• Title/Summary/Keyword: Job flow improvement

Search Result 15, Processing Time 0.028 seconds

Case Study on Job Flow Improvement of Foodservice at a University Hospital (대학병원 급식업무 개선 사례 연구)

  • Kim, Hyung Mi;Yang, Il Sun;Park, Eun Cheol;Lim, Hyun Sook
    • Quality Improvement in Health Care
    • /
    • v.7 no.2
    • /
    • pp.244-261
    • /
    • 2000
  • Background : In order to cope with changes in the management environment at hospitals, increased interests are drawn in patient foodservice system on Continuous Quality Improvement Activity as the method of approaching a quality food service and effective management. Thus, as a part of this activity, this study was conducted to evaluate job flow improvement that was already performed and the results of that process at the dietetic department of a university hospital, focusing on improving management. Method : On February 15 of 1998. the dietetic department formed a job flow-improvement to decide on the priority of job flow improvement, and prepared specific action strategies and schedule of the priority: after a 5 month process period, job improvement achieved on June 15. 1998. Also, economic achievement of the task was evaluated through labor productivity analysis and cost-benefit analysis. Results : The patient food service system which was managed decentralized at the present hospital was centralized, some steps of the food service process were integrated, and quality of patient food was improved. Also, as a solution of the problems expected when conducting job flow improvement was made on food service equipments and utensils. The result of evaluating the job flow improvement that labor productivity improved by 18.2% compared to before the improvement and the result of the analysis of cost-benefit showed that Benefit-Cost (B/C) ratio was 2.22. showing financial merit on the investment. Conclusions : Continuous Quality Improvement Activity needs to be initiated and conducted in the future in various areas of hospital foodservice system in order to actively adopt to ever changing hospital management environment. In order to achieve this goal, many researches and more efforts need to be put in by people in charge of hospital food service management, and interests and support are needed from hospital policy makers.

  • PDF

The Relationship Between Job Stress and Teaching Flow of Early Childhood Teachers : The Mediating Effect of Early Childhood Teachers' Resilience (유아교사의 직무스트레스와 교수몰입의 관계 : 내적·외적 회복탄력성의 매개효과)

  • Kim, Sung Hee;Ahn, Hyo Jin
    • Journal of Families and Better Life
    • /
    • v.34 no.4
    • /
    • pp.37-49
    • /
    • 2016
  • The purpose of this study was to examine the mediating effect of inner resilience and external resilience on the relationship between the job stress of early childhood education teachers and their teaching flow. Data were collected through questionnaires from 221 early childhood Korean teachers in the InCheon area. The instruments used in this study were the Kindergarten Teachers' Job Stress Scale, Early Childhood Teachers' Resilience Scale, and Teaching Flow Scale. The data were analyzed by Pearson's correlation analysis, multiple regression analysis, and Baron and Kenny's method. It was adapted to SPSS ver. 18.0 for Windows. This study followed a mediated effect model. First, there was a negative correlation between the job stress and teaching flow. There was a positive correlation between the teaching flow and the resilience. Secondly, there was a negative correlation with job stress and teaching flow in path model 1. In path model 2, there was a positive correlation with resilience and teaching flow. Teaching flow was statistically and significantly influenced by resilience. Thirdly, there was the mediating effect of inner resilience and external resilience on the relationship between the job stress of early childhood education teachers and their teaching flow. These results can be used as the basic data for the improvement of early childhood education teachers' teaching flow in the future.

Material Handling System Improvement Analysis Applying Simulation Technique (시뮬레이션 기법(技法)을 이용한 물류(物流) 시스템 개선(改善)에 관한 연구(硏究))

  • Shin, Hyeon-Pio;Park, Sung-Yeon;Lee, Hwa-Ki
    • IE interfaces
    • /
    • v.5 no.1
    • /
    • pp.35-46
    • /
    • 1992
  • This paper deals with analysis of material handling system efficiency of a heat-exchanger manufacturing line. This line is a typical flow shop type assembly line which consists of 10 steps of assembly stations. Each station have one or two workers who assemble and move components for the job, and no special transporters for component's movement. Therfore, all the workers are involoved in unnecessary moving activities which decrease overall production efficiencies of the line. To improve productivities, production outputs and worker's job performances for this assembly line, the several alternatives are considered such as installing new conveyor lines and automatic guided vehicle(AGV) system. Analyzing economic feasibilities and responses of the system alternatives, an experimental simulation model is built suing SIMAN Ver. 3. 5 simulation language with CINEMA package for animation of the process flow. Through this animation process a vivid picturial analysis could performed on the process flow.

  • PDF

Minimizing Total Flow Time for Multiple Parts and Assembly Flow Shop (복수의 부품 및 조립 흐름공정의 총흐름시간 최소화)

  • Moon, Gee-Ju;Lee, Jae-Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.82-88
    • /
    • 2011
  • A typical job sequencing problem is studied in this research to improve productivities in manufacturing companies. The problem consists of two-stage parts and assembly processes. Two parts are provided independently each other and then two sequential assembly processes are followed. A new heuristic is developed to solve the new type of sequencing problem. Initial solution is developed in the first stage and then the initial solution is improved in the second stage. In the first stage, a longer part manufacturing time for each job is selected between two, and then a sequence is determined by descending order of the times. This initial sequence is compared with Johnson's sequence obtained from 2-machine assembly times. Any mismatches are tried to switch as one possible alternative and completion time is calculated to determine whether to accept the new sequence or not to replace the current sequence. Searching process stops if no more improvement can be made.

A Constrained Single Machine Scheduling Model with Earliness/Tardiness and Flow Time Measures

  • Joo, Un-Gi;Sung, Chang-Sup
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.115-130
    • /
    • 1995
  • This paper considers a single machine nonpreemptive scheduling problem with a given common due date. In the problem, the optimal job sequence is sought to minimize the sum of earliness/tardiness and flow time measures in the situation where all jobs are available at time zero, and weights per unit length of earliness/tardiness and flow time are V and W, respectively. Some dominant solution properties are characterized to deriva both an optimal starting time for an arbitrary sequence and sequence improvement rules. The optimal schedule is found to the case W .geq. V/. By the way, it is difficult to find the optimal schedule for the case W < V. Therefore, the derived properties are put on together to construct a heuristic solution algorithm for the case W < V, and its effectiveness is rated at the mean relative error of about 3% on randomly generated numerical problems.

  • PDF

A Study on Productivity Improvement through Safety Management and Manufacturing Process Reengineering : Case Study in Polyurethane Manufacturer (안전관리 및 생산 공정 개선을 통한 생산성 향상에 관한 연구 : 폴리우레탄 제조업체 사례)

  • Kim, Hyun Soo;Lee, Hyeong-Ryong;Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.185-196
    • /
    • 2013
  • Polyurethane is an elastomer polymer, which is flexible, tough and resistant. This material is widely used various fields such as automobile, aeroplane, textiles, construction industries. Currently there exists more than 1,000 manufacturing companies in Korea that are closely related to Polyurethane. In spite of a number of Polyurethane manufacturing companies, there are little attention in academia as well as industries to study the safety and manufacturing process improvement on Polyurethane. In this paper, we consider a case study for the Polyurethane manufacturer to improve productivity by using safety management and manufacturing process reengineering. After careful analysis, we derive three enhancements to increasing the safety and productivity for the target company. Especially, we achieve about 16% productivity improvement in roller manufacturing process by replacing manual stirring job with automated mixing machine.

Job Analysis for Role Identification of Clinical Nurses with Expanded Role - Clinical Nurse with Education and Clinical Nurse with Coordination - (진료협력간호사의 역할규명을 위한 직무분석 - 교육상담간호사와 진료코디네이터간호사 중심 -)

  • Sung, Young Hee;Lim, Nan Young;Park, Kwang Ok;Jung, Jung Hee;Kwon, In Gak;Kim, Ul Soon;Hwang, Moon Sook
    • Journal of Korean Clinical Nursing Research
    • /
    • v.15 no.2
    • /
    • pp.139-155
    • /
    • 2009
  • Purpose: The purpose of this study was to identify role through job analysis (duties and tasks) of nurses who work as clinical nurses with education and clinical nurse with patient coordination within the hospital. Methods: The DACUM committee was organized with 8 nurses each, clinical nurses with education and clinical nurses with coordination. The committee derived the duties and tasks of the two groups of clinical nurses from their actual work in the hospital through a DACUM workshop. Validity of the derived duties and tasks was tested by 12 nurses at each of 3 hospital. Results: For clinical nurse with education, 8 duties and 45 tasks were identified, which included patient education and consultation, patient advocacy, management of the therapeutic process, direct nursing care, activities work directed at improvement, management of health promotion events, administration work, and self-improvement. For clinical nurse with coordination, 10 duties and 54 tasks were identified, and included client consultation, client education, direct nursing care, coordination of therapeutic flow, employee education, public relations with the community, planning and operation of meetings, administration work, work directed at improvement, and self-improvement. Conclusion: The results of this study contribute to not only the work of the participants but also basic data for human resource management in the hospital.

Efficient Message Scheduling for WDM Optical Networks with Minimizing Flow Time

  • Huang, Xiaohong;Ma, Maode
    • Journal of Communications and Networks
    • /
    • v.6 no.2
    • /
    • pp.147-155
    • /
    • 2004
  • In this paper, we propose an efficient sequencing technique, namely minimum Row time scheduling (MFTS), to manage variable-Iength message transmissions for single-hop passive starcoupled WDM optical networks. By considering not only the message length but also the state of the receivers and the tuning latency, the proposed protocol can reduce the average delay of the network greatly. This paper also introduces a new channel assignment technique latency minimizing scheduling (LMS), which aims to reduce the scheduling latency. We evaluate the proposed algorithm, using extensive discrete-event simulations, by comparing its performance with shortest job first (SJF) algorithm. We find that significant improvement in average delay could be achieved by MFTS algorithm. By combining the proposed message sequencing technique with the channel selection technique, the performance of the optical network could be further improved.

A study on the improvement of work flow and productivity in complex manufacturing line by employing the effective process control methods (복잡한 생산라인에서 효율적 공정관리 기법 도입에 따른 공정흐름 및 생산성 개선 연구)

  • Park, Kyungmin;Jeong, Sukjae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.305-315
    • /
    • 2016
  • Due to the change from small volume production to small quantity batch production systems, individual companies have been attempting to produce a wide range of operating strategies, maximize their productivity, and minimize their WIP level by operating with the proper cycle time to defend their market share. In particular, using a complex workflow and process sequence in the manufacturing line has some drawbacks when it comes to designing the production strategy by applying analytical models, such as mathematical models and queueing theory. For this purpose, this paper uses three heuristic algorithms to solve the job release problem at the bottleneck workstation, product mix problem in multi-purpose machine(s), and batch size and sequence in batch machine(s). To verify the effectiveness of the proposed methods, a simulation analysis was performed. The experimental results demonstrated that the combined application of the proposed methods showed positive effects on the reduction of the cycle time and WIP level, and improvement of the throughput.

A Case Study on Improvement of Field Training Coursework for Engineering Education - Comparison Korea with France (한국과 프랑스의 현장 실습 중심의 공학 교육 운영에 관한 사례 분석)

  • Kim, Hyeon-A;Hong, Chol-Ho;Kim, Byeong-Sam
    • Journal of Engineering Education Research
    • /
    • v.10 no.2
    • /
    • pp.5-18
    • /
    • 2007
  • This paper presents a concept of training coursework for engineers in cooperation with the industry combining system, comparing Korea with France. The students, after first two years in a university for the foundation/basic courses, will be centered in the industry, rather than at an academic institution, where field training engineering coursework will be offered in structured or capstone design(problem based learning) formats through the industry. This study on the improvement of the concept has several advantages including the followings ; 1) Industry hiring local-area students who have the potential to be long-term employees; 2) Industry's immediate access to employees with developing engineering skills; 3) On-the-job training reduced industry training costs after graduation; 4) More effective learning through observing complex operations; 5) Students and industry input for continuous improvement of the curriculum; 6) Greater amenability on the part of industry to actively participate in research and development; 7) Increasing in the flow of real research problems for engineering. Finally, the implications for student quality, accreditation, assessment of partnership, academic freedom, and fundraising for scholarships and researches are discussed briefly.