DOI QR코드

DOI QR Code

TOP-MOUNTED IN-CORE INSTRUMENTATION : CURRENT STATUS AND TECHNICAL ISSUES

  • KIM, SUNG JUN (Mechanical System Engineering Department, NSSS Division, KEPCO Engineering & Construction Company Inc.) ;
  • KANG, TAE KYO (Mechanical System Engineering Department, NSSS Division, KEPCO Engineering & Construction Company Inc.) ;
  • CHO, YEON HO (Mechanical System Engineering Department, NSSS Division, KEPCO Engineering & Construction Company Inc.) ;
  • CHANG, SANG GYOON (Mechanical System Engineering Department, NSSS Division, KEPCO Engineering & Construction Company Inc.) ;
  • LEE, DAE HEE (Mechanical System Engineering Department, NSSS Division, KEPCO Engineering & Construction Company Inc.) ;
  • MAENG, CHEOL SOO (Mechanical System Engineering Department, NSSS Division, KEPCO Engineering & Construction Company Inc.)
  • Received : 2015.03.17
  • Accepted : 2015.06.04
  • Published : 2015.06.30

Abstract

The in-core instrumentation measures core power distribution and coolant temperature in local regions of the core in pressurized water reactors. The installation types are distinguished by the designs of routing paths that exit either through reactor bottom mounted instrument nozzles or through reactor top mounted instrument nozzles. Although each type has unique advantages, it is generally known that top mounted design is more competitive with respect to emphasizing nuclear safety issues and ability to cope with severe accidents. The international nuclear vendors have provided various types of reactors with top mounted design. Nuclear power reactors in Korea, however, only have been designed to be applicable to the use of bottom mounted design, and it has been pointed out that the capabilities of Korean reactors against severe accidents should be further enhanced. The paper deals with technical issues on reactor internal and external design, in-core instrumentation, support assembly, sealing mechanism with nozzles, handling, and analytical issues in order to establish the ways of development.

Keywords

References

  1. U.S. Nuclear Regulatory Commission Technical Training Center, "Combustion Engineering Technology Cross Training Course - Systems Manual", Chapter 1.0, 1996, [Online]. (http://pbadupws.nrc.gov/docs/ML0228/ML022840127.pdf)
  2. Electric Power Research Institute, "Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines", MRP-227 Final Report, Revision 0, December, 2008, [Online]. (http://pbadupws.nrc.gov/docs/ML0901/ML090160205.pdf)
  3. Westinghouse Electric Company, "AP1000 Design Control Document", Chapter 5.3, Tier 2 Material, Revision 19, June 13, 2011, [Online]. (http://pbadupws.nrc.gov/docs/ML1117/ML11171A453.pdf)
  4. AREVA NP, "U.S. EPR Final Safety Analysis Report", Chapter 4.1, Tier 2, Revision 4, [Online] (http://pbadupws.nrc.gov/docs/ML1307/ML13073A527.pdf)
  5. AREVA NP, "U.S. EPR In-Core Instrumentation System Report" ANP-10271NP, Revision 0, December, 2006, [Online]. (http://pbadupws.nrc.gov/docs/ML0635/ML063540161.pdf)
  6. Mitsubishi Heavy Industries, "US-APWR Design Description", October, 2006, [Online]. (http://pbadupws.nrc.gov/docs/ML0630/ML063030474.pdf)
  7. Gerard Chevereau, "Instrumentation Arrangement for a Pressurized Water Reactor", U.S. Patent 5,057,270, October 15, 1991.
  8. Westinghouse Electric Company, "Instrumentation Needs for Integral Primary System Reactors (IPSRs)", Task 1, Final Report, Revision 1, Cooperative Agreement DE-FC07-05ID14690 STD-AR-05-01, September, 2005. [Online]. (http://www.google.co.kr/url?sa=t&rct=j&q=&esrc=s&frm=1&source=web&cd=1&ved=0CBwQFjAA&url=https%3A%2F%2Fsmr.inl.gov%2FDocument.ashx%3Fpath%3DDOCS%252FSMR%2Btechnologies%252FLWR%252FLWR%252FCAREM34847_-_STD-AR-05-05-r1%255B1%255D.pdf&ei=7dzWVMGjLZDY8gXog4D4AQ&usg=AFQjCNF6WvLGSnIzr5x_E5_nccMRil50wA&bvm=bv.85464276,d.dGc&cad=rjt)
  9. Nuclear Engineering International, "Vanadium Detectors Offer Accuracy and Long Life", March, 2002, [Online]. (http://www.neimagazine.com/features/featurevanadium-detectors-offer-accuracy-and-long-life)
  10. Jianfeng Yang, John F. Kielb, Lixin Yu, "Analysis Methodology Used in the Qualification of Westinghouse AP1000 Instrumentation Grid Assembly", Proceedings of the ASME 2010 Pressure Vessel & Piping Division / K-PVP Conference, Bellevue, Washington, USA, July 18-22, 2010.
  11. Daniel Kistler, Mechael Prible, Joe Hahn, John Iocovino, Michael Heibel, Thomas Kindred, "Topmounted Incore Instrumentation Insertion Test for Westinghouse AP1000", Proceedings of ICAPP 2008, Anaheim, California, USA, June 8-12, 2008
  12. Westinghouse Electric Company, "AP1000 Response to Request for Additional Information", SRP 5, April, 2010, [Online]. (http://pbadupws.nrc.gov/docs/ML1021/ML102170033.pdf)
  13. U.S. Nuclear Regulatory Commission Human Resources Training & Development, "Reactor & Vessel Design: AP1000 Technology", Chapter 2.0, [Online]. (http://pbadupws.nrc.gov/docs/ML1122/ML11221A080.pdf)
  14. Mark Yorns and Douglas Porter, "Readily Disconnectable Nozzle Arrangement for Use with Nuclear Reactor", U.S. Patent 5,323,428, June 21, 1994
  15. Kenneth V. Margotta, Russell R. Radant, Douglas S. Porter, and Mark W. Yorns, "Readily Disconnectable Nozzle Arrangement for use with a Nuclear Reactor", U.S. Patent 5,513,227, April 30, 1996.
  16. Tae-Kyo Kang et al., "Modular Reactor Head Area Assembly", U.S. Patent 8,599,989, December 3, 2013.
  17. Michael D. Heibel, Daniel P. Kistler, Michael Prible, "Self-Powered Wireless In-core Detector", U.S. Patent 20120177167, July 12, 2012.

Cited by

  1. Effect of in-core instrumentation mounting location on external reactor vessel cooling vol.108, 2017, https://doi.org/10.1016/j.anucene.2017.04.042