• Title/Summary/Keyword: KPX(Korea Power Exchange)

Search Result 66, Processing Time 0.034 seconds

The Introduction of KPX's Dispatcher training program (전력거래소의 급전원 훈련 프로그램 소개)

  • Choi, Seok-Min;Han, Hui-Cheon
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.243-245
    • /
    • 2005
  • During these 2-3 years, there were many big and small power system black-out including america-canada black out(2003.08). It is indicated that cause of accident is not only obsolete equipment but also dispatcher's improper reaction. therefore, it raised its head for the importance of dispatcher training. Korea power exchange(KPX) which is splitted fromKEPCO as part of reconstruction of power industry(2001.04), is in chagre of stable and efficient power system operation. also, KPX created 'dispatcher training team' which is benchmarked from foreign advanced Power corporation. In this paper, it will be introduced KPX's dispacher training program and various training procedure.

  • PDF

KPX's EMS Network Analysis Operation Status in Korea Power System (KPX의 한국 전력 계통에서 EMS 계통해석기능 활용실태 소개)

  • Kang, Hyung-Koo;Han, Hee-Cheon
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.30-34
    • /
    • 2005
  • Due to old Toshiba EMS's database size limit and hardware old aging, KPX(Korea Power Exchange) had introduced New EMS from AREVA(old ALSTOM) in July 2002. After then KPX had committed many man power and time to normalize EMS NA(Network Analysis) functions for using real power system. At initial stage, to normalize State Estimator which is the backbone of all other NA functions and DTS(Dispatcher Training Simulator}, KPX had corrected numerous topology errors, network model errors, non-scanned and wrongly scanned SCADA measured errors. After SE function study, running test and tuning, State Estimator could finally have been run properly and stably from June 2003. Based on SE running, KPX had normalized real time Contingency Analysis, and study mode Power Flow, STNET and DTS. From early 2004, dispatchers have been trained to use NA and DTS for the purpose of stable SE running, NA operation & results reading and urgent equipment outage reviewing. EMS NA have been greatly contributed to operate real time power system stably. Above NA normal operation by KPX own efforts under the no experience of NA running, KPX made a good precedent. This paper is intended to introduce EMS NA normalization process, operation status, and etc in Korea power system operation.

  • PDF

Application and Experience of State Estimation in Korea Power System (한국 전력 계통에서의 상태추정 알고리즘 적용)

  • Song, Tae-Yong;Song, Seuk-Ha;Rju, Hyun-Keun;Kang, Hyung-Ku;Kang, Bu-Il
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.89-91
    • /
    • 2003
  • 최근 들어 전력 계통은 점차 복잡해지고 계통 규모 역시 빠른 속도록 성장하고 있다. 이러한 환경 하에서 전력계통 운영을 담당하고 있는 한국전력거래소가 계통의 현 상태를 정확하게 파악하고 가능한 상정 고장에 대비하여 전력계통을 안정적으로 운영하는 것은 매우 중요하다고 할 수 있다. 이를 위해 기존의 스카다를 사용하여 계통의 상황을 파악하는 방법은 통신상의 잡음 및 측정값의 부정확성으로 인해 계통을 전체적으로 정확하게 파악하고 실시간 상정고장 분석과 같은 검토를 하는데 한계가 있다. 따라서 차세대 에너지 관리 시스템(NEMS)을 구축하는 단계에서 한국전력거래소는 상태추정 및 관련 응용프로그램을 실계통에 도입하여 전력 계통의 안정 운영에 기여하려 하고 있다. 상태추정이란 에러를 포함하고 있는 측정값과 네트워크 모델을 사용하여 현 계통의 전압, 위상각, 조류 둥의 실제 상태를 추정하는 방법으로 상태추정을 사용하여 현 상태 감시 및 실시간 상정고장 분석, 안전도 개선과 같은 기능을 수행할 수 있다. 본 논문에서는 차세대 EMS에 적용된 상태추정을 설명하고 실계통에 적용하여 파악한 상태추정의 기능을 보여주고 있다.

  • PDF

Estimation of Hardware Sizing in Korean EMS System (한국형 EMS 하드웨어 Sizing 산정에 관한 연구)

  • Lee, Won-Sang;Lee, Hyo-Sang;Yi, Myoung-Hee;Kim, In-Hyun;Lee, Bong-Gil;Choi, Jin-Woo;Yeo, Hyun-Gu
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.412-413
    • /
    • 2007
  • 정보시스템의 개발 및 유지보수에 대한 기준은 과기처 등에서 제정한 'S/W 개발비 산정기준'을 준용하고 있다. 그러나 본 기준이 Business Computing 환경을 기준으로 작성되었고, 전력계통 제어를 비롯한 각종 공정제어시스템 구축 환경에 부적합할 뿐 아니라 시스템의 뼈대(Frame)를 구성하는 H/W의 규모 산정이 누락되어 있는 상태이다. 전력거래소는 우리나라의 전력계통 환경에 적합한 한국형 에너지관리시스템(이하 K-EMS)의 국산화 개발을 각종 첨단 S/W의 탑재 기준에 따라 단계별(Baseline, Prototype, Fullscale)로 추진하면서, 각 단계에 가장 적합한 하드웨어의 용량 산정 기준을 선정하는 작업을 진행하고 있다. 이는 정보시스템 개발에서 자원의 낭비를 최소화하고 전체 개발비용을 절감 할 수 있다는 점에서 매우 중요하다. 본 연구에서는 K-EMS 시스템 국산화 개발을 위해 K-EMS가 수용할 각종 응용프로그램별 특성을 감안한 하드웨어의 적정 용량 산정 기준과 적용방안을 제시하고, CPU, Memory 등 세부 항목에 대한 고려항목을 언급함으로써 최적의 K-EMS 하드웨어 Sizing 산정방안을 소개하고자 한다.

  • PDF

KPX Operating Study Summer 2006 (2006년도 하절기 전력계통 운영방안)

  • Joo, Joon-Young;Bae, Joo-Cheon;Kim, Byoung-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.85-86
    • /
    • 2006
  • This Paper Presents a study for the Korea power system at yearly peak load time in 2006 summer period. The power system become more complex due to the gradual increment of power demand. We analyze the problems in power system operation, by the use of PSS/E(power flow, fault and transient stability study) and VSAT for voltage stability The results of establishment of power system operating plan and countermeasure are described.

  • PDF

KPX Operating Study Summer 2008 (2008년도 하절기 전력계통 구성방안)

  • Oh, Chang-Soo;Cho, Jong-Man;Song, Suk-Ha
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.282-283
    • /
    • 2008
  • This paper presents a overall study results for the Korea power system at yearly peak load time in 2008 summer period. The power system become more complex due to the gradual increase of power demand. We analyze the problems in power system operation, by the use of PSS/E(power flow, fault and transient stability study) and VSAT for voltage stability. The results of establishment of power system operating plan and countermeasure are described.

  • PDF

The Analysis of 2004 Summer Peak Load in Korea Power system (2004년 하계 첨두부하 시 계통운영 실적 분석)

  • Song, Tae-Yong;Hwang, Bong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.113-115
    • /
    • 2004
  • This year korea power system had recorded highest peak load for 6 times and finally it made new peak load 51,264MW at July 29th 3:00 PM. The new peak load is increased 8.2% from the last year peak load 47,385MW and korea power system entered 50,000MW load era. The Korea Power Exchange (KPX) snapped power system data at the peak load time using state estimation function in the EMS. And authors converted the power system data at peak load to PSS/E power flow format. Using this PSS/E peak load power flow data, this paper explains demand analysis result shun capacitor operation, voltage distribution at the peak load. And the paper shows the simulation result of 2 contingency analysis using the snapped PSS/E peak load data.

  • PDF

Presentation of EMS Real-Time VOLTAGE-VAR-DISPATCH Function & Practical Operating Plan (EMS 실시간 무효전력 최적화 기능 소개 및 활용 방안)

  • Kang, Bu-Il;Cho, Jong-Man;Shin, Yong-Son
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.416-417
    • /
    • 2007
  • With the benifit of telecommunication and IT technologies, Real-time Power system analysis having been gradually progressed. The power system become more complex due to the gradual increment of power demand. We analyze the problems in power system operation, by the use of PSS/E(power flow, fault and transient stability study) and VSAT for voltage stability. The results of establishment of power system operating plan and countermeasure are described.

  • PDF

Optimal AGC Control Parameter Tuning (자동발전제어(AGC) 최적튜닝에 관한 연구)

  • Oh, Chang-Soo;Song, Suk-Ha;Lee, Woon-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.321-322
    • /
    • 2008
  • Co-optimization of Gen. Speed Governor & AGC are essential to control proper Frequency control & Economic Dispatch. Improper AGC Control result in the decrease of Electricity frequency quality & Generator Life cycle by over-regulating each Generator. This paper presents a number of AGC Area/PLC parameter tuning technique & better performance results. This optimal tuning was studied & implemented by System Operation Dept Korea Power Exchange in 2007.

  • PDF

Use of Demand Resources in incumbent Electricity Market of Korea (현 전력시장에서 수요자원의 활용방안)

  • Kim, Doo-Jung;Jeon, Jae-Ryong;Moon, Young-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.820-821
    • /
    • 2007
  • '90년대 이후 세계의 전력산업은 효율성 향상 및 사회적 편익 증진을 위해 독점에서 경쟁체제로 전환되고 있다. 우리나라도 01. 4월 발전, 송배전 및 판매가 통합된 전력회사에서 발전부문을 분할하여 별도의 6개 발전회사로 분리했고, 전력거래소를 신설하여 변동비반영 전력시장을 개설하였다. 그러나 변동비반영 전력시장은 각 참여자들의 가격입찰을 허용하지 않고 있고, 수요측 가격입찰도 허용하지 않는 시장이다. 따라서 설비예비력, 운영예비력 등 예비력과 에너지 시장에서 수요자원의 참여가능성과 참여방법을 제시하고자 한다.

  • PDF