• Title/Summary/Keyword: KEPCO Power System

Search Result 1,269, Processing Time 0.033 seconds

A study of communication-based protection coordination for networked distribution system (네트워크 배전계통용 통신기반 보호협조에 관한 연구)

  • Kim, WooHyun;Chae, WooKyu;Hwang, SungWook;Lee, HakJu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.43-48
    • /
    • 2022
  • Although the distribution system has been structured as complicated as a mesh in the past, the connection points for each line are always kept open, so that it is operated as a radial distribution system (RDS). For RDS, the line utilization rate is determined according to the maximum load on the line, and the utilization rate is usually kept low. In addition, when a fault occurs in the RDS, a power outage of about 3 to 5 minutes occurs until the fault section is separated, and the healthy section is transferred to another line. To improve the disadvantages of the RDS, research on the construction of a networked distribution system (NDS) that linking multiple lines is in progress. Compared to the RDS, the NDS has advantages such as increased facility utilization, load leveling, self-healing, increased capacity connected to distributed generator, and resolution of terminal voltage drop. However, when a fault occurs in the network distribution system, fault current can flow in from all connected lines, and the direction of fault current varies depending on the fault point, so a high-precision fault current direction determination method and high-speed communication are required. Therefore, in this paper, we propose an accurate fault current direction determination method by comparing the peak value polarity of the fault current in the event of a fault, and a communication-based protection coordination method using this method.

Analysis on Solid Insulator Flashover Characteristics on Moisture Contamination for Electrical Insulation Improvement of ESS (ESS 안전성 개선을 위한 결로 운전 조건 고려 고체절연물 연면 절연파괴특성 분석)

  • Kim, Jin-Tae;Lee, Seung-Yong;Kim, Ji-young;Seok, Bok Yeol
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.317-321
    • /
    • 2021
  • As the large-scale renewable energy power plant increases, the high-capacity and compact Energy Storage System (ESS) is required. However, this trend could reduce the insulation reliability of ESS. In this study, the surface flashover characteristics for four types of solid insulators are investigated in the uniform electric field with AC and Lightning Impulse (LI) voltage waveforms under various contamination levels. In addtion, insulator surfaces are compared based on the contact angle before and after surface flashover. The experimental results show that AC flashover voltage is dependent on the materials and the contamination level, but LI flashover voltage is only associated with the contamination level. Especially, AC flashover voltage of PC (PolyCarbonate) is higher than that of other insulators, which is associated with the unique and sequential creepage discharge propagation pattern of PC. The localized discharges on the surface of PC form corresponding tracking points. Then, the interconnected trackings result in the complete flashover. This flashover patterns degrade the surface of PC much more than that of epoxy and Bulk Molding Compoud (BMC). Thus, the contact angle of PC is significantly reduced compared to that of other insulators. The increased hydrophilicity in the surface of PC enhances the insulator surface conductivity.

Development of electric power effect estimation system of Transmission Line & Substation (송변전설비 전력영향평가 시스템 개발)

  • Baik, Seung-Do;Kim, Tai-Young;Min, Byeong-Wook;Kim, Wang-Joo;Choi, Jin-Sung;Kim, Shin-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.444-445
    • /
    • 2006
  • The proposed site selection for transmission system construction is applied by KEPCO's regulation of the site selection criteria and it is confirmed through the deliberation of site selection committee and talking with local authority, by means of study on Present status and site survey, to verify impediment of national land use and development plan. Therefore, it is true that KEPCO has difficulty in timely completion of power facility construction because of civil appeals due to insufficiently evaluate resistance factor of stakeholder and stubborn resistance of inhabitants. This paper describes the PEES(power effect estimation system) which contributed to timely completion of transmission system construction to solve the above difficulty by utilizing IT(Information Technology) such as GIS(Geographic Information System) and LiDAR for the proposed site section. PIES evaluates project impacts on commencement of construction and finds out counter measures then makes public construction information after prediction and analysis of stakeholder's resistance factor.

  • PDF

Functional Properties of Stand-alone Microgrid EMS Application (에너지 자립섬 EMS 어플리케이션의 기능적 특성)

  • Lee, Ha-Lim;Chun, Yeong-Han;Chae, Wookyu;Park, Jungsung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.115-119
    • /
    • 2016
  • For many past years, research in the operation of stand-alone Microgrid, which provides electric power generated from renewable energy sources and energy storage system instead of diesel generators, has been a major issue in order to prepare the exhaustion of fossil fuel and to protect environment, in island grids. Samso Island, known as the world's first stand-alone Microgrid in Denmark, is connected to the mainland grid through AC system, which has different technical conditions with Korea's isolated power system. Korea's first stand-alone Microgrid has been built in Ga-sa island, Chun-la-nam-do, based on Energy Management System (EMS) operation, and other islands are under construction to follow the next step. These stand-alone Microgrid's has large capacity of Battery Energy Storage System (BESS) and the proportion of the renewable energy sources are large, which makes it necessary to use a Microgrid-Energy Management System (MG-EMS) to operate the grid effectively and economically. However, since the main subject of MG-EMS is different from EMS, specific characteristics and functions must be different as well. In this paper, the necessary characteristics and functions are explained for a general MG-EMS compared to a large power system EMS.

Development of Low Voltage AMI(Advanced Metering Infrastructure) System using PLC (PLC를 이용한 저압 AMI(Advanced Metering Infrastructure) 시스템 구축)

  • Jung, Joon-Hong;Kim, Sung-Man;Jung, Su-Mi;Kim, Kwang-Young;Kim, Hong-San
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.743-744
    • /
    • 2011
  • Currently, the major issue in power system is construction of smart grid. Unlike conventional electricity grids, smart grid allows two-way communication between electricity suppliers and consumers, as well as enabling more dispersed generation and storage of power. The AMI(advanced metering infrastructure) system is the core technology of smart grid and this paper deals with the design methodology of AMI System using PLC(power line communication) networks.

  • PDF

Introducing the Latest 3GPP Specifications and their Potential for Future AMI Applications

  • Koumadi, Koudjo M.;Park, Byong-seok;Myoung, Nogil
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.245-251
    • /
    • 2016
  • Despite the exponential throughput improvement in mobile communications systems, their ability to satisfy requirements of state-of-the-art and future applications of advanced metering infrastructure (AMI) is still under investigation. Challenges are mainly due to the inadequacy of third generation partnership project (3GPP) networks to support large amounts of devices simultaneously, while the number of AMI end-devices and the frequency of their data transmission increase with new AMI-based applications. In this introductory survey, innovative and future AMI applications and their communication requirements are first reviewed. Then, we identify challenges of 3GPP long term evolution (LTE) in enabling future AMI applications. More importantly, the latest improvements to LTE-A standard release 12 and 13 are reviewed and analyzed with regards to their potential to improve the quality of LTE-enabled AMI. It is found that 3GPP enhancements on machine type communications (MTC) standards will significantly enhance AMI communications. Beyond MTC specifications, non-MTC-specific enhancements such as carrier aggregation and multi-connectivity for user equipment will also contribute greatly to improving reliability and availability of AMI devices. The paper's focus is towards improved backhaul support for innovative and future AMI applications, beyond traditional automatic meter reading.

Reactive Power Capability Verification Strategy (발전기 무효전력 성능시험 절차서 정립)

  • Shin, Man-Su;Lee, Ju-Hyun;Lim, Ick-Heon;Ryu, Ho-Seon;Shin, Jung-Seon;Byun, Seong-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.87-88
    • /
    • 2006
  • Generator has responded quickly with variation of power system voltage and is controlled at real time. As a reactive power source, generator is revalued better than power condenser and as a reactive power sink, is revalued. But Domestic generators scarcely have been tested and operated to reactive power capability. In case of power system fault, operators wouldn't quickly take a follow-up measures about reactive power disturbance. Therefore generator reactive power capability verification strategy must be developed, several generators is tested as a exhibition since 2004. This paper is extract from the test contents.

  • PDF

The Improvement of NGR for Power Transformer Open Circuit Protection (전력용변압기 단선 보호용 NGR 성능 개선)

  • Kang, Y.W.;Shim, E.B.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11d
    • /
    • pp.83-88
    • /
    • 2004
  • As the electric system is getting larger to meet the increasing demand for electric power, the rating of power apparatus is becoming inevitably higher in its working voltage and larger in its capacity. According to KEPCO reports, power transformers in the KEPCO system have undergone troubles such as winding short insulation breakdowns every year since 1981. the cause of this troubles were high one line grounding fault currents in KEPCO systems that had direct grounding systems. KEPCO has installed the NGR(neutral grounding reactor) to lower this fault current and reduced winding short insulation breakdowns in power transformers. But when a circuit breaker opened a no load bus, some trips of circuit breakers for protecting transformer have occurred by mal-operation of 59GT(overvoltage ground relay) that detect disconnection of NGR. Therefore, in this paper, we analyzed the cause and examined the effect of time delav circuit to prevent wrong operation of 59GT.

  • PDF

Analysis on Insulation and Protection Characteristics of Grid Connected ESS in Ground/Short-Circuit Fault (지/단락실증시험에서 MW급 계통연계형 ESS 절연/보호시스템 성능 분석에 관한 연구)

  • Kim, Jin-Tae;Lee, Seung-Yong;Park, Sang-Jin;Cha, Han-Ju;Kim, Soo-Yeol
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.2
    • /
    • pp.119-122
    • /
    • 2020
  • With recent ESS (Energy Storage System) fire accident, the fault protection performance is becoming more important. However, there has never been any experiments with the protection performance on the faults in the ESS system level. In this study, the effect of AC ground fault and IGBT (Insulated Gate Bipolar mode Transistor) short-circuit failure on MW class ESS was performed experimentally for the first time in the world. First of all, the effect of the AC single line ground fault on battery was analyzed. Moreover, the transient voltage was investigated as a function of the battery capacity and the power level. Finally, the breaking capability and insulation performance of ESS were examined under PCS short-circuit fault condition. Through the tests, it was found that ESS protection system safely blocked the faulty current regardless of the faults, whereas the electronic parts such as IGBT and MC (Magnetic Contactor) were broken by the fault current. Also, the electrical breakdown in ESS resulted from the transient voltage during the protection process.

The practical operating evaluation of the grid connected PV power system (계통연계형 태양광발전시스템의 실증운전 평가)

  • Kim, Eui-Hwan;Ahn, Kyo-Sang;Lim, Hee-Chun
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.5
    • /
    • pp.72-77
    • /
    • 2008
  • The purpose of this paper is to explain the real characteristics of generation system of large scale power system of high voltage the grid connected PV power system for electricity industry. Main system is made up PCS in the class 150kVA. and we studied commercial operation in Korea-Western Power Company,(Tae-An headquarter) with the capacity of module is 122.5 $kW_p$. On the average, power plant utilities' utilization is 12.71 percent and consumption rate is 6.66 percent. We operated normally since 25th, August 2005 without any other problems.