Company, "AP1000 Design Control Document", Chapter 5.3, Tier 2 Material, Revision 19, June 13, 2011, [Online]. (http://pbadupws.nrc.gov/docs/ML1117/ML11171A453.pdf)
- AREVA NP, "U.S. EPR Final Safety Analysis Report", Chapter 4.1, Tier 2, Revision 4, [Online] (http://pbadupws.nrc.gov/docs/ML1307/ML13073A527.pdf)
- AREVA NP, "U.S. EPR In-Core Instrumentation System Report" ANP-10271NP, Revision 0, December, 2006, [Online]. (http://pbadupws.nrc.gov/docs/ML0635/ML063540161.pdf)
- Mitsubishi Heavy Industries, "US-APWR Design Description", October, 2006, [Online]. (http://pbadupws.nrc.gov/docs/ML0630/ML063030474.pdf)
- Gerard Chevereau, "Instrumentation Arrangement for a Pressurized Water Reactor", U.S. Patent 5,057,270, October 15, 1991.
- Westinghouse Electric Company, "Instrumentation Needs for Integral Primary System Reactors (IPSRs)", Task 1, Final Report, Revision 1, Cooperative Agreement DE-FC07-05ID14690 STD-AR-05-01, September, 2005. [Online]. (http://www.google.co.kr/url?sa=t&rct=j&q=&esrc=s&frm=1&source=web&cd=1&ved=0CBwQFjAA&url=https%3A%2F%2Fsmr.inl.gov%2FDocument.ashx%3Fpath%3DDOCS%252FSMR%2Btechnologies%252FLWR%252FLWR%252FCAREM34847_-_STD-AR-05-05-r1%255B1%255D.pdf&ei=7dzWVMGjLZDY8gXog4D4AQ&usg=AFQjCNF6WvLGSnIzr5x_E5_nccMRil50wA&bvm=bv.85464276,d.dGc&cad=rjt)
- Nuclear Engineering International, "Vanadium Detectors Offer Accuracy and Long Life", March, 2002, [Online]. (http://www.neimagazine.com/features/featurevanadium-detectors-offer-accuracy-and-long-life)
- Jianfeng Yang, John F. Kielb, Lixin Yu, "Analysis Methodology Used in the Qualification of Westinghouse AP1000 Instrumentation Grid Assembly", Proceedings of the ASME 2010 Pressure Vessel & Piping Division / K-PVP Conference, Bellevue, Washington, USA, July 18-22, 2010.
- Daniel Kistler, Mechael Prible, Joe Hahn, John Iocovino, Michael Heibel, Thomas Kindred, "Topmounted Incore Instrumentation Insertion Test for Westinghouse AP1000", Proceedings of ICAPP 2008, Anaheim, California, USA, June 8-12, 2008
- Westinghouse Electric Company, "AP1000 Response to Request for Additional Information", SRP 5, April, 2010, [Online]. (http://pbadupws.nrc.gov/docs/ML1021/ML102170033.pdf)
- U.S. Nuclear Regulatory Commission Human Resources Training & Development, "Reactor & Vessel Design: AP1000 Technology", Chapter 2.0, [Online]. (http://pbadupws.nrc.gov/docs/ML1122/ML11221A080.pdf)
- Mark Yorns and Douglas Porter, "Readily Disconnectable Nozzle Arrangement for Use with Nuclear Reactor", U.S. Patent 5,323,428, June 21, 1994
- Kenneth V. Margotta, Russell R. Radant, Douglas S. Porter, and Mark W. Yorns, "Readily Disconnectable Nozzle Arrangement for use with a Nuclear Reactor", U.S. Patent 5,513,227, April 30, 1996.
- Tae-Kyo Kang et al., "Modular Reactor Head Area Assembly", U.S. Patent 8,599,989, December 3, 2013.
- Michael D. Heibel, Daniel P. Kistler, Michael Prible, "Self-Powered Wireless In-core Detector", U.S. Patent 20120177167, July 12, 2012.
Cited by
- Effect of in-core instrumentation mounting location on external reactor vessel cooling vol.108, 2017, https://doi.org/10.1016/j.anucene.2017.04.042