• 제목/요약/키워드: Key site

Search Result 905, Processing Time 0.026 seconds

The center and periphery of the Early and Middle Shang Dynasty based on the production and circulation of bronze, stamped hard pottery, and proto-porcelain (상대(商代) 전·중기 중심과 주변 -청동기와 인문경도, 원시자기 자원의 생산과 유통을 예로-)

  • Li, Hai-Chao;Bae, Hyun-Joon
    • Korean Journal of Heritage: History & Science
    • /
    • v.51 no.2
    • /
    • pp.108-123
    • /
    • 2018
  • This paper focuses on the relationship between center and periphery by discussing the circulation of rare resources, such as bronze, stamped hard pottery, and proto-porcelain. The discussion includes two parts: the internal Shang culture region and the region outside of Shang. Within the Shang culture region, all the resources mentioned above were brought from different places to the Panlongcheng site and then transferred to Zhengzhou Shang city. On the other hand, they also produced and consumed the resources in a special way, which indicates a certain degree of independence. Outside the Shang region, bronze products and maybe even raw copper resources were circulated from Zhengzhou Shang city to the Chengyang site, while stamped hard pottery and proto-porcelain were transferred to Zhengzhou through the Panlongcheng site. Resource circulation was bi-directional. Thus, this resource circulation was one of the key factors to building the relationship between center and periphery.

Structural and Biochemical Analysis of 3-Dehydroquinate Dehydratase from Corynebacterium glutamicum

  • Chan Hwi Lee;Sangwoo Kim;Hogyun Seo;Kyung-Jin Kim
    • Journal of Microbiology and Biotechnology
    • /
    • v.33 no.12
    • /
    • pp.1595-1605
    • /
    • 2023
  • Dehydroquinate dehydratase (DHQD) catalyzes the conversion of 3-dehydroquinic acid (DHQ) into 3-dehydroshikimic acid in the mid stage of the shikimate pathway, which is essential for the biosynthesis of aromatic amino acids and folates. Here, we report two the crystal structures of type II DHQD (CgDHQD) derived from Corynebacterium glutamicum, which is a widely used industrial platform organism. We determined the structures for CgDHQDWT with the citrate at a resolution of 1.80Å and CgDHQDR19A with DHQ complexed forms at a resolution of 2.00 Å, respectively. The enzyme forms a homododecamer consisting of four trimers with three interfacial active sites. We identified the DHQ-binding site of CgDHQD and observed an unusual binding mode of citrate inhibitor in the site with a half-opened lid loop. A structural comparison of CgDHQD with a homolog derived from Streptomyces coelicolor revealed differences in the terminal regions, lid loop, and active site. Particularly, CgDHQD, including some Corynebacterium species, possesses a distinctive residue P105, which is not conserved in other DHQDs at the position near the 5-hydroxyl group of DHQ. Replacements of P105 with isoleucine and valine, conserved in other DHQDs, caused an approximately 70% decrease in the activity, but replacement of S103 with threonine (CgDHQDS103T) caused a 10% increase in the activity. Our biochemical studies revealed the importance of key residues and enzyme kinetics for wild type and CgDHQDS103T, explaining the effect of the variation. This structural and biochemical study provides valuable information for understanding the reaction efficiency that varies due to structural differences caused by the unique sequences of CgDHQD.

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

Exploring Purchase Behavior of Digital Items and Actual Usage in a Social Network Site: A Longitudinal Perspective (소셜 네트워크 서비스 사용자의 디지털 아이템 구매와 실제 사용에 관한 연구: 종단적 관점에서)

  • Kim, Byoung-Soo;Han, Se-Hee;Kang, Young-Sik
    • The Journal of Information Systems
    • /
    • v.21 no.2
    • /
    • pp.97-114
    • /
    • 2012
  • Given the rapid growth of social network services (SNS) such as Facebook and Cyworld, it is important to understand SNS users' decision-making processes such as purchasing and continuance intention. Especially, as a number of SNS providers such as Cyworld and Habbo Hotel recognize the sales of digital items as the main source of their profits, it is critical to in-depth understand SNS users' purchasing behaviors. In this regard, this study explores continued usage behaviors and purchase behaviors of digital items in an SNS environment using a longitudinal research method. This paper develops a theoretical model to deeply understand the key drivers of purchase behavior of digital items through constructs prescribed by two established research streams on information systems, namely continuance usage and habitual usage. Moreover, this study examines the effects of actual and ideal self-image congruity on SNS continuance intention and habit. The research model was tested by using survey data collected from 307 users who have experience with Cyworld. The analysis results show that SNS actual usage directly influence purchase behavior of digital items. SNS users' continuance intention and habit are key drivers to enhance the level of actual usage of the SNS. Both actual and ideal self-image congruity play a key role in enhancing continuance usage and habitual usage. The implication of research and discussions provides reference for SNS providers in marketing and IT strategy.

Perforation optimization of hydraulic fracturing of oil and gas well

  • Zhu, Hai Yan;Deng, Jin Gen;Chen, Zi Jian;An, Feng Chen;Liu, Shu Jie;Peng, Cheng Yong;Wen, Min;Dong, Guang
    • Geomechanics and Engineering
    • /
    • v.5 no.5
    • /
    • pp.463-483
    • /
    • 2013
  • Considering the influences of fluid penetration, casing, excavation processes of wellbore and perforation tunnels, the seepage-deformation finite element model of oil and gas well coupled with perforating technique is established using the tensile strength failure criterion, in which the user-defined subroutine is developed to investigate the dynamic evolvement of the reservoir porosity and permeability. The results show that the increases of perforation angle and decreases of perforation density lead to a higher fracture initiation pressure, while the changes of the perforation diameter and length have no evident influences on the fracture initiation pressure. As for initiation location for the fracture in wellbore, it is on the wellbore face while considering the presence of the casing. By contrast, the fractures firstly initiate on the root of the tunnels without considering casing. Besides, the initial fracture position is also related with the perforation angle. The fracture initiation position is located in the point far away from the wellbore face, when the perforation angle is around $30^{\circ}$; however, when the perforation angle is increased to $45^{\circ}$, a plane fracture is initiated from the wellbore face in the maximum horizontal stress direction; no fractures was found around perforation tunnels, when the angel is close to $90^{\circ}$. The results have been successfully applied in an oilfield, with the error of only 1.1% comparing the fracture initiation pressure simulated with the one from on-site experiment.

PARALLEL IMAGE RECONSTRUCTION FOR NEW VACUUM SOLAR TELESCOPE

  • Li, Xue-Bao;Wang, Feng;Xiang, Yong Yuan;Zheng, Yan Fang;Liu, Ying Bo;Deng, Hui;Ji, Kai Fan
    • Journal of The Korean Astronomical Society
    • /
    • v.47 no.2
    • /
    • pp.43-47
    • /
    • 2014
  • Many advanced ground-based solar telescopes improve the spatial resolution of observation images using an adaptive optics (AO) system. As any AO correction remains only partial, it is necessary to use post-processing image reconstruction techniques such as speckle masking or shift-and-add (SAA) to reconstruct a high-spatial-resolution image from atmospherically degraded solar images. In the New Vacuum Solar Telescope (NVST), the spatial resolution in solar images is improved by frame selection and SAA. In order to overcome the burden of massive speckle data processing, we investigate the possibility of using the speckle reconstruction program in a real-time application at the telescope site. The code has been written in the C programming language and optimized for parallel processing in a multi-processor environment. We analyze the scalability of the code to identify possible bottlenecks, and we conclude that the presented code is capable of being run in real-time reconstruction applications at NVST and future large aperture solar telescopes if care is taken that the multi-processor environment has low latencies between the computation nodes.

Differential settlements in foundations under embankment load: Theoretical model and experimental verification

  • Wang, Changdan;Zhou, Shunhua;Wang, Binglong;Guo, Peijun;Su, Hui
    • Geomechanics and Engineering
    • /
    • v.8 no.2
    • /
    • pp.283-303
    • /
    • 2015
  • To research and analyze the differential settlements of foundations specifically, site investigations of existing railways and metro were firstly carried out. Then, the centrifugal test was used to observe differential settlements in different position between foundations on the basis of investigation. The theoretical model was established according to the stress diffusion method and Fourier method to establish an analytical solution of embankment differential settlement between different foundations. Finally, theoretical values and experimental values were analyzed comparatively. The research results show that both in horizontal and vertical directions, evident differential settlement exists in a limited area on both sides of the vertical interface between different foundations. The foundation with larger elastic modulus can transfer more additional stress and cause relatively less settlement. Differential settlement value decreases as the distance to vertical interface decreases. In the vertical direction of foundation, mass differential settlement also exists on both sides of the vertical interface and foundation with larger elastic modulus can transfer more additional stress. With the increase of relative modulus of different foundations, foundation with lower elastic modulus has larger settlement. Meanwhile, differential settlement is more obvious. The main error sources in theoretical and experimental values include: (a) different load form; (b) foundation characteristics differences; (c) modulus conversion; (d) effect of soil internal friction.

Removability and Stability Analysis Method of Rock Blocks Considering Discontinuity Persistence in Tunnel Constructions (터널시공에서의 불연속면의 연속성을 고려한 암반블럭의 거동성 및 안정성 해석기법)

  • Hwang, Jae-Yun;Ohnishi, Yuzo;Nishiyama, Satoshi
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.39-48
    • /
    • 2003
  • Previous analytical models for key blocks have been based on the assumption of infinite persistent discontinuities. In this paper, a key block analysis method considering the finite persistence of discontinuities is proposed as a stability evaluation method in tunnel constructions, and then applied to an actual example site. Three-dimensional rock block identification with consideration of the persistence of discontinuities is performed by using discontinuity disk model. The removability and stability analyses of rock blocks formed by the identification method are performed. The identification method can handle convex and concave shape blocks. In order to demonstrate the applicability of this developed numerical method to the stability evaluation in tunnel constructions, the analytical results are examined and compared one another.

Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card (균형성과표를 활용한 건설사업관리의 핵심성과지표 도출)

  • Lim, Wooseok;Jung, Jihyun;Lee, Hakki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.22-30
    • /
    • 2015
  • Enterprises should set up realizable goals and continually control the goals from apprehending whether they can be realized or not so that the enterprises grow consistently. Furthermore, from supplementing parts to be improved, goals are reset and the result should be controlled in order to fit to them. Lately, a lot of discussions about the results of organizations, projects, and companies are being realized in construction field. Particularly, in construction management, effective and professional control activities throughout the life cycle of facilities as well as the stage of business implementation of construction work are needed. About the result measurement of the construction management, lots of most domestic researches stay in the level of establishing basic concepts. Also, since characteristics of the construction field and the construction management were not reflected properly, it is in a situation that the result control system is not applied to on-site real works. Hence, this study intends to suggest fundamental data for measuring objective results from extracting result areas and key performance indicators of the construction management using Balanced Score Card.

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF