• Title/Summary/Keyword: JIT System

Search Result 151, Processing Time 0.026 seconds

시설배치문제의 의사결정지원 시스템 - 그래프이론의 접근

  • 이호준
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1989.10a
    • /
    • pp.77-85
    • /
    • 1989
  • The purpose of this research entails the study of the multicriteria graph-theoretic Facility Layout Problem(FLP), the development of a Decision Support System(DSS), and a sensitivity analysis for graph Theoretic heuristics. The graph theoretic FLP Decision Support System gives decision makers or planners more information as a guide in producing their final layouts. This information is provided by a variety of final result scores, so called upper bound values, based on different options and different criteria. The increased information provided will give decision makers more confidence in design a block plan. One case is presented to demonstrate the applicability of the system to real-world problem. Finally, applicabilities of the DSS to other format layouts, such as GT layout and JIT's U-line, are briefly mentioned.

  • PDF

The Study on Applying Incentive System for Just in Time Delivery (JIT 자재 조달을 위한 인센티브제도 적용에 관한 연구)

  • 정종식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.52
    • /
    • pp.21-31
    • /
    • 1999
  • This paper considers how to structure the incentive system between a buy and a single supplier of raw materials when early shipments are forbidden. And this paper is used to take the supplier's behavior into account in the buyer's choice of incentives. Combinations of two types of incentives that the buyer might offer are considered : (1) a fixed value incentive and (2) an incentive that decreases in value as time elapses. Given a desired probability of on time delivery, optimal incentives are found by specifying indifference curves for on time delivery and assessing the expected total cost of incentive schemes along that curve. Difficulties of using incentive to achieve 100% on time delivery are considered and two example flow time distributions are presented.

  • PDF

A Study of Trials on Material Integration Pool System for Logistics Rationalization - Basing on the Improvement a precedent about Logistics System of 'A' Enterprise - (물류혁신을 위한 자재통합공동물류 시행에 관한 연구(A사 물류시스템 개선사례를 중심으로))

  • Won, You-Jon;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.373-383
    • /
    • 2006
  • Logistics is one of the most important factors to manage a stream of materials in economic environment. Establishing effective logistics system needs to consider some constraints which are fluctuation of materials volume, a long distance between makers and consumers, one way logistics and small quantity batch production. It is estimated that Unit Load System should be a powerful method to cope with those problems. It helps to realize the key issues which are Standardization and Logistics Pool System The Material Unification of Logistics System is able to participate in all kinds of industries including manufacturing, distribution and logistics. This system has some merits which are a long distance transportation cost down, product recovery, and treatment in the unbalance of demand and supply caused by unstable materials volume. Four strategies of Material Logistics Model are Packing Rationalization, Logistics Pool System, JIT System application and establishing effective infrastructure. The Material Unification Of Logistics System based on Unit Load System achieves efficiency of logistics and largely decreases moving cost.

  • PDF

An Integrated Multi-Product Inventory Model for a Two-Echelon Supply Chain under Cap-and-Trade Mechanism (배출권거래제 하에서 2단계 공급사슬에서 다품목의 통합재고모형)

  • Kim, Dae-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.61-68
    • /
    • 2019
  • Currently many companies are interested in reduction of the carbon emissions associated with their supply chain activities such as transportation and operations. Operational decisions, such as modifications in order quantities could an effective way in reducing carbon emissions in the supply chain. Cap-and-trade regulation, sometimes called emissions trading, is a market-based tool to limit greenhouse gas emissions. Under cap-and-trade regulation, emission credits are allocated to the firms and the firms trades emissions under cap-and-trade schemes. In this paper, we propose a single-manufacturer single-buyer two-echelon supply chain problem under the cap-and-trade mechanism incorporating the carbon emissions caused by transportation and warehousing activities where a single manufacturer produces a family of items in order to deliver a family of items to a single buyer at a fixed interval of time for effective implementation of Just-In-Time (JIT) Purchasing. An integrated multi-product lot-splitting model of facilitating multiple shipments in small lots between buyer and manufacturer is developed in a JIT Purchasing environment. Also, an iterative heuristic algorithm is developed to derive the common order interval, the number of intervals for each product and the number of shipments between the buyer and the manufacturer during the common interval. A numerical example is given to illustrate the savings in reduction of total cost and carbon emissions by the inventory model incorporating cap-and-trade mechanism compared to the classical inventory model. The proposed inventory model could be useful for the practical solution of two-echelon supply chain inventory problem under cap-and-trade mechanism.

Analysis of Data Transfer Overhead Among Memory Regions in Java Program (자바 프로그램에서 메모리 영역 간 자료 이동에 따른 부담 분석)

  • Yang, Hee-Jae
    • Journal of KIISE:Software and Applications
    • /
    • v.35 no.5
    • /
    • pp.281-287
    • /
    • 2008
  • Data transfers occur during the execution time of a Java program, from constant to variable, from variable to other variable and so on. Data are located in memory and hence data transfer requires access to memory. As memory access generates both time delay and energy consumption it is absolutely necessary to know the data transfer overheads incurred among different paths not only to write an efficient program but also to build a high-performance Java virtual machine. In this paper we classify Java memory into three different regions, constant, local variable, and field, and then investigate data transfer overheads among these regions. The result says that the transfer between local variables incur the least overhead usually, while the transfer between fields incur the most. The difference of overheads reaches up to a double. Optimization techniques like JIT reduces the data transfer overhead dramatically. It is observed that the overhead is reduced from 14 to 27 times for the case of Hotspot JVM.

Global 환경에서의 EDI를 활용한 공급자 재고 관리(Supplier Managed Inventory)System 구축전략

  • 배승호;최정문;김인수;이충화
    • Proceedings of the CALSEC Conference
    • /
    • 1998.10a
    • /
    • pp.247-254
    • /
    • 1998
  • 국내/외 제조업체 또는 유통업체가 경쟁력 있는 제품의 생산/판매를 위해 최적의 부품 및 제품을 최단 시간내, 최저 가격으로 조달하기 위한 Global sourcing체계 구축과 그에 따른 재고부담을 회피하면서 제품을 소비자에게 신속히 전달하려는 공급선관리 (Supply Chain Management : SCM)의 의지가 높아지고 있다. 이에 따라 제조업체나 유통업체가 자체 재고 및 관리부담을 감소시키기 위해 JIT(Just In Time)체계의 업무형태를 도입하고 있고 부품 및 제품을 공급하는 공급자에게 제조업체의 재고를 관리하게 하는 형태인 이른바 공급자 재고관리(Supplier Managed Inventory: SMI)가 공급업체에게 요구되고 있다. 또한 최근 국내 제조업의 생산기반이 급속히 해외이전 됨에 따라 해리 생산거점과 국내본사, 주문자에 이르는 전 과정에 걸친 물류 및 정보전달 체계를 확보해야 하는 상황에서 공급업체는 주문업체로부터 주문한 내용의 진행상황과 자동적인 재고의 판단 및 보충에 이르는 전 과정의 프로세스 관리 및 관련 정보제공을 요구 받고있다. 이와 같은 환경에 대응하기 위해 본 발표에는 공급자 재고관리의 정의 및 Global business 환경에서 EDI를 통한 System의 구축방안 및 고려사항을 제시하고자 한다.

  • PDF

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

A Study on the Improvement of Order-Picking Operation in S-Automobile Parts Distribution Center (S-자동차 부품 물류센터에서 오더픽킹 작업능력 향상을 위한 연구)

  • Park, Jung-Hyun;Park, Yang-Byung
    • IE interfaces
    • /
    • v.17 no.4
    • /
    • pp.450-458
    • /
    • 2004
  • S-Distribution Center supplies parts to three plants of K-automobile manufacturing company. Since the three plants employ the JIT production system, it is important for S-Distribution Center to deliver small quantities of parts frequently and quickly on time. This paper presents a case study on the improvement of order-picking operation in S-Distribution Center. The study is focused on the reductions of move time and waiting time by redesigning the parts storage location, picking-order terminal location, retrieval policy, and equipment operation policy. The proposed operation system for S-Distribution Center is evaluated through a simple computation analysis and computer simulation. Furthermore, the reducible numbers of equipment and order pickers are investigated by performing a sensitivity analysis.

Sequencing for Mixed-model Assembly Lines Considering Part Supplier in Just-in-time Production Systems (JIT생산시스템에서 부품공급업자를 고려한 혼합조립순서결정에 관한 연구)

  • 남궁석;이상용
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.1-16
    • /
    • 1997
  • This paper improves the autonomy for supplier's schedule and the flexibility of the final assembly line. The final assembly line is a single work station and each product taking different assembly time is considered. In the assembly schedule, the heuristic method based on the goal chasing method is used. Consequently, suppliers can independently determine their output rates and thus, change their workload pattern according to their needs and priorities. Moreover, this flexibility can help to avoid expensive final-assembly-line stoppages in case of sudden part supply disruptions. The sequencing method can be easily implemented into an existing just-in-time system. In addition, the mathematical model was formulated and the algorithm was explained through the flow chart. The numerical example was given and the efficiency of this method is shown through the analysis of computational results of that example.

  • PDF

Due Date Determination on the MSD Problem with a Common Due Date Window (공통의 납기 구간을 가지는 MSD 문제에서의 납기 결정)

  • Han, Tae-Chang;Kim, Chae-Bogk;Lee, Dong-Hoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.1-9
    • /
    • 2008
  • JIT 생산시스템이 세계적으로 많은 회사에 적용됨에 따라 earliness와 tardiness의 페널티를 동시에 최소화하는 문제에 대한 많은 연구가 진행되어 왔다. 이 연구에서는 한정된 완료시간의 편차에 대해서는 페널티를 부과하지 않는, 즉 허용오차가 존재할 때, 공통의 납기로부터 평균제곱편차(MSD : Mean Squared Deviation)를 최소화하는 단일기계 문제를 다룬다. 허용오차가 존재하는 MSD 문제에서 최적의 공통 납기를 결정하는 방법을 개발한다. 스케줄과 허용 오차가 주어질 때, 최적의 납기를 찾는 두 개의 선형시간이 소요되는 알고리즘을 제시한다. 주어진 허용오차 중 하나는 가장 짧은 가공시간을 가지는 작업의 절반보다 작은 경우이며 다른 하나는 허용오차가 임의인 경우이다.