• Title/Summary/Keyword: JIT 시스템

Search Result 110, Processing Time 0.085 seconds

Design of Integration Process for JIT System in Construction Schedule Management (건설 공정관리에서의 적시생산을 위한 통합 프로세스 설계)

  • Jin You-Na;Lee Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.517-520
    • /
    • 2003
  • Recently there is a used a word-outsourcing-in the corporation circumstance. Continuous recession impelling with IMF permitted restructuring measures downsizing unnecessary organization and offered opportunity to breakup structure of 'High cost and Low efficiency' -inefficient and uneconomic production method- in our corporation. Due to the effect of such circumstance change, the construction industry have already introduced and implemented outsourcing in many parts. For successful outsourcing in the construction industry, a mutually close relations and the cooperation are preceded and JIT system is needed to improve these relations. The study recognizes the importance and proportion that outsourcing is occupyed in the construction industry, and suggests the method to improve the productivity by evaluating the factors and usefulness for JIT system to apply to the construction industry.

  • PDF

Design of Integration Process for JIT System in Construction Schedule Management (건설 공정관리에서의 적시생산을 위한 통합 프로세스 설계)

  • Jin You-Na;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.117-125
    • /
    • 2004
  • Recently, the word 'outsourcing' is used frequently in the corporation circumstance. Continuous recession with IMF caused restructuring measures which made unnecessary organization be downsized, and offered opportunity to breakup structure of $^{\circ}A$EHigh cost and Low efficiency, which is inefficient and uneconomic production method' in our corporation. Due to the effect of such circumstance change, the construction industry have already introduced and implemented outsourcing in many parts. For successful outsourcing in the construction industry, close relation and mutual cooperation should be preceded and JIT system is needed to improve the relation. In this study, the importance and proportion in which outsourcing is occupied in the construction industry are recognized, and the method for improving the productivity is suggested through evaluating the factors and usefulness of JIT system which can be applied to the construction industry.

A Study On D-Shortage Control Hyper System Using MRP and JIT (MRP와 JIT를 융합한 D-결품관리 시스템에 관한 연구)

  • 조동수;이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.15 no.25
    • /
    • pp.63-74
    • /
    • 1992
  • This study proposes D- shortage control system which is a convenient tool for cooperative companies to reduce shortages which frequently break out between the manufacturing companies and the cooperative companies. On the ground of theoretical analysis of MRP and JIT system, D- shortage control system sets up a schedule that secures the delivery date by precedent scheduling( D-) comparing with MRP It also syncronizes business, production and release, and builds the pull system comparing with JIT. The factors causing shotages are the scheduling absurdity and the controlling absurdity. The scheduling absurdity can be settled by the calculating required quantity method of MRP and the controlling absurdity can be settled by daily control of business, production and pruchasing fuctions by the pull system of JIT. And the inventory and the WIP can be reduced by the operating of PULL system and by the settlement of D- shortage control practices. The Application of D- shortage control system, therefore, enables the rationalization of logistics and reduces the inventory And it leads to the reinforced competitiveness and the security of subsistence of manufacturer by the cost ruduction, the reduction of financial difficulty, and the insurance of the delivery date.

  • PDF

A Study on the Evaluation of JIT Operational Techniques in the Domestic Industries -Using Compatibility in the AHP- (국내기업에서의 JIT 운용기법 중요성 평가에 관한 연구 -Compatibility를 이용한 AHP를 중심으로-)

  • 구일섭;임익성;김태성
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.241-251
    • /
    • 1998
  • The purpose of this study is to evaluate the relative importance of seven JIT operational techniques in Domestic industries. These techniques are used to improve manufacturing effectiveness and efficiency such as : Setup time reduction, Kanban, Multi-functional worker, U type layout, Andon(line stop), Atonomation, and Smoothing production. The new analytic hierarchy process(AHP) model is used in order to evaluate the relative importance of the seven JIT operational techniques which are used to increase the manufacturing effectiveness and efficiency. To aggregate the multi-divisions priorities, in this paper, we suggest a way which decision maker can exclude outlier matrix from group by using the concept of the compatibility in AHP.

  • PDF

Direct Just-in-time Methods for Nonlinear Control Design

  • Qiubao Zheng;Kim, Hidenori ura
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.93.4-93
    • /
    • 2001
  • Based on input and output data pairs of nonlinear systems, this paper proposes a simple and effective Just-In-Time (JIT) method, called Direct JIT Control, for nonlinear control design. It uses an inverse model of controlled plant to compute an initial control action, and then adapts the initial control action by adding a fine-tuning control action, depended on the errors between the real outputs and the expected reference signals. Meanwhile, the proposed JIT method accomplishes the adaptation of the inverse model just simply by means of the refreshment of input and output data pairs. In addition, the JIT modeling technique guarantees this method to obtain an approximate inverse model of the controlled nonlinear plant in the neighborhood of a query. Based on a ...

  • PDF

Solution of the Drum-Buffer-Rope Constraint Scheduling Problems incorporated by MRP/JIT - (MRP와 JIT에 부합하는 DBR 제약일정계획문제 해법)

  • 김진규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.21-36
    • /
    • 2000
  • The drum-buffer-rope(DBR) system is a finite scheduling mechanism that balances the flow of the production system. DBR controls the flow of materials through the plant in order to produce products in accordance with market demand, with a minimum of manufacturing lead time, inventory, and operating expenses. This paper integrates the best of MRP push system and JIT pull system with DBR system, efficiently adapts these logics to capacity constraint resources, and contributes to the evolution of synchronous manufacturing. The purpose of this paper is, thus, threefold. The first objective is to identify the frame of theory of constraints(TOC) and the logic of DBR scheduling. The second objective is to formulate the DBR constraint scheduling problems(DBRCSP) in a job shop environments. Finally, the paper is to suggest the solution procedure of DBRCSP for embedding TOC into MRP/JIT along with an numerical expression. In addition, illustrative numerical example is given.

  • PDF

A Case Study on the Process Improvement Using JIT Concept in a Company (제조업체에 있어서 JIT 개념을 활용한 공정개선 사례연구)

  • 권병우;이동형;김진수;임준묵
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.55
    • /
    • pp.43-50
    • /
    • 2000
  • Recently, the companies can't avoid the change toward the jobbing production from mass production because manufacturing types are changed from manufacturing-oriented to customer-oriented for the security of competitive power among the related companies. The jobbing production system usually has such problems as low productivity, high unit cost, much stocks, long manufacturing time and one-sided decision of delivery date compared with the mass production. In order to settle these problems in the jobbing production system, we introduced the JIT production system including 3 regulations & 6S activities and Kanban system etc. The effective operation of JIT production system makes the processes efficiently and reduces the unneeded stocks and maximizes the revenue of company.

  • PDF

AN ORDERING MODEL TO DETERMINE PRODUCTION QUANTITY IN JUST-IN-TIME PRODUCTION SYSTEM (JIT 생산시스템에서의 발주량 결정을 위한 모델 설계)

  • Ahn, Beum-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.2
    • /
    • pp.251-256
    • /
    • 2006
  • In this paper we consider multi-stage, multi-product production, inventory systems which have assembly-tree-structure. We propose a new mathematical model for pull type ordering systems based on JIT manufacturing systems. To apply the model to an actual automobile parts manufacturer, the objective of proposed model is to minimize the sum of inventory and setup costs. Finally, a numerical example and computational results are given to illustrate the proposed model.

  • PDF

An Integrated Inventory Model for a Single Product and its Raw Materials in Just-In-Time Purchasing (JIT구매 하에서의 단일제품의 통합재고모형에 관한 연구)

  • 김대홍
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.3
    • /
    • pp.50-57
    • /
    • 2003
  • In this paper, we consider an integrated inventory system where a single supplier purchases and processes raw materials in order to deliver finished goods to a single buyer for effective implementation of Just-In-Time purchasing. An integrated JIT lot-splitting model of facilitating multiple shipments in small lots is developed in a JIT purchasing environment. Also, an iterative solution procedure is developed to find the order quantity for the finished goods and raw materials, and the number of shipments between buyer and supplier. We show by example that the integrated policy adopted by both buyer and supplier in a cooperative manner can provide them a greater economic benefit than seeking the local optimal inventory policy independently.