• 제목/요약/키워드: Investigation cost

검색결과 896건 처리시간 0.023초

Aluminum 합금재 Frame을 이용한 벽체거푸집공법의 성능평가에 관한 연구 (A Study on the Performance Evaluation of Form Using the Aluminum Alloy Frame Reinforced Panel)

  • 안재철;오상균;강병희
    • 한국건축시공학회지
    • /
    • 제1권1호
    • /
    • pp.135-142
    • /
    • 2001
  • This study is for the investigation of form using the aluminum-compound metal frame(Aluminum frame reinforced panel : AFR panel) which is improved in the capacity in the wall-concrete structure in steal of using the existing form which has problems such as, excessive exposure of cement, the loss of labor when it is constructed or disjointed, and it's economical efficiency compared with that of EURO Form. AFR panel passes the KS F 8006 test, and as a result of field test, it's displacement is satisfied with Specification. And using AFR panel is more economical than that of EURO Form because saving labor cost which plays a major part in cost saving in formwork is more effective in retrenching total cost than increment of material cost.

  • PDF

Investigation of the effects on earthquake behavior and rough construction costs of the slab type in reinforced concrete buildings

  • Gursoy, Senol;Uludag, Omer
    • Advances in concrete construction
    • /
    • 제10권4호
    • /
    • pp.333-343
    • /
    • 2020
  • In the architectural design process, the selection and configuration of the structural system significantly affect the earthquake behaviours of the reinforced concrete buildings. The main purpose of this study, the effects on the earthquake performances and the rough construction cost of the buildings of the slab type in reinforced concrete buildings are to examine comparatively for different local soil classes. The results obtained from this study have been determined that the building model having slabs with beams is safer compared to other types of slabs, especially when considering the vertical bearing structural elements (columns). It also shows that other types of slab, except for slab with beams, reduce the earthquake performances of reinforced concrete buildings, increase the displacement values, 1st natural vibration period values and the cost of rough construction. This matter reveals that slab type is quite important and the preference of beamed slabs in reinforced concrete buildings to be constructed in earthquake zones would be more appropriate in terms of safety and cost.

저가흡착제를 이용한 염색폐수의 색도제거에 관한 기초 연구 (A Fundermental Study Color Removal of Dyeing Wastewater using Low Cost Adsorbents)

  • 김은호;장성호
    • 환경위생공학
    • /
    • 제14권2호
    • /
    • pp.40-45
    • /
    • 1999
  • This study deals with an investigation on low cost adsorbents locally available n dyeing wastewater treatment of color removal. Peat, bentonite, slag and fly ash were utilized for this study. Considering that low cost adsorbents contained in $SiO_2$, $Fe_2O_3$ and $Al_2O_3$ compositions, and coagulants were mainly used aluminate and ferrate in color removal. Color of dyeing wastewater was high removed in peat, berntonite and slag except for fly ash with passed time. It could be known that color removal of peat and slag were increased to pH 4, but was hardly changed with advancing to alkaline. Color intended to be high removed with increasing of agitation speed but to be almost slow after 150rpm. As a result on the experiment of Freundlich adsorption isotherms, adsorption intensity(l/n) appeared to be peat>fly ash>slag>bentonite and adsorption capacity(k) came out peat>bentonite>slag>fly ash. Therefore, if low cost adsorbents substituted for existing adsorbents, peat, bentonite and slag could look forward to an expected economical effect.

  • PDF

전기자동차 인프라 스트럭처의 경제성 분석 (Analysis of the cost of Electric Vehicle infrastructure)

  • 하회두;박정우;김종무
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 F
    • /
    • pp.2537-2539
    • /
    • 1999
  • In order to widen the radius of electric vehicle (EV) travel recharging points must be provided in sufficient numbers and at convenient places. The cost of providing side an infrastructure is at preset, not well documented and this lack of information acts as a detersent to prospective insestors in EV technology. This paper acts as a preliminancy investigation into the cost of infrastructure is the different situation i.e for the private owner, the fleet owner or for the public. It provides an overview of the items required and this relative costs. Cost will however, vary from country to country and application to application, and this paper two acts purely as guide to the type of equipment and its relative costs.

  • PDF

건강보험 현지조사제도에서 일반적 억제이론에 대한 경험적 연구 (An Empirical Study on General Deterrence Effects of the On-site Investigation System in the Korean National Health Insurance)

  • 강희정;홍재석;김세라;최지숙
    • 보건행정학회지
    • /
    • 제19권3호
    • /
    • pp.109-124
    • /
    • 2009
  • Background: This study aimed to examine whether cases of punishing false claimants threat general physicians to check their medical cost claims with care to avoid being suspected, and identify empirically general deterrence effects of the on-site investigation system in the Korean National Health Insurance. Methods: 800 clinics were selected among a total of 15,443 clinics that had no experience of on-site investigation until June 2007 using a stratified proportional systematic sampling method. We conducted logistic multiple regression to examine the association between factors related to provider's perception of on-site investigation and high level of perceived deterrence referring to fear of punishment after adjusting provider's service experiences and general characteristics. Results: The probability of high perceived deterrence was higher 1.7 times (CI: 1.13-2.56), 2.73 times (CI: 1.68-4.45) each among clinics exchanging the information once or more per year or once or more for 2-3 months than among clinics no exchanging the information about on-site investigation. Also, the probability of high perceived deterrence was higher 2.27 times (CI: 1.28-4.45) among clinics that knows more than 3 health care institutions having experienced an on-site investigation than among clinics knowing no case. Conclusion: A clinic knowing more punishment cases by onsite investigation and exchanging more frequently information about on-site investigation is likely to present high perceived deterrence. This result will provide important information to enlarge preventive effects of on-site investigation on fraud and abuse claims.

해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토 (An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost)

  • 성낙원;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.579-583
    • /
    • 2004
  • 고속도로 신설 및 확장공사는 국가의 기반시설을 설치하기 위한 대규모 공공사업으로 정확한 산출근거에 의해 공사비용을 산정하여 적정 예산을 책정하여야 한다. 그러나 현재 고속도로 신설 침 확장공사의 구조물 해체 비용은 단지 구조물 설치 비용에 표준품셈에 명기된 일정 비율($10\~70\%$)을 곱하여 산정되고 있다. 해체 비용 산정에 이용되고 있는 표준품셈 상의 일정 비율은 과거 실적데이터를 기반으로 구축된 것이 아니라 해외 산정방식을 참고로 공사 관리자의 주관적 경험을 적용하여 도출된 것이다. 설치비에 일정비율을 곱하여 해체 비용을 산정하는 기존 방식은 프로젝트의 특성 및 건설현장의 주변 여건을 고려할 수 없으므로 노무량 및 장비 투임량의 변화를 고려할 수 없는 문제점을 가지고 있다. 따라서, 본 연구에서는 다양한 현장 조사 및 실측을 통한 해체 공사비 원가 분석을 수행하여 구조물 해체를 위한 적정원가 산정기준을 제시하고 기존 비율단가 적용방식의 적정성을 검토하고자 한다.

  • PDF

일반농산어촌개발 지역역량강화사업비의 적정요율 산정 (An Estimation of the Standard Cost of Project Management of Empowerment Sector in Comprehensive Rural Village Development Project)

  • 최영완;박현용;김영주
    • 농촌계획
    • /
    • 제19권3호
    • /
    • pp.131-144
    • /
    • 2013
  • The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. (1) In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. (2) Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.

공동주택 내/외장재 및 설비재의 비용분석을 통한 리모델링시기 검토를 위한 연구 (A Study on Remodeling Period by Cost Analysis of Finished and Equipped Materials in Apartment Building)

  • 오진수;김기형;이명식
    • 한국실내디자인학회논문집
    • /
    • 제14권5호
    • /
    • pp.218-225
    • /
    • 2005
  • In this apartment market, many apartments are being reconstructed within even less than 20 years from their first construction. This entails many problems in environmental and economical facets, for which many researches are under way in several institutions and universities. International cases show that the international trend goes for remodeling of maintenance, management, and repairing rather than new building. The purpose of this study is to investigate the factors of cost evaluation for establishing the time period of apartment based on durability of material and equipment while considering the economic feasibility of apartment, when remodeling as a concept of sustainability regarding building is being vitalized. This study investigates the proper period of remodeling in consideration of weight accruing to the LC(Life Cycle) and cost based on the standardized durability. The weight of cost, period establishment analysis, and LC according durability varies the data values of remodeling periods. The physical durability and cost from this data enable the investigation into not only the repair period of individual materials of the apartment but also remodeling period.

클라우드 환경에 적합한 디지털 포렌식 수사 모델 (Digital Forensic Model Suitable for Cloud Environment)

  • 이규민;이영숙
    • 융합보안논문지
    • /
    • 제17권3호
    • /
    • pp.15-20
    • /
    • 2017
  • 클라우드 컴퓨팅은 인터넷이 가능한 환경에서 다양한 단말을 통해 IT 자원(소프트웨어, 스토리지, 서버, 네트워크)을 이용할 수 있는 서비스이다. 편리성과 효율성, 비용 절감의 이유로 최근 이용률이 급증하였다. 하지만 정보의 집중화로 인해 범죄의 표적이 되거나 클라우드 서비스를 악용하는 범죄가 발생하였다. 기존 디지털 포렌식 절차는 개인 단말기를 대상으로 하는 수사에 적합하다. 본 논문은 기존 디지털 포렌식 수사 절차로 클라우드 환경을 조사할 경우 발생하는 취약점들을 분석하여 새로운 수사 모델을 제안하였다. 제안된 수사 모델은 계정정보를 획득할 수 있는 방법을 추가하였으며, 공공 클라우드와 사설클라우드를 아울러 적용할 수 있다. 또한, 클라우드 서비스는 쉽게 접근이 가능하여 디지털 증거 인멸 가능성이 높기에 계정 접근 차단 단계를 추가함으로써 수사 모델을 보강하였다.

원전수거물 처분장 후보부지 특성평가 방안 (Site Characterization for a Low-level Radioactive Waste Repository)

  • 김천수;배대석;박천수
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2003년도 가을 학술논문집
    • /
    • pp.276-282
    • /
    • 2003
  • 지층처분연구를 통한 지구과학분야의 기술적 발전은 천연방벽의 특성을 이해하기 위한 계측방법 및 단계적 부지조사ㆍ평가과정을 확립하였으나, 아직도 지하매질의 불균질성과 규모 종속적인 특성 때문에 후보부지특성에 대한 이해는 부족한 상태이다. 부지특성 평가결과의 불확실성으로 인한 시간적ㆍ경제적 부담을 줄이기 위해서는 무엇보다도 후보부지를 중심으로 계획된 정확하고 치밀한 부지특성평가계획의 수립과 전반적인 수행과정 및 결과에 대한 품질보증 시스템의 적용이 요구된다. 또한 원전수거물 처분시설에서 요구되는 충분조건과 필요조건으로 구분하여 단계별로 평가하여야 한다.

  • PDF