• Title/Summary/Keyword: Job Sequencing

Search Result 43, Processing Time 0.027 seconds

A study on sequencing of Mixed Model Assembly Line for increasing productivity (혼합모델조립라인의 생산성 제고를 위한 작업순서 결정)

  • 최종열
    • Korean Management Science Review
    • /
    • v.13 no.2
    • /
    • pp.25-48
    • /
    • 1996
  • Mixed Model Assembly Lines (MMALs) are increasingly used to produce differentiated products on a single assembly line without work-in-process storage, Usually, a typical MMAL consists of a number of (1) stations doing exactly the same operation on every job, (2) stations involving operations with different choices, and (3) stations offering operations that are not performed on every job, or that are performed on every job but with many options. For stations of the first type there is no sequencing problem at all. However, for the second type a set-up cost is incurred each time the operation switches from one choice to another. At the third type of stations, different models, requring different amounts and choices of assembly work, creates an uneven flow of work along the line and variations in the work load at these stations. When a subsequence of jobs requires more work load than the station can handle, it is necessary to help the operations at the station or to complete the work elsewhere. Therefore, a schedule which minimize the sum of set-up cost and utility work cost is desired. So this study has developed Fixed Random Ordering Rule (FROR), Fixed Ascending Ordering Rule (FAOR), Fixed Descending Ordering Rule, and Extended NHR (ENHR). ENHR is to choose optimal color ordering of each batch with NHR, and to decide job sequence of the batch with it, too. As the result of experiments, ENHR was the best heuristic algorithm. NHR is a new heuristic rule in which only the minimum addition of violations from both partial sequence and unassigned sequence at every branch could be considered. And this is a heuristic sequencing rule for the third type of stations at MMAL. This study developed one more heuristic algorithm to test the performance of NHR, which is named as Practical Heuristic Rule (PHR).

  • PDF

Simulation for Flexibility of Flexible Job Shop Scheduling (유연 Job Shop 일정계획의 유연성에 대한 시뮬레이션)

  • Kim, Sang-Cheon;Kim, Jung-Ja;Lee, Sang-Wan;Lee, Sung-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.4 no.3
    • /
    • pp.281-287
    • /
    • 2001
  • Traditional job shop scheduling is supposed that machine has a fixed processing job type. But actually the machine has a highly utilization or long processing time is occurred delay. Therefore product system is difficult to respond quickly to the change of products or loads or machine failure etc. Here we use flexible job shop which is supposed that a machine has several jobs by tool change. The heuristic for the flexible job shop scheduling has to solve two problems. One is a routing problem which is determine a machine to process job. The other is sequencing problem which is determine processing sequence. The approach to solve two problems arc a hierarchical approach which is determined routing and then schedule, and a concurrence approach which is solved concurrently two problems by considering routing when it is scheduled. In this study, we simulate for flexibility efficiency fo flexible job shop scheduling with machine failure using hierarchical approach.

  • PDF

Group Technology를 이용한 부품 가공시점의 결정

  • 전태준;유철수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.220-221
    • /
    • 1990
  • The objective of this study is to determine a near-optimal time schedule for processing necessary jobs in order to minimize total elapsed time. The fundamental assumptions are that jobs to be processed are classified into several groups and jobs within the same group are processed in succession in the flow-type GT line. A heuristic method by V. A. Petrov is applied to determine the job sequencing. In consideration of production quantity, group sequences and job sequences for each group are determined and the start time of processing for each job is calculated by computer.

  • PDF

A Sequencing Considering Delivery and Machine Idle time in Production System with Buffer Constrained (버퍼용량제한이 있는 생산시스템에서 납기와 기계유휴시간을 고려한 Sequencing)

  • Kim, Jung
    • Journal of Industrial Convergence
    • /
    • v.3 no.1
    • /
    • pp.19-31
    • /
    • 2005
  • This paper deals with the sequencing problem in the operation of the manufacturing systems with the constraint of buffer capacity. Some of studies for this theme have been progressed for several years. And then most of them considered only one objective, such as maximum lateness, machine utilization, makespan, mean flowtime and so on. This study deal with two objectives of the delivery for customers and the idle time of machines for producers. For the decision of sequence, the utility function is used. The developed heuristic algorithm presents a good solution. Through a numerical example, the procedures of the job sequencing is explained.

  • PDF

Job sequencing decision in flow shop using revised Multi-Criteria Decision Making Method (수정된 다기준 의사결정을 이용한 흐름방식에서의 작업순서 결정)

  • 안춘수;강태건;정상윤;홍성일
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.135-151
    • /
    • 1997
  • In this paper, we propose a simple and relatively efficient heuristic method to determine job sequencing in the flow-shop considering multiple criteria such as processing time, due date and cost. The proposed method is applicable to the flow- shop where the jobs are released simultaneously and their processing sequence is predetermined and not changed until the whole jobs are processed. To develop this method, we mixed and modified some well-known multi-attribute decision heuristics such as the simple linear weighting scheme, the lexicographic rule and the 'elimination by aspect' rule. Some computer simulations were conducted to test the efficiency of the proposed method and it has been compared with the SWPT (Shortest Working Processing Time) rule and EDD (Earliest Due Date) rule. The results show that our method is as effective as the traditional ones in terms of mean flow time, tardiness, makespan, cycle time, machine utilization, etc., and proved to be much simpler and more flexible to be used in real situations.

  • PDF

Constraint Description language and Automatic Code Generator for Single-Machine Job Sequencing Problems (단일기계 일정계획을 위한 제약조건 표현언어 및 코드 자동생성기)

  • Lee, You-K.;Baek, Seon-D.;Bae, Sung-M.;Jun, Chi-H.;Chang, Soo-Y.;Choi, In-J.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.2
    • /
    • pp.209-229
    • /
    • 1996
  • Scheduling problems which determine the sequence of jobs are one of the Important issues to many industries. This paper deals with a single-machine job sequencing problem which has complex constraints and an objective function. To solve the problem, an expressive constraint description language and an automatic code generator are developed for our scheduling system. The user just needs to describe the scheduling problem using the constraint description language that allows to express both quantitative and qualitative constraints as well as an objective function in real world semantics. Then, a complete scheduling program based on constraint satisfaction technique is automatically generated through the code generator. Advantage of this approach is that models of the scheduling problems are easily developed and maintained because models ore formulated by using the language which reflects real world semantics.

  • PDF

Application of Candidate Order Approach for Solving Job Sequencing Problem with Finish Date Constraint (완료 시간 제약이 있는 작업 순서 결정 문제 풀이를 위한 후보 순위 접근법 응용)

  • Kim, Jun Woo
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2018.07a
    • /
    • pp.421-422
    • /
    • 2018
  • 작업 순서 결정 문제의 목표는 다양한 작업들에 대한 최적의 처리 순서를 결정하여 총 처리시간이나 납기 지연과 관련된 지표들을 최소화하는 것이다. 나아가, 실제 생산 현장에서는 작업 처리 순서를 결정할 때, 긴급도나 고객과의 관계 등과 같은 요인을 고려하여 일부 작업들을 특정 시간 내에 완료해야 할 수 있으며, 이 같은 제약 조건을 완료 시간 제약이라 한다. 본 논문에서는 완료 시간 제약을 갖는 작업 순서 결정 문제의 개념과 특성에 대해 살펴보고, 이러한 문제를 풀이하기 위한 알고리즘 개발에 후보 순위 접근법을 적용할 것을 제안한다.

  • PDF

A Job Sequencing Model for Cold Coil Production Processes (냉연 공정에서의 작업단위 편성)

  • Jun, C.H.;Lee, S.M.;Park, C.S.;Kang, S.Y.;Chang, S.Y.;Choi, I.J.;Kang, J.T.
    • IE interfaces
    • /
    • v.6 no.2
    • /
    • pp.117-131
    • /
    • 1993
  • A job sequencing model is developed and its computer system is tested for processing cold-rolled coils in Tandem Cold Mills(TCM) at the Pohang Iron and Steel Company. Given coils waiting to be processed, this system generates a sequence of jobs satisfying operational constraints for the TCM process. We formulate the problem as a constraint satisfaction problem and employ the backtracking technique combined with looking ahead features in order to generate a feasible solution within a reasonable time. Our system is implemented in C language on 80486-based IBM PC. Some tests based on the real data show that our system is adequate with respect to search time and that it consistantly generates a good feasible solution.

  • PDF

A Study on Scheduling Considering Delivery and Production Efficiency in the JIT Systems (적시생산시스템에서 납기와 생산효율성을 고려한 Scheduling)

  • Kim, Jung
    • Journal of Industrial Convergence
    • /
    • v.5 no.2
    • /
    • pp.21-32
    • /
    • 2007
  • This paper deals with the sequencing problem in the operation of the manufacturing systems with the constraint of buffer capacity. Some of studies for this theme have been progressed for several years. And then most of them considered only one objective, such as maximum lateness, machine utilization, makespan, mean flowtime and so on. This study deal with two objectives of the delivery for customers and the idle time of machines for producers. For the decision of sequence, the utility function is used. The developed heuristic algorithm presents a good solution. Through a numerical example, the procedures of the job sequencing is explained.

  • PDF