This paper discusses the analysis of arc conductance in a gas circuit breaker (GCB) during current interruption process and the investigation method of the interruption capability. There are some limitations in the application of the computational fluid dynamics (CFD) for the implementation of an arc model around the current zero, despite the fact that it gives good results for the high-current phase arc. In this study, we improved the accuracy in the analysis of the interruption performance by attempting the method using CFD and a mathematical arc model. The arc conductance at 200 ns before current zero (G-200ns) is selected as the indicator to predict the current interruption of the Short Line Fault (SLF). Finally, the proposed method is verified by applying to the actual circuit breakers which have different interruption performances.
The main factors to bring out the power failure are trouble and operation power failure, the operation power failure of these includes about 85%. So, it is required that the without interruption of service method reduce the operation power failure. If we develop the without interruption of service method, the operation power failure will reduce greatly. It is necessary to develop the without interruption of service method which it solve various trobles (dissatisfacting solution of customer, sales revenue augmentation, and the reduction of the power failure negotiation work). The results of study are drawing up of the specification for temporary transmission methods, it of the working methods for them, and the scrutiny of the technology contents for them.
This paper deals with a evaluation algorithm of interruption cost in distribution systems in the case where Dispersed Storage and Generation (DSG) systems are interconnected with the distribution systems. If DSG systems are operated as the function of the load levelling in distribution systems at the normal conditions and as the uninterruptible power supply in fault areas at the emergency conditions, the reliability improvement of the distribution systems can be expected. In other words, the benefit can be represented by the cost avoiding interruption according to the operation of DSG systems when a fault is occurred. Therefore, this paper presents the evaluation algorithm for interruption cost in order to evaluate the benefit for the uninterruptible power supply of DSG systems in a quantitative manner.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.53
no.1
/
pp.22-30
/
2004
As an information-oriented society comes, many people use PC and depend on database that network server has. However, the online data can be missed when a blackout happens and also a power failure effects on standard of judgment on Power Quality. Thus, it is reason of a trend using interruption-free live-line work when a trouble happens to power system. However, the 83% among the number of people who receive an electric shock experience when a laborer is doing interruption-free live-line works. In interruption-free method, the education and the training problem has been issued. However, we have a few instructors for that training. Furthermore, the trainees have short training period, just 4 weeks. In this paper, to develope the method that has no restriction of a time and place and reduce the wasteful materials, immersion type virtual reality(or environment) technology is used. The users of a 3D immersion type VR training system can interact with the system by doing same action in the real safe environment. Thus, it can be valuable to apply this training system to a dangerous work like as "Interruption-free live-line work exchanging COS(Cut-Out-Switch)". In this program, the user works with a instruction on the window and speaker and can't work other tasks until each part of the task completed. The workers using this system can use their hands and viewpoint movement as he is in a real environment but the trainee can't use all parts and senses of a real body with the current VR technology. Despite of this weak point, when we consider the trends of improvement in electrical devices and communication technology, we can say that 3D graphic VR application has a high potentiality.
This paper analyzed the fault current limiting characteristics of the previously proposed transformer superconducting fault current limiter (TSFCL) interruption system according to its transformer type. The TSFCL interruption system is an interruption technology that combines a TSFCL, which uses a transformer and a superconductor, and a mechanical DC circuit breaker. This technology first limits the fault current using the inductance of the transformer winding and the quench characteristics of the superconductor. The limited fault current is then interrupted by a mechanical DC circuit breaker. The magnitude of the limited fault current can be controlled by the quench resistance of the superconductor in the TSFCL and the turns ratio of the transformer. When the fault current is controlled using a superconductor, additional costs are incurred due to the cooling vessel and the length of the superconductor. When the fault current is controlled using step-up and step-down transformers, however, it is possible to control the fault current more economically than using the superconductor. The TSFCL interruption system was designed using PSCAD/EMTDC-based analysis software, and the fault current limiting characteristics according to the type of the transformer were analyzed. The turns ratios of the step-up and step-down transformers were set to 1:2 and 2:1. The results were compared with those of a transformer with a 1:1 turns ratio.
The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.
KIEE International Transactions on Power Engineering
/
v.4A
no.4
/
pp.171-177
/
2004
In the current age of the information oriented society in which we live, many people use PCs and are dependant on the databases provided by the network server. However, online data can be missed during the occurrence of a blackout and furthermore, power failure can greatly effect Power Quality. This has resulted in the trend of using interruption-free live-line work when trouble occurs in a power system. However, 83% of the population receives an electric shock experience when a laborer is performing interruption-free live-line work. In the interruption-free method, education and training problems have been pinpointed. However, there are few instructors to implement the necessary training. Furthermore, the trainees undergo only a short training period of just 4 weeks. In this paper, to develop a method with no restrictions on time and place and to ensure a reduction in the misuse of materials, immersion type virtual reality (or environment) technology is used. The users of a 3D immersion type VR training system can interact with the system by performing the equivalent action in a safe environment. Thus, it can be valuable to apply this training system to such dangerous work as 'Interruption-free live-line work exchanging COS (Cut-Out-Switch)'. In this program, the user carries out work according to instructions displayed through the window and speaker and cannot perform other tasks until each part of the task is completed in the proper sequence. The workers using this system can utilize their hands and viewpoint movement since they are in a real environment but the trainee cannot use all parts and senses of a real body with the current VR technology. Despite these weak points, when we consider the trends of improvement in electrical devices and communication technology, we can say that 3D graphic VR application has high potentiality.
Zhu, Junpeng;Gu, Wei;Jiang, Ping;Song, Shan;Liu, Haitao;Liang, Huishi;Wu, Ming
Journal of Electrical Engineering and Technology
/
v.12
no.6
/
pp.2146-2156
/
2017
When a failure occurs in active distribution system, it will be isolated through the action of circuit breakers and sectionalizing switches. As a result, the network might be divided into several connected components, in which distributed generations could supply power for customers. Aimed at decreasing customer interruption cost, this paper proposes a theoretically optimal island partition model for such connected components, and a simplified but more practical model is also derived. The model aims to calculate a dynamic island partition schedule during the failure recovery time period, instead of a static islanding status. Fluctuation and stochastic characteristics of the renewable distributed generations and loads are considered, and the interruption cost functions of the loads are fitted. To solve the optimization model, a heuristic search algorithm based on the hill climbing method is proposed. The effectiveness of the proposed model and algorithm is evaluated by comparing with an existing static island partitioning model and intelligent algorithms, respectively.
This paper proposes a new configuration for the Unified Power Quality Conditioner, which has a DC/DC converter with super-capacitors for energy storage. The proposed UPQC can compensate the reactive power, harmonic current, voltage sag and swell, voltage imbalance, and voltage interruption. The performance of the proposed system was analyzed through simulations with PSCAD/EMTDC software. The feasibility of system implementation is confirmed through experimental works with a prototype. The proposed UPQC has ultimate capability to improve the power quality at the point of installation on power distribution systems and industrial power systems.
In this paper, We have measured the luminous flux variation of electrodeless fluorescent lamp system reducing a power source to 70% and applying a short interruption caused by the power failure. So we can understood that the protective device for apparatus of power sources is important thing to control electrodeless fluorescent lamp system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.