• 제목/요약/키워드: KSR-II

검색결과 73건 처리시간 0.026초

문화재 보호구역 주변 근접통과 구간의 철도노선 계획 사례 연구 (Research for the Railway Route Planning Adjacent the Protective Zone of Cultural Assets)

  • 노병국;김재복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2258-2270
    • /
    • 2008
  • After rapid running is begun in domestic, problem by the train wind that was not considered at existent train running appeared. If the High-Speed railway business speed rises by 350km/h in the future, is going to become more big issue. This study conducts an experiment that measure in local about KTX train beside Gyeongbu High-Speed railway track about aerodynamics effect that happen by passage of train and analyzed. In case KTX II runs with the 350km/h speed, forecasted effect that get in the simple vertical surfaces parallel to tracks according to distance from rail center. Compared construction size with structural analysis in case do not consider with case that consider the train wind about soundproofing walls representatively. As a result, proposed wind load standard that apply at soundproofing walls design.

  • PDF

미래지향적이고 발전적인 간선여객마케팅 실행방안 연구 (Study on the future-oriented and evolutive implementation plan to promote marketing on the passenger rail service)

  • 조기한;방창훈;김홍래
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.315-321
    • /
    • 2009
  • Since the KTX start its service on April 1st of 2004, KTX increased its share up to 17.4% (2008). It's the 2nd after the passenger car share of 59.2% in the national transportation, but the gap is still wide. In addition, because of the rise of goods' and oil price, the share of intercity express bus is growing up. Nevertheless Korail is trying to improve the train schedule and develop internodal transit system, the number of passengers of KTX is remain flat. KORAIL should start and proceed the tasks below. - Analysis of the 5 year's operation of KTX since the year of 2004 to make plans for the steady growth - development of the KTX operation plan for expansion of railway - preparing the operation of additional passenger rail services on the mail line for newly introduced trains. - expansion of KTX's service area after the introduction of KTX-II - introduction of other new trains - examination for the action plans to promote marketing in main-line including refinement of the rate structure

  • PDF

전동차 차륜의 반복 구름 접촉에 의한 피로균열 전파에 관한 연구 (A Study on Fatigue Crack Growth of an EMU Wheel due to Repeated Rolling Contacts)

  • 김호경;이덕규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.595-600
    • /
    • 2004
  • The EMU wheel is one of the most important component for the vehicle safety. For the tensile, fracture toughness and crack propagation tests, several specimens were collected from actual wheels. FEM ,analysis also was performed on the crack that was assumed to be 15 mm in depth under the wheel tread surface. The stress intensity factors $K_{I}$ and $K_{II}$ at the crack tip under the stress ($P_{max}$ = 911.5 MPa) due to a rolling contact were analyzed for crack growth characteristics. As a result, the perpendicular crack was found to be more dangerous compared to the parallel one.

  • PDF

전기철도에서의 고조파 발생과 계통응답특성(I) - 계통응답특성을 중심으로 - (Harmonic Generation and System Response Characteristics in Electrified Railway(I) - Focused on System Response Characteristics -)

  • 오광해;이장무
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.493-498
    • /
    • 2003
  • Harmonic current originating from electric locomotives can be magnified due to the impedance characteristics of power supply circuit and bring about various problems. That is, electromagnetic interference with communication lines, operational trouble in signaling, overheat and/or vibration in power capacitor, mis-operation in protection relay and so on. Therefore, the exact assessment of the harmonic current flow must be undertaken at design and planning stage for the electric traction systems. For these reasons, this study propose a new approach to model and to analyse traction power feeding system focused on system response to current and voltage harmonic(PART I ). Measurements of harmonics are also performed for railway power supply systems under normal operation. Spectrum and distortion analyses in measurement data are variously described in PART II

  • PDF

도시철도차량 화재 안전도 평가에 대한 연구(II) (화재시뮬레이션 평가 사례를 중심으로) (Fire simulation for the subway carriage to the replacement of interior materials)

  • 이덕희;김종훈;정우성;정용주;김운형;안치헌
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.207-212
    • /
    • 2006
  • In this study we conducted computer simulation with FDS V4.0.5 for the subway carriage of Seoul Metro to the replacement of interior materials. We tried to use the real data for the simulation by testing the interior materials in our Lab. From the result of the simulation we could confirm the fire resistance of the new interior replaced car to the chosen arson scenario case.

  • PDF

궤도틀림의 검측값과 측량결과 비교 (Comparison of Track Recording with Surveying in Track irregularity Measurement)

  • 이지하;최일윤;김박진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1090-1095
    • /
    • 2008
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies use moving chord method, which determine versine values via a chord. The versine is the vertical distance to curve measured in the middle of the chord. This type of method measures only versine of track irregularity curve by transfer function from the characteristics of measuring device. In this report, review the characteristics of two types of measuring tools by comparing the measurements. The one is GRP-1000 system, optical surveying system with Total station and lazar prism trolley. This calculates track geometry by surveying absolute coordinates of two points each on both rail heads. The other is EM-120, measures versine with 10m of symmetrical chord length.

  • PDF

암과 흙 혼합재료로 이루어진 철도노반의 열차 반복하중 작용에 의한 변형특성 (Deformation Characteristics of Crushed Rock-Soil Mixtures of Railway Subgrade under Train Cyclic Loadings)

  • 김대상;박성용;이용일;조국환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.955-963
    • /
    • 2008
  • There are lots of tunnel intervals in the KTX II stage construction line for the linearity of railway line passing mountain region. In order to use the rocks from tunnel excavations, railway subgrades are constructed with crushed rock-soil mixtures. In this study, plain strain test using large scale box was conducted in order to analyze the characteristics of deformation behavior of railway subgrades composed of crushed rock-soil mixtures. The effects of variation of degree of saturation, stress level of applied loadings, and number of loading cycles on the resilient and permanent deformation behavior were analyzed. The results show that degree of saturation have a great effect on the deformation behavior of crushed rock-soil mixtures. The axial strain ranges between $0.1{\sim}0.8%$ with variation of degree of saturation, in assumption that deviatoric stress applied on the subgrade by high-speed train load is 55kPa.

  • PDF

구매조건부 판토그라프 모델에 대한 성능 평가 (Evaluation of the Pantograph model for the High Speed Train)

  • 김기남;조용현;유병관;김상영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.372-379
    • /
    • 2008
  • In the case of pantograph, three models of HSR350X(G7), KTX-I and KTX-II have been already introduced into the field of domestic high speed train. This thesis intends to explain performance test result of the conditionally purchasing pantograph that is progressing up to now. The pantograph is being developed to localize pantograph that was applied to KTX-I. Also, it consider criteria that applied for verification of design contents and method of dynamic test that verify pantograph's current collecting performance.

  • PDF

TCN을 이용한 분산형고속열차 차세대 진단제어장치 개발에 대한 연구 (A Study on the TCN based Train Diagnostic and Control System of the HEMU)

  • 홍구선;박성호;신광균;신명준
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1618-1628
    • /
    • 2011
  • The Train Diagnostic and Control System(TDCS) has been equipped on the modern Metro Vehicle, Locomotive and High Speed Train. The main purpose of this system is to support the identification of train status by real-time, the fast action against such failure events during revenue service and the fast convenient maintenance processes. Some of newest TCMS, a kind of control and monitoring system, has participated in the main control functions such as pantograph up and down, powering and braking command and so on. But these kind of control functions of the high speed train which has the operating speed over 300km/h are conducted by the train electrical logic circuits. The KTX-I and KTX-II - the local high speed train, are the typical example. The next generation TDCS for the ongoing project of distributed high speed train(HEMU) is designing with the target to increase main train control functions, to increase the reliability/avalibility and to increase the convenient driving. This paper introduces the overall configurations and functions of the new generation TDCS.

  • PDF

고속철도 환경소음 예측 모델 고찰 (Review on Environment Noise Prediction Methods Emitted by High Speed Trains)

  • 조대승;정홍구;조준호;장강석;윤제원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2852-2859
    • /
    • 2011
  • Planning and construction of railway for high speed trains up to 400 km/h are recently driven in Korea. High speed train is one of the environment-friendly fastest mass transportation means but its noise generated by rolling, traction and aerodynamic mechanism can cause public complaints of residents nearby railways. To cost-effectively prevent the troublesome noise in a railway planning stage, the rational railway noise prediction method considering the characteristics of trains as well as railway structures should be required but it is difficult to find an authentic method for Korean high speed trains such as KTX and KTX-II. In this study, recent railway noise prediction methods developed by EU countries are introduced and discussed for consulting before setting the framework of our own railway noise prediction model emitted by Korean high speed trains over 250 km/h. Especially, the new Schall 03 model (2006) developed by Germany and IMAGINE model (2007) suggested by an EU framework research project are intensively reviewed. In addition, research items required for the development of our own model are suggested.

  • PDF