• 제목/요약/키워드: KEPCO System

검색결과 1,667건 처리시간 0.033초

우리나라 전력계통의 물리적 및 운영 측면에서의 공급 여유력 평가 (Physical and Operational Supply Margin Evaluation of KOREA Power System)

  • 권중지;정상헌;사박;트란트룽틴;최재석;차준민;윤용태
    • 전기학회논문지
    • /
    • 제56권1호
    • /
    • pp.18-27
    • /
    • 2007
  • Successful operation of power system under regulated as well as deregulated electricity markets is very important. This paper presents marginal power flow evaluation of KEPCO system in view point of physical and operation mode by using Physical and Operational Margins (POM Ver.2.2), which is developed by V&R Energy System Research. This paper introduces feature and operation mode of POM Ver.2.2 and then evaluates scenarios of 6 lines contingencies of 765kv of KEPCO system at peak load time on summer in 2006 you. The case study for actual 2006 year KEPCO system shows that this POM program is applicable sufficiently to KEPCO system. Futhermore, it demonstrates that it is helpful for operator's operating the system successfully by evaluating physical and operational margins quickly for various contingencies occurred in KEPCO system. Eventually, it will assist operators to operate more reliably the KEPCO system in future.

여자시스템 제어 및 진단기법 개발 (The Development of Control & Diagnostic Technique for Digital Excitation System)

  • 신만수;류호선;이주현;임익헌;김봉석;송성일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 D
    • /
    • pp.2597-2599
    • /
    • 2005
  • This research is developing the technique of troubleshooting in digital excitation system of nuclear power plant. and the design technique of excitation system is thought to be advanced through this research. Especially, the development of simulator enables to accumulate digital control technique, more analysis for excitation system algorithm. etc helps to develop other nuclear power plants.

  • PDF

전력계통 제어를 위한 변전소 AC/DC 겸용 비상전원에 관한 연구 (A study of AC/DC combined emergency source for power system control)

  • 전범배;이형한;김창곤;안보순;윤기섭;정종기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.135-138
    • /
    • 2005
  • This paper focuses on emergency source and control of substation against the consequence of power system breakdown or outage. the aim of the paper is to provide ideas and guidance concerning methods of using AC/DC combined emergency source for power system control to restore power system after unforseen events, such as outages caused by natural disaster. so the emergency source and lamp is very important for restoration control of substation after outage. therefore, this paper proposes countermeasure and method for security of substation emergency source and lamp which is restored at breakdown.

  • PDF

송전선 설계지원 SYSTEM의 구축 (Development a computer system to support the route selecting and surveying of a transmission line)

  • 정태호;김신철;이종수;김춘구;강희권;김정호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.831-833
    • /
    • 1998
  • It is getting more difficult to construct new transmission lines, due to the increase of people's demand resulting from the change of social environment and people's consciousness. In order to solve these complicated conditions. we developed a computer system to support the route selecting and surveying of a transmission line. This paper introdouces the methodology for route selecting, designing, surveying of a transmission line and tower designing process using a computer system.

  • PDF

지중 송전케이블 자산데이터의 자동 정제 알고리즘 개발연구 (Automatic Cleaning Algorithm of Asset Data for Transmission Cable)

  • Hwang, Jae-Sang;Mun, Sung-Duk;Kim, Tae-Joon;Kim, Kang-Sik
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.79-84
    • /
    • 2021
  • The fundamental element to be kept for big data analysis, artificial intelligence technologies and asset management system is a data quality, which could directly affect the entire system reliability. For this reason, the momentum of data cleaning works is recently increased and data cleaning methods have been investigating around the world. In the field of electric power, however, asset data cleaning methods have not been fully determined therefore, automatic cleaning algorithm of asset data for transmission cables has been studied in this paper. Cleaning algorithm is composed of missing data treatment and outlier data one. Rule-based and expert opinion based cleaning methods are converged and utilized for these dirty data.

기존 SCADA 시스템의 훈련용 시뮬레이터 개발 (Development of SCADA Simulator for Power System Operator)

  • 최성수;우희곤;서중석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.522-524
    • /
    • 1993
  • This paper discusses the training simulator designed to improve the skills of operators who handle the SCADA System of KEPCO (Korea Electric Power Co. ). The system is composed of the simulation subsystem and database, and implemented on the 380-based P. C. It is 1 inked to existing SCADA system (HARRIS and TADCOM) to work realistically for the situation of accidents and corresponding actions.

  • PDF

KEPCO SYSTEM의 송전계통 신뢰도평가(경인,영동지역) (Reliability Evaluation of Transmission Network of the KEPCO System(Kyongin and Yougdong Area))

  • 문승필;김홍식;왕재명;이철휴;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.34-37
    • /
    • 2001
  • This paper evaluate reliability indices of a part of transmission network of KEPCO system. Quantitative evaluation of transmission system reliability is very important because successful operation of an electric power system in the deregulated electricity market depends on transmission system reliability management. Monte Carlo methods are often preferable, when complex operating conditions are involved and/or the number of sever events is relatively large. Monte Carlo simulation methods and CMELDC(CoMposite power system Effective Load Duration Curve) were used in this paper.

  • PDF

실용적 접근 기반의 전력계통 해석 프로그램 상정고장, 해소방안 자동화 기법: 휴전검토 자동화 툴 개발 (A Study on Methodology for Automated Contingency and Remedial Action Analysis based on Practical Approach: Development of Automated Scheduled Outage Analysis Tool)

  • 송지영;고백경;신정훈;한상욱;남수철;이재걸;김태균
    • 전기학회논문지
    • /
    • 제63권9호
    • /
    • pp.1171-1179
    • /
    • 2014
  • ISO(Independent System Operator) or TSO(Transmission System Operator) use power system analysis program to simulate contingency analysis and remedial actions to operate power system stably. Generally, power system analysis program provides automated analysis functions(or modules) to deal with wide area power system. However, because of missed contingency cases, automated contingency analysis has no practical use or has limitation. And in case of remedial action, it doesn't support automated function or takes a lot of times to study, because of simulation in manual for each cases. This paper suggests that new relation with buses and transmission line properties of power system DB used for power system analysis program to simulate automated contingency including all contingency cases needed in the field without missed cases. And it proposes automated remedial action scheme based on practical approach analysis to alleviate overloading or voltage problems. Finally it deals with automated contingency/remedial action analysis(automated scheduled outage) program which is developed by KEPCO and its performance and proposed schemes are proven by case study for real Korean power system data.

송변전설비 전력영향평가 시스템 개발 (Development of electric power effect estimation system of Transmission Line & Substation)

  • 백승도;김태영;민병욱;김왕주;최진성;김신철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.444-445
    • /
    • 2006
  • The proposed site selection for transmission system construction is applied by KEPCO's regulation of the site selection criteria and it is confirmed through the deliberation of site selection committee and talking with local authority, by means of study on Present status and site survey, to verify impediment of national land use and development plan. Therefore, it is true that KEPCO has difficulty in timely completion of power facility construction because of civil appeals due to insufficiently evaluate resistance factor of stakeholder and stubborn resistance of inhabitants. This paper describes the PEES(power effect estimation system) which contributed to timely completion of transmission system construction to solve the above difficulty by utilizing IT(Information Technology) such as GIS(Geographic Information System) and LiDAR for the proposed site section. PIES evaluates project impacts on commencement of construction and finds out counter measures then makes public construction information after prediction and analysis of stakeholder's resistance factor.

  • PDF

원격검침 설비의 네트워크 상태감시를 위한 SNMP 기반의 저압 AMI 망관리시스템 개발 (Development of AMI NMS (Network Management System) using SNMP for Network Monitoring of Meter Reading Devices)

  • 김영일;박소정;김영준;정남준;최문석;박병석
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권2호
    • /
    • pp.259-268
    • /
    • 2016
  • 한국전력공사는 200년부터 저압 고객에 대한 AMI (Advanced Metering Infrastructure) 기반의 검침시스템을 구축하여 운영하고 있다. 한전의 AMI 검침시스템은 현재 255만호에 설치되어 운영되고 있으며 2020년까지 2200만호를 설치하여 운영할 예정이다. 본 연구에서는 원활한 AMI 검침망 운영을 위해 DCU (Data Concentration Unit) 및 모뎀에 대한 네트워크 동작상태를 감시할 수 있는 AMI 망관리시스템을 개발하였다. AMI 망관리시스템은 네트워크 장비에 대한 속성 데이터 및 네트워크 토플로지 정보, 통신성능 정보, 장애정보 등을 수집하고, 데이터 분석을 통해 장애내역을 생성하며, 원격에서 장비를 제어하는 등의 기능을 제공하고 있다. AMI 망관리시스템은 전력선 통신망에서 네트워크 장비에 대한 약 370여개의 MIB (Management Information Base) 정보를 SNMP (Simple Network Management Protocol)를 이용하여 수집과 제어를 수행하고 있다. 본 논문에서는 AMI 망관리시스템에 대한 주요 기능과 설계내용, 구현된 서비스 화면을 소개하고자 한다.