• Title/Summary/Keyword: Korea Electric Power Corporation (KEPCO)

Search Result 638, Processing Time 0.027 seconds

Long-Term Generation Expansion Strategies for the Reduction of $CO_2$ Emission in Korea (지구온난화 가스 배출 감소를 위한 장기 전원개발계획 전략)

  • Kim, K.I.;Park, J.B.;Kim, K.H.;Lee, S.C.;Park, K.S.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.1083-1087
    • /
    • 1997
  • Every effort is now being exerted in industrialized and developing countries to reduce emission of greenhouse gases from electric power sector. In this paper, we provide supply-side resource mix strategies in the long-term generation expansion planning under the expected greenhouse gas regulations. Under the environmental regulations, we explore the least-cost generation expansion plan of Korea and determine the composition of future resource mixes. Our analysis is performed on the basis of the revised WASP package which can evaluate emission of carbon dioxide from each power plant. The evaluation process of carbon dioxide emissions, which can consider the efficiency and operating conditions of each generator simultaneously, has been incorporated into the probabilistic production cost simulation module of WASP.

  • PDF

Conceptual Design and Operation Results for SF6 Decomposition and Pollution Control System (SF6 분해 및 무해화 시스템의 개념 설계 및 운영 결과)

  • Joongwon, Lee;Miyeong, Kim;Jiho, Ahn;Younghwan, Byun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.111-118
    • /
    • 2022
  • SF6 is used as an insulating gas because of its excellent electrical insulation properties, non-toxicity, and non-inflammability. On the other hand, the global warming potential of SF6 is 23,900 times higher than that of CO2. The Korea electric power cooperation (KEPCO) is responsible for 80% of the domestic SF6 usage, and approximately 6,000 tons are currently charged in electrical and power facilities. KEPCO will gradually replace the insulating gas with SF6-free gas from 2023. SF6 decomposition facilities are required because more than 60 tons of SF6 will need to be disposed of annually from existing equipment. This study developed a novel decomposition and pollution control system that can process 60 tons of SF6 per year. This facility can decompose more than 97.7% of SF6, with the emissions of hazardous and toxic materials below the legal limit.

Technical Feasibility Study on the Biomimetic Drone for Inspection of Electric Power Lines (전력선로 점검용 생체모방형 드론에 관한 기술적 실현가능성 연구)

  • Park, Joon-Young;Lee, Jae-Kyung;Kim, Seok-Tae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.543-548
    • /
    • 2016
  • Live-line maintenance for electric power lines is very dangerous because of their ultra-high voltage environments and the risks of falling from heights. Recently, drone technology has been spotlighted due to its maneuverability and stable controllability, and has been being applied to maintenance works in the electric power industry. This paper presents a new type of drone that can be transformable by introducing biomimetics to its mechanism and can run on an overhead ground wire as well as it can fly. Its technical feasibility was confirmed through experiments.

Crack-healing and durability performance of self-healing concrete with microbial admixture (미생물 혼입 자기치유 콘크리트의 균열 치유성능 및 내구성능)

  • Chu, Inyeop;Woo, Sang-Kyun;Lee, Byung-Jae;Lee, Yun;Lee, Hyo-Sub
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.295-299
    • /
    • 2021
  • Recently, interest in maintenance has been increasing due to the enlargement and aging of infra structures. Therefore, a new paradigm is required to secure and improve the durability of structures differentiated from the past. Accordingly, research on smart concrete incorporating the concept of self-healing into concrete is being actively conducted. In this study, the crack healing performance and durability performance of self-healing concrete applied with a hydrogel containing biomineral-forming microorganisms were evaluated. As a result of evaluating the dispersion of the hydrogel in concrete, it was confirmed that the hydrogel was well distributed in concrete matrix with a dispersion coefficient of 0.35 to 0.46. The crack healing performance evaluation was verified by a water permeability test, and showed a recovery rate of 95% or more at the age of 28 days, confirming the applicability of self-healing concrete. The durability performance of self-healing concrete was evaluated in terms of resistance to penetration of chloride ion and freezing and thawing. Regardless of the mixing of the hydrogel, the same level of durability performance was shown for various compressive strength level. Therefore, it was confirmed that the microbial admixture did not affect concrete durability. In the future, long-term crack healing performance and durability verification studies should be supplemented.

Study and Recovery on the Capacity Loss after the Long Charge-discharge Operation of VRFB-ESS (장시간 충방전에 따른 VRFB-ESS의 용량 손실 회복에 대한 연구)

  • Hai-Kyung, Seo;Wonshik, Park;Jae-woo, Park;Kangsan, Kim;Hansol, Choi
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.181-187
    • /
    • 2022
  • As the charges/discharges of VRFB-ESS were repeated during 150cycles or more, the capacity of electrolyte in VRFB-ESS was decreased little by little. It results from the decreasing of the level of anolyte and the increasing of the valance value of the catholyte. Then, we tried to recover the capacity loss with 3 different ways. The first way was that the levels of anolyte and catholyte were allowed to be evenly equalized when the difference in the levels of two different electrolytes were severe. The second one was to lessen the valance value of the catholyte through the reduction reaction to 4-valant ions of 5-valant ions in the catholyte with the reductant, oxalic acid. The last one was that the all electrolytes of analyte and catholyte were allowed to be electro-chemically reduced to 3.5 of the valance value by oxidizing new electrolyte with 3.5 valance ions. The last way was the most effective to recover the capacity loss.

Development of AMI NMS (Network Management System) using SNMP for Network Monitoring of Meter Reading Devices (원격검침 설비의 네트워크 상태감시를 위한 SNMP 기반의 저압 AMI 망관리시스템 개발)

  • Kim, Young-Il;Park, So-Jeong;Kim, Young-Jun;Jung, Nam-Jun;Choi, Moon-Suk;Park, Byung-Seok
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.259-268
    • /
    • 2016
  • KEPCO installed AMI (Advanced Metering Infrastructure) metering system for low-voltage customers from 2008. AMI metering system of KEPCO has operated 2.55 million customers and will plan to operate 22 million customers until 2020. KEPCO developed AMI NMS (Network Management System) to operate the meter reading network efficiently. NMS monitors the network status of DCUs (Data Concentration Unit) and modems. NMS provides functionalities of data collection and analysis. It collects property data of network device, network topology information, communication performance information, fault information, and etc. It analyzes collected data and controls network devices by remote access. AMI NMS collects about 370 MIBs (Mangement Information Bases) using SNMP (Simple Network Management Protocol). This paper introduces main functionalities, designed context, and implemented service screen.

Large-scale AC/DC EMT Level System Simulations by a Real Time Digital Simulator (RTDS) in KEPRI-KEPCO

  • Park, In Kwon;Lee, Jaegul;Song, Jiyoung;Kim, Yonghak;Kim, Taekyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.17-21
    • /
    • 2017
  • Recently, the Korea Enhanced Power system Simulator (KEPS) was upgraded with new processor cards and various peripheral devices. The purpose of the upgrade is for the large-scale AC/DC simulation studies for different purposes such as FACTS, PMU applications, and SPS. The need for such study is now growing in KEPCO network. Frequently, traditional ways of performing the necessary study had been found to be less adequate for guiding the key decisions in the company. Therefore, the growing needs, as well as the revealed inadequacy of the traditional system studies, had been attributing to the momentum for the upgrade project. This paper explains the details of the upgrade project. As an example of presenting the effectiveness of the upgraded RTDS system in KEPRI-KEPCO, a large-scale AC/DC real time simulation case which includes the entire Korean network and a planned MMC-HVDC system is introduced.

Performance Analysis of Upgrading Process with Amine-Based CO2 Capture Pilot Plant

  • Kwak, No-Sang;Lee, Junghyun;Lee, Dong Woog;Lee, Ji Hyun;Shim, Jae-Goo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.1
    • /
    • pp.33-38
    • /
    • 2018
  • This study applied upgrades to the processes of a 10 MW wet amine $CO_2$ capture pilot plant and conducted performance evaluation. The 10 MW $CO_2$ Capture Pilot Plant is a facility that applies 1/50 of the combustion flue gas produced from a 500 MW coal-fired power plant, and is capable of capturing up to 200 tons of $CO_2$. This study aimed to quantitatively measure efficiency improvements of post-combustion $CO_2$ capture facilities resulting from process upgrades to propose reliable data for the first time in Korea. The key components of the process upgrades involve absorber intercooling, lean/rich amine exchanger efficiency improvements, reboiler steam TVR (Thermal Vapor Recompression), and lean amine MVR (Mechanical Vapor Recompression). The components were sequentially applied to test the energy reduction effect of each component. In addition, the performance evaluation was conducted with the absorber $CO_2$ removal efficiency maintained at the performance evaluation standard value proposed by the IEA-GHG ($CO_2$ removal rate: 90%). The absorbent used in the study was the highly efficient KoSol-5 that was developed by KEPCO (Korea Electric Power Corporation). From the performance evaluation results, it was found that the steam consumption (regeneration energy) for the regeneration of the absorbent decreased by $0.38GJ/tonCO_2$ after applying the process upgrades: from $2.93GJ/ton\;CO_2$ to $2.55GJ/tonCO_2$. This study confirmed the excellent performance of the post-combustion wet $CO_2$ capture process developed by KEPCO Research Institute (KEPRI) within KEPCO, and the process upgrades validated in this study are expected to substantially reduce $CO_2$ capture costs when applied in demonstration $CO_2$ capture plants.

A Planning study on the VR/AR Common Platform in Electric Power Industry (전력산업에서 VR/AR 기술동향 및 공통 플랫폼 구성방안 연구)

  • Chae, Changhun;Choi, Minhee;Yoo, Eungeun;Lim, Chanuk;Park, Jinwoo;Jung, Namjoon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.397-402
    • /
    • 2016
  • Recently, many ICT companies are trying to expand the ecosystem of VR (Virtual Reality) and AR (Augmented Reality). They are developing a variety of industries such as entertainment, education, e-commerce and so on. There is also contains the power, energy field. And application related with VR/AR will increase in power industry. Thus, Platform is necessary because there are problems such as re-use, interface with legacy system and security. We can expect the convenience and efficiency by developing VR/AR power platform. In this paper, we will discuss the trends of VR/AR technologies, possibilities of VR/AR in energy field, essential elements of VR/AR power platform. In the future, we expect to lead standards of VR/AR in energy and to develop a killer application such as Pokemon GO.

Proposal and Simulation of Optimal Electric Vehicle Routing Algorithm (최적의 전기자동차 라우팅 알고리즘 제안 및 시뮬레이션)

  • Choi, Moonsuk;Choi, Inji;Jang, Minhae;Yoo, Haneul
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.1
    • /
    • pp.59-64
    • /
    • 2020
  • Scheduling of electric vehicles and optimizing for charging waiting time have been critical. Meanwhile, it is challengeable to exploit the fluctuating data from electric vehicles in real-time. We introduce an optimal routing algorithm and a simulator with electric vehicles obeying the Poisson distribution of the observed information about time, space and energy-demand. Electric vehicle routing is updated in every cycle even it is already set. Also, we suggest an electric vehicle routing algorithm for minimizing total trip time, considering a threshold of the waiting time. Total trip time and charging waiting time are decreased 34.3% and 86.4% respectively, compared to the previous algorithm. It can be applied to the information service of charging stations and utilized as a reservation service.