Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.
To decide a reasonable investment priority of public enterprises, it is required to have an efficient evaluation standard. However, without having a standard, a budget for those enterprises has been allocated. In this research, for the efficient and reasonable budget allocation, it is discussed how to decide investment priority of information and communication enterprises of the government. In order to examine possible alternatives of the investment priority of information and communication enterprises of the government, seventeen enterprises were chosen from the enterprises of Ministry of Information and Communication. Public benefit, economic benefit, technology, politics, and step-up increase of budget were set up as evaluation standards and 16 specific standards were set up as subordinates. A hierarchical decision model was designed and analyzed by using AHP.
This paper proposes the novel investment priority decision method for distribution facilities considering the potential failure rate and the influence of customer caused by faults in distribution networks. The Proposed method decides the investment priority of the facilities combining, by the fuzzy rules, the KEPCO's priority decision for investment and the priority decision considering SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index). To verify the performance of the proposed method, these works utilized the projects for weak facility reinforcement planned in KEPCO in the Busan region in 2003 and 2004. The evaluation results showed that the reliability of the KEPCO in the Busan region using the proposed method can be enhanced more than using the conventional KEPCO's method.
Proceedings of the Korean Geotechical Society Conference
/
2000.03b
/
pp.411-418
/
2000
With the limited amount of budget and time, it is required to determine the priority of investment when there are a large number of hazardous slopes. In this paper, the Rock Slope Risk Rating System is developed based on the combination of the hazard of failure and the damage potential. By applying the proposed rating system to 253 rock slopes in Korean National Highway, it was possible to determine the priority of investment on road cut slopes.
As workplace incidents has been being declining in Korea, there is criticism of the effectiveness of occupational safety policy implementation. It is unknown that which policy target group needs to be targeted to yield effective injuries prevention. The purpose of this paper is to analyze and reveal the policy intervention group with a high priority in terms of industrial incident prevention and the related investment cost. A Policy Priority Model(PPM) is composed of 6 indicators regarding influences of both the incident reduction and the cost reduction. Z-score analyses are used to confirm the high policy priority area or policy target group. Overall, workplace with worker below 50 persons, construction site with the sales of more than a hundred million won, workplace with relatively small percentage of female employees and relatively higher percentage of older worker should be prioritized to reduce workplace injuries. This paper provides an analytic way that can be used to decide the policy priority workplace in order not only to reduce work-related injuries&illnesses and the related investment cost but to further lessen the related societal costs.
Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
The Journal of Engineering Geology
/
v.23
no.3
/
pp.257-269
/
2013
Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.
Northeast Asia logistics hub strategy was undertaken by Korean Government to gain a national competitive advantage in Northeast Asia. Current Government has Northeast Asian Economic Hub Strategy including construction of SOC in Northeast Asia for promoting peace, promotion of formation of Northeast Asia Community, logistics hub, Financial hub and national innovation for R&D Cluster. To realize Northeast Asian logistics hub, the Northeast Asia logistics hub road map has undertaken as follows: expansion of logistics infra in Incheon Airport, Busan Port and Gwangyang Port, systematic improvements such as adjustment of investment distribution, special logistics companies, transparent customs in logistics transactions, logistics manpower, improvement of system supporting global logistics and attraction of international logistics companies to the logistics center, construction of seamless and paperless logistics information network, Northeast Asia railway infra. The purpose of this paper is to study investment priority and improvements in the Northeast Asia Logistics Hub Road Map and to contribute to gain the national competitive advantage as logistics hub in Northeast Asia
Journal of Korean Society of Industrial and Systems Engineering
/
v.21
no.48
/
pp.291-297
/
1998
This paper considers the determination of the priority of investment on R&D planning on nuclear power technology using AHP. Due to the complexity of problem, the hierarchy was divided into two parts; main hierarchy and sub-hierarchies. The result shows that the priority of technology options of evolutionary reactor and safety evaluation was higher than that of others.
Park Chang-Ho;Chae Woo-Kyu;Jang Sung-Il;Kim Kwang-Ho;Kim Jae-Chul;Park Jong-Keun;Choi Jung-Hwan
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.4
/
pp.177-184
/
2005
This paper proposes a improved investment priority decision method of the facilities considering the reliability of distribution networks. The proposed method decides a investment order of the facilities combining, by fuzzy rules, the investment priority decision of KEPCO and the priority decision considering reliability evaluation indices. Where reliability evaluation indices are SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index), as referred to evaluation index for sustained interruption. The reliability analysis method of distribution networks applied in this paper utilizes analytic method, where the used reliability data is historical data of KEPCO. Particularly, we assumed that the failure rate increased as the equipment ages. To verify the performance of the proposed method, we applied it with the planned projects to reinforce the weak facility electrical facilities in KEPCO in 2004. The evaluation result showed that, under a limited budget, the reliability of the KEPCO in the Busan region using the proposed method can be enhanced than using the conventional KEPCO's method. Therefore, the results verify the proposed method can be efficiently used in the actual priorities method for investing the electrical facilities.
Disaster and safety budget can be characterized as a large-scale public asset on which the government has a significant role. It is of a crucial importance to properly allocate the limited national budget to various areas as necessary. Higher investment efficiency of the budget related to disaster and safety management requires distribution criteria based on relevance and efficiency. Currently, the budget related to disaster and safety management is orchestrated through the prior consultation system. However, there is still no clear framework for reviewing the investment direction and setting the priority investment areas by prior consultation. This study analyzes the status and characteristics of disaster and safety management projects by damage type and proposes a structured system for prioritization. This framework can be useful in selecting the areas that need priority investments by damage type of disaster and safety management projects, thereby contributing to improving investment efficiency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.