• Title/Summary/Keyword: Jet ventilation system

Search Result 57, Processing Time 0.023 seconds

An Experimental Study Improving Ventilation of Container Ship Hold Using Horizontal Upward Jet Duct (수평 상향 분사 덕트를 이용한 컨테이너선 화물창 환기 개선에 대한 실험적 연구)

  • Park, Il-Seouk;Park, Sang-Min;Ha, Ji-Soo
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.2 s.146
    • /
    • pp.236-245
    • /
    • 2006
  • The ventilation performance for the various venting duct arrays has been experimentally compared in the scaled model of the container hold. Most container ships have the ventilation duct system to remove effectively the condensing heat released from container refrigerator. The existing duct system is vertically installed and basically has the number of duct as many as the columns of reefer container stack. In this study, to make up for the weak points having stagnantly hot legions in the centered area of container hold for the present system, the horizontal upward jotting duct system was proposed and proved by temperature rising tests on the scaled model. In this paper, the expected flow regimes and the thermal and hydrodynamic analogies as well as the measured temperature distributions in a hold for various duct types and heat released rates are deeply discussed.

A Tunnel Ventilation Control Algorithm by Using CO Density Prediction Algorithm (일산화탄소 농도 예측 기능을 사용한 터널 환기 제어 알고리즘)

  • Han Doyoung;Yoon Jinwon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.16 no.11
    • /
    • pp.1035-1043
    • /
    • 2004
  • For a long road tunnel, a tunnel ventilation system may be used in order to reduce the pollution level below the required level. To control the tunnel pollution level, a closed loop control algorithm may be used. The feedforward prediction algorithm and the cascade control algorithm were developed to regulate the CO level in a tunnel. The feedforward prediction algorithm composed of the traffic estimation algorithm and the CO density prediction algorithm, and the cascade control algorithm composed of the jet fan control algorithm and the air velocity setpoint algorithm. The verification of control algorithms was carried out by dynamic models developed from the actual tunnel data. The simulation results showed that control algorithms developed for this study were effective for the control of the tunnel ventilation system.

A NUMERICAL STUDY OF THE VENTILATION AND FIRE SIMULATION IN A ROAD TUNNEL (도로터널 환기/제연 시스템 시뮬레이션)

  • Park Jong-Tack;Won Chan-Shik;Hur Nahmkeon;Cha Cheol-Hyun
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2005.10a
    • /
    • pp.207-212
    • /
    • 2005
  • In designing a ventilation system of a road tunnel, a possibility of using the system as a smoke control system in case of a tunnel fire has to be considered. In the present study, a numerical simulation on ventilation system is performed considering jet fan operations and moving traffic. A fire-mode operation by reversing some fan operations in case of a tunnel fire is also simulated. The results show that ventilation operation can control the pollutants effectively, and fire-mode operation can control smoke and temperature effectively to prevent a disaster.

  • PDF

A Study on the Safety Improvement by CFD Analysis for Packaged Type Hydrogen Refueling System (CFD 툴을 활용한 패키지형 수소충전시스템의 안전성 향상 연구)

  • HWANG, SOON-IL;KANG, SEUNG-KYU;HUH, YUN-SIL
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.30 no.3
    • /
    • pp.243-250
    • /
    • 2019
  • In this study, to ensure the safety of the packaged hydrogen refueling system, the improvement plan was derived by using 3-dimensional CFD program (FLACS). We also confirmed the effectiveness of risk reduction and the suitability of safety standard. By ventilation performance evaluation according to the position of the vent, it demonstrated that the vent should be installed at the ceiling to safely ventilate without stagnation of the leaked gas. In case of ventilation system according to KGS standard, risk situation could be resolved after about 5 minutes in the worst leaked condition. The result showed that jet fire and explosion inside the packaged system could affect the surrounding facilities. This proves that the standard for installing flame detectors, emergency shut down system and protection wall is appropriate.

Optimization of the Unducted Auxiliary Ventilation for Large-Opening Underground Limestone Mines (대단면 지하 석회석 광산내 무풍관 국부통기 최적화 연구)

  • Nguyen, Van Duc;Lee, Chang Woo
    • Tunnel and Underground Space
    • /
    • v.29 no.6
    • /
    • pp.480-507
    • /
    • 2019
  • This paper aims at optimizing the auxiliary ventilation system in large-opening limestone mines with unducted fans. An extensive CFD and also site study were carried out for optimization at the blind entries. The fan location, operating mode, and layout are the parameters for optimization. Since the jet stream discharged from the auxiliary fan is flowing faster than 15 m/s in most of the cases, the stream collides with floor, sides or roof and even with the jet stream generated from the other fan placed upstream. Then, it is likely to lose a large portion of its inertial force and then its ventilation efficiency drops considerably. Therefore, the optimal fan installation interval is defined in this study as an interval that maximizes the uninterrupted flowing distance of the jet stream, while the cross-sectional installation location can be optimized to minimize the energy loss due to possible collision with the entry sides. Consequently, the optimization of the fan location will improve ventilation efficiency and subsequently the energy cost. A number of different three-dimensional computational domains representing a full-scale underground space were developed for the CFD study. The velocity profiles and the CO concentrations were studied to design and optimize the auxiliary ventilation system without duct and at the same time mine site experiments were carried out for comparison purposes. The ultimate goal is to optimize the auxiliary ventilation system without tubing to provide a reliable, low-cost and efficient solution to maintain the clean and safe work environment in local large-opening underground limestone mines.

A Numerical Study for the Design of Ventilation System for the gaseous Pollutants (기체 유해물질 환기장치 설계를 위한 수치모사)

  • 엄태인
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.4
    • /
    • pp.77-84
    • /
    • 1994
  • A study is performed in order to design a effective ventilation equipment for the pollutants in workshop. The procedure has been used to calculate the flow in a confined rectangular space channel. A cross free stream is flowed from open space and jet stream including pollutants is injected from bottom area. Calculation results shows a wake region which exists immediarely downstream of the jet discharge and are compared with the experimental data. Calculation data are in good agreement with experimental results. A wake plays an important role on a stagnation of the pollutants. Thus ventilation equipment has to be designed without a stagnation region which give rise to concentration stratification. In this study, calculation parameters are the position and velocity of pollutants and fresh air from cross free stream. It is concluded that more measurements of local velocities, temperatures and concentrations of the pollutants.

  • PDF

Energy and Air Quality Benefits of DCV with Wireless Sensor Network in Underground Parking Lots

  • Cho, Hong-Jae;Jeong, Jae-Weon
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.2
    • /
    • pp.155-165
    • /
    • 2014
  • This study measured and compared the variation of ventilation rate and fan energy consumption according to various control strategies after installing wireless sensor-based pilot ventilation system in order to verify the applicability of demand-controlled ventilation (DCV) strategy that was efficient ventilation control strategy for underground parking lot. The underground parking lot pilot ventilation system controlled the ventilation rate by directly or indirectly tracking the traffic load in real-time after sensing data, using vehicle detection sensors and carbon monoxide (CO) and carbon dioxide ($CO_2$) sensor. The ventilation system has operated for 9 hours per a day. It responded real-time data every 10 minutes, providing ventilation rate in conformance with the input traffic load or contaminant level at that time. A ventilation rate of pilot ventilation system can be controlled at 8 levels. The reason is that a ventilation unit consists of 8 high-speed nozzle jet fans. This study proposed vehicle detection sensor based demand-controlled ventilation (VDS-DCV) strategy that would accurately trace direct traffic load and CO sensor based demand-controlled ventilation (CO-DCV) strategy that would indirectly estimate traffic load through the concentration of contaminants. In order to apply DCV strategy based on real-time traffic load, the minimum required ventilation rate per a single vehicle was applied. It was derived through the design ventilation rate and total parking capacity in the underground parking lot. This is because current ventilation standard established per unit floor area or unit volume of the space made it difficult to apply DCV strategy according to the real-time variation of traffic load. According to the results in this study, two DCV strategies in the underground parking lot are considered to be a good alternative approach that satisfies both energy saving and healthy indoor environment in comparison with the conventional control strategies.

An Operation Methed for Longitudinal Flow Ventilation System in a Road Tunnel (도로터널에서 종류식 환기 시설의 운전 방안)

  • Kim, T.H.;Hwang, I.J.;Hong, D.H.;Chung, J.S.;Chung, J.K.
    • Proceedings of the KSME Conference
    • /
    • 2001.06b
    • /
    • pp.87-92
    • /
    • 2001
  • In automobile highway tunnels, in order to maintain a suitable environment for drivers and traffic, visibility in the tunnel must be maintained, and the concentrations of poisonous substances including carbon monoxide must be kept at or below allowable levels. For this reason, in long tunnels and tunnels with heavy traffic, ventilation facilities are installed. When the ventilation facilities are run at full capacity, the environment in the tunnel is obviously adequately maintained, but this consumes a great deal of electric power. Consequently, a central problem in highway tunnel ventilation control systems is to keep the pollution concentration at or below the allowable level, and thus provide a safe environment for traffic, while consuming as little electricity as possible. This paper introduces an operation method of longitudinal flow ventilation systems with jet-fan, dust collector and vertical ducts.

  • PDF

A Study on Jet Fan Start Time in Medium-Length Tunnel Fires (중규모터널 방재용 제트팬 초기 가동시간에 관한 연구)

  • Kim, Doo-Young;Lee, Chang-Woo
    • Tunnel and Underground Space
    • /
    • v.20 no.6
    • /
    • pp.465-474
    • /
    • 2010
  • Although the number of medium-length road tunnels, less than 1 km in length, has increased recently more than 30 percent each year, their ventilation and fire safety system design guidelines have not been established yet. The guidelines for long tunnel design are adopted even for the medium-length road tunnels. Therefore the necessity is brought up to optimize the ventilation and fire safety systems based on their own design guidelines. This study aims at determining the optimal start time of jet fan in case of 20 MW fires by analyzing smoke backlayering range, temperature distribution, range of poor visibility, evacuation time and critical velocity. The CFD study results are expected to contribute to propose the optimal fan operation mode.