• Title/Summary/Keyword: Investment Priority

Search Result 231, Processing Time 0.025 seconds

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

A Research for the Setup of Evaluation Standards and the Decision of an Investment Priority of Information and Communication Enterprises of the Government (정보화 투자사업의 평가기준 설정 및 우선순위 결정에 관한 연구)

  • Song, Aeu-Guen;Kim, Sung-Eon
    • The Journal of Information Systems
    • /
    • v.16 no.3
    • /
    • pp.91-108
    • /
    • 2007
  • To decide a reasonable investment priority of public enterprises, it is required to have an efficient evaluation standard. However, without having a standard, a budget for those enterprises has been allocated. In this research, for the efficient and reasonable budget allocation, it is discussed how to decide investment priority of information and communication enterprises of the government. In order to examine possible alternatives of the investment priority of information and communication enterprises of the government, seventeen enterprises were chosen from the enterprises of Ministry of Information and Communication. Public benefit, economic benefit, technology, politics, and step-up increase of budget were set up as evaluation standards and 16 specific standards were set up as subordinates. A hierarchical decision model was designed and analyzed by using AHP.

  • PDF

A Novel Investment Priority Decision Method for Facilities of Distribution Systems Considering Reliability of Distribution System (신뢰도를 고려한 배전계통 설비투자 우선순위 결정에 관한 연구)

  • Choi Jung Hwan;Park Chang Ho;Kim Kwang Ho;Jang Sung il;Cho Sung Hyeon
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.545-547
    • /
    • 2004
  • This paper proposes the novel investment priority decision method for distribution facilities considering the potential failure rate and the influence of customer caused by faults in distribution networks. The Proposed method decides the investment priority of the facilities combining, by the fuzzy rules, the KEPCO's priority decision for investment and the priority decision considering SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index). To verify the performance of the proposed method, these works utilized the projects for weak facility reinforcement planned in KEPCO in the Busan region in 2003 and 2004. The evaluation results showed that the reliability of the KEPCO in the Busan region using the proposed method can be enhanced more than using the conventional KEPCO's method.

  • PDF

Development of Rock Slope Risk Rating System for the Determination of the Priority of Investment (도로절개면 투자우선순위 결정기법 개발)

  • 구호본;박혁진;민기복;정의진;김춘식;박성욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.411-418
    • /
    • 2000
  • With the limited amount of budget and time, it is required to determine the priority of investment when there are a large number of hazardous slopes. In this paper, the Rock Slope Risk Rating System is developed based on the combination of the hazard of failure and the damage potential. By applying the proposed rating system to 253 rock slopes in Korean National Highway, it was possible to determine the priority of investment on road cut slopes.

  • PDF

An Analysis of Policy Priority for Work-Related Injury & illness and Investment Losses of Workplace Safety (작업관련성 손상·질병 발생과 손실비용에 따른 예방정책 우선순위 연구)

  • Park, Kyoung-Don;Yi, Kwan-Hyung
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.7-16
    • /
    • 2013
  • As workplace incidents has been being declining in Korea, there is criticism of the effectiveness of occupational safety policy implementation. It is unknown that which policy target group needs to be targeted to yield effective injuries prevention. The purpose of this paper is to analyze and reveal the policy intervention group with a high priority in terms of industrial incident prevention and the related investment cost. A Policy Priority Model(PPM) is composed of 6 indicators regarding influences of both the incident reduction and the cost reduction. Z-score analyses are used to confirm the high policy priority area or policy target group. Overall, workplace with worker below 50 persons, construction site with the sales of more than a hundred million won, workplace with relatively small percentage of female employees and relatively higher percentage of older worker should be prioritized to reduce workplace injuries. This paper provides an analytic way that can be used to decide the policy priority workplace in order not only to reduce work-related injuries&illnesses and the related investment cost but to further lessen the related societal costs.

Analysis of Priority Investments for Preventing Roadside Slope Failures (도로비탈면 투자우선순위 결정에 관한 연구)

  • Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.257-269
    • /
    • 2013
  • Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.

Investment Priority and ImProvements in the Northeast Asia Logostics Hub Road Map (한국의 동북아 물류중심로드맵 투자우선순위와 개선방안)

  • Choe, Seok-Beom
    • Journal of Korea Port Economic Association
    • /
    • v.20 no.2
    • /
    • pp.187-216
    • /
    • 2004
  • Northeast Asia logistics hub strategy was undertaken by Korean Government to gain a national competitive advantage in Northeast Asia. Current Government has Northeast Asian Economic Hub Strategy including construction of SOC in Northeast Asia for promoting peace, promotion of formation of Northeast Asia Community, logistics hub, Financial hub and national innovation for R&D Cluster. To realize Northeast Asian logistics hub, the Northeast Asia logistics hub road map has undertaken as follows: expansion of logistics infra in Incheon Airport, Busan Port and Gwangyang Port, systematic improvements such as adjustment of investment distribution, special logistics companies, transparent customs in logistics transactions, logistics manpower, improvement of system supporting global logistics and attraction of international logistics companies to the logistics center, construction of seamless and paperless logistics information network, Northeast Asia railway infra. The purpose of this paper is to study investment priority and improvements in the Northeast Asia Logistics Hub Road Map and to contribute to gain the national competitive advantage as logistics hub in Northeast Asia

  • PDF

A Study on the Determination of the Priority of Investment on R&D Planning on Nuclear Power Technology using AHP (AHP를 이용한 원자력 연구개발 대안평가)

  • 이병욱;임채영
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.291-297
    • /
    • 1998
  • This paper considers the determination of the priority of investment on R&D planning on nuclear power technology using AHP. Due to the complexity of problem, the hierarchy was divided into two parts; main hierarchy and sub-hierarchies. The result shows that the priority of technology options of evolutionary reactor and safety evaluation was higher than that of others.

  • PDF

An Improved Investment Priority Decision Mettled for the Electrical Facilities Considering the Reliability of Distribution Networks (배전계통 신뢰도를 고려한 전기설비투자 우선순위 결정 기법)

  • Park Chang-Ho;Chae Woo-Kyu;Jang Sung-Il;Kim Kwang-Ho;Kim Jae-Chul;Park Jong-Keun;Choi Jung-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.4
    • /
    • pp.177-184
    • /
    • 2005
  • This paper proposes a improved investment priority decision method of the facilities considering the reliability of distribution networks. The proposed method decides a investment order of the facilities combining, by fuzzy rules, the investment priority decision of KEPCO and the priority decision considering reliability evaluation indices. Where reliability evaluation indices are SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index), as referred to evaluation index for sustained interruption. The reliability analysis method of distribution networks applied in this paper utilizes analytic method, where the used reliability data is historical data of KEPCO. Particularly, we assumed that the failure rate increased as the equipment ages. To verify the performance of the proposed method, we applied it with the planned projects to reinforce the weak facility electrical facilities in KEPCO in 2004. The evaluation result showed that, under a limited budget, the reliability of the KEPCO in the Busan region using the proposed method can be enhanced than using the conventional KEPCO's method. Therefore, the results verify the proposed method can be efficiently used in the actual priorities method for investing the electrical facilities.

Investment Direction of Disaster Safety Projects Considering Characteristics of Disaster Safety (재난안전사고 피해특징을 고려한 재난안전사업 투자방향 제시)

  • Heo, Bo-Young;Cho, Sung-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.2
    • /
    • pp.41-50
    • /
    • 2017
  • Disaster and safety budget can be characterized as a large-scale public asset on which the government has a significant role. It is of a crucial importance to properly allocate the limited national budget to various areas as necessary. Higher investment efficiency of the budget related to disaster and safety management requires distribution criteria based on relevance and efficiency. Currently, the budget related to disaster and safety management is orchestrated through the prior consultation system. However, there is still no clear framework for reviewing the investment direction and setting the priority investment areas by prior consultation. This study analyzes the status and characteristics of disaster and safety management projects by damage type and proposes a structured system for prioritization. This framework can be useful in selecting the areas that need priority investments by damage type of disaster and safety management projects, thereby contributing to improving investment efficiency.