Analysis of project-level elements of a smart city: A case study

  • Kisi, Krishna P.;Bhattarai, Sushmit Sharma
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1001-1008
    • /
    • 2022
  • As a part of the Smart Cities Mission, the Government of India in 2015 embarked upon the development of 100 existing cities as smart cities. In this study, the authors selected Ahmedabad city as the smart city development in India and presented project-level elements of the city based on the secondary data availability. At first, the authors focused on peer-reviewed articles, policy documents, and technical reports. Next, the authors collected the secondary data of project-level elements of the Ahmedabad city from the years 2015 to 2019. The findings show no significant improvement in the sewage system and waste collection as compared to the level of investment made in these sectors. The study showed that the water supply system outperformed revenue generation based on the government investment made in that sector. As a lesson learned, these findings indicate that significant improvement should be addressed in sewage management and waste collection. These study findings could help government officials, investors, developers, and city planners in making the appropriate decision before and during smart city execution. The lesson learned from this study could be used as a reference to improve revenue during the future smart city implication.

  • PDF

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

THE PRIORITIZATION OF IMPROVEMENT NEEDS FOR UNDERGROUND CONSTRUCTION ENVIRONMENT

  • Sanggyu Lee;Goune Kang;Chang-Won Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-114
    • /
    • 2013
  • Underground construction requires long construction duration and a variety of equipment, and environmental management and improvement of its activities are considered necessary. For the purpose of the environmental improvement of underground construction activities, the appropriate development of technologies to reduce generated pollutants is mandatory. However, the analysis of the needs of technology development and the evaluation of development priorities should take precedence. In this research, the needs for the improvement of each construction activity are analyzed as a preliminary study for a proposed technology development plan to improve the environmental performance of underground construction. Firstly, environmental problem factors caused by underground construction activities are determined while underground construction types, methods, and activities are classified. A questionnaire survey to determine the needs for the improvement of each activity is then carried out. The survey indicated that the most urgent activity to be improved is that of cutting excavation, which causes environmental problems associated with flying dust. This study could be used as a basis for a technology development plan for the environmental improvement of underground construction activities. The result of this study, the priority of improvement needs, contributes to the effective allocation of a limited Research and Development (R&D) budget.

  • PDF

Development and Utilization of Wind Energy in Korea

  • Son, Choong-Yul;Byun, Hyo-In
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.349-353
    • /
    • 2001
  • Korea has a variety of favorable conditions for utilizing wind as energy. First of all, as a geographical characteristic, it is a peninsular country with its three frontiers surrounded by sea. Such a location makes the country influenced, all the year round, both by sea winds and by seasonal winds, so that it has a good possibility of putting its rich wind resources to use as an energy source. Particularly, in view of the results of observations and analysis of actual data about wind sources, it is quite possible to build wind paver plants in many regions across the country, such as inhabited islands dotted on its southern and western coasts around the Korean peninsular, a number of uninhabited islets attached the main islands, large-scaled reclaimed lands, and major inland areas. In Korea, the attempt to develop the technology of wind paver generation started in the 1970's. It was since 1988, when the Law on the promotion of Alternative Energy Development was enacted, that research and development activities for employing the wind force as a part of energy source have got into full swing. At that moment, however, due to the low level of domestic technological development, such efforts were mainly focused on the attainment of basic technologies with regard to wind power generation. Recently, there have been many noticeable changes in the international as well as domestic environments, such as the conclusion of the International Climate Treaty and the increase in public concerns of natural environment. It is quite possible to predict that the demand for wind paver generation will increase in the near future. Therefore, recognizing that wind, as a clean energy source, can be a promising method for coping with the International Climate Treaty and for replacing the fossil fuel, oil, this essay investigates the development history of wind paver generation systems and the status of technological development in Korea and presents an appropriate model for the development of the paver generation system that can compete with other energy sources.

  • PDF

Load Balancing for Zone Routing Protocol to Support QoS in Ad Hoc Network

  • Chimmanee, Sanon;Wipusitwarakun, Komwut;Runggeratigul, Suwan
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2002년도 ITC-CSCC -3
    • /
    • pp.1685-1688
    • /
    • 2002
  • Application Routing Load Balancing (ARLB) is a novel load balancing mode that combines QoS routing and load balancing in per application to support QoS far real-time application based on wired network. Zone Routing Protocol (ZRP) is a recent hybrid proactive/reactive routing approach in an attempt to achieve scalability of ad-hoc network. This routing approach has the potential to be efficient in the generation of control traffic than traditional routing schemes. Up to now, without proper load balancing tools, the ZRP can actually guarantee QoS for delay-sensitive applications when congestion occurred in ad-hoc network. In this paper, we propose the ARLB to improve QoS fur delay-sensitive applications based on ZRP in ad-hoc network when congestion occurred and to be forwarding mechanism fur route coupling to support QoS for real-time applications. The critical point is that the routing metric of ARLB is originally designed for wired network environment. Therefore, we study and present an appropriate metric or cost computation routing of ARLB for recently proposed ZRP over ad-hoc network environment.

  • PDF

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

DETAILS OF PRACTICAL IMPLEMENTATION OF REAL-TIME 3D TERRAIN MODELING

  • Young Suk Kim;Seungwoo Han;Hyun-Seok Yoo;Heung-Soon Lim;Jeong-Hoon Lee;Kyung-Seok Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.487-492
    • /
    • 2009
  • A large-scaled research project titled "Intelligent Excavating System (IES)" sponsored by Korean government has launched in 2006. An issue of real-time 3D terrain modeling has become a crucial point for successful implementation of IES due to many application limitations of state-of-the-art techniques developed in various high-technology fields. Many feasible technologies such as laser scanning, structured lighting and so on were widely reviewed by professionals and researchers for one year. Various efforts such as literature reviews, interviews, and indoor experiments make us select a structural light technique and stereo vision technique as appropriate techniques for accomplishment of real-time 3D terrain modeling. It, however, revealed that off-the-shelf products of structural light and stereo-vision technique had many technical problems which should be resolved for practical applications in IES. This study introduces diverse methods modifying off-the-shelf package of the structural light method, one of feasible techniques and eventually allowing this technique to be successfully utilized for achieving fundamental research goals. This study also presents many efforts to resolve practical difficulties of this technique considering basic characteristics of excavating operations and particular environment of construction sites. Findings showed in this study would be beneficial for other researchers to conduct new researches for application of vision techniques to construction fields by provision of detail issues about practical application and diverse practical methods as solutions overcoming these issues.

  • PDF

ESTABLISHMENT OF SAFETY GUIDELINES FOR ELDERLY CONSTRUCTION WORKERS

  • Lee, Jeong-Cheol;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1237-1241
    • /
    • 2009
  • With the average life expectancy increasing thanks to better standards of living and medical technology, the number of elderly construction workers in construction sites rises every year to surpass the 450 thousand people in the construction industry (24.7% of all employees in the construction industry). Similarly, the percentage of fatal accidents involving elderly workers has stood at 41~46 percent for the past five years; note that this is significantly higher than the other age groups, making safety measures for dealing with this issue a matter of urgency. This study sought to propose appropriate safety guidelines for elderly construction workers aged 50 years and over by examining the changes in their physical and psychological functions and through the subsequent analysis of the current status and causes of fatal accidents involving them. The guidelines targeted ferroconcrete construction where accidents occur quite often; construction was classified into mold construction, reinforcing rod construction, and concrete construction. Mold construction was further classified into preparation, carry-in, processing, assembly, and disassembly, and reinforcing rod construction, into preparation/transport and processing/assembly. Safety guidelines for each process were presented by dividing them into three aspects considering the changes in the physical and psychological functions according to their ages and type of accident causes: work environment improvement, machinery and equipment improvement, and work method improvement.

  • PDF

COST BENEFIT ANALYSIS OF HIGHWAY SYSTEMS

  • Darren Thompson;Don Chen;Nick Walker;Neil Mastin
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.494-496
    • /
    • 2013
  • Cost-Benefit Analysis (CBA) is a systematic optimization process that allows users to compare different alternatives and to determine if a project is a solid investment. Many state DOTs have included CBA in their pavement management systems (PMSs) to help allocate state funds for maintenance, rehabilitation, resurfacing, and reconstruction of pavements. In a typical CBA, each pavement type has an assigned weight factor which represents the level of importance of this pavement type. To conduct an accurate CBA, it is essential to select appropriate weight factors. Arbitrarily assigning weights factors to pavements can lead to biased and inaccurate funding allocation decisions. The purpose for this paper is to outline a method to develop an ideal set of weight factors that can be utilized to conduct more accurate CBA. To this end, a matrix of all possible weight factors sets was developed. CBA was conducted for each set of weight factors to obtain a population of possible optimization solutions. Then a regression analysis was performed to establish the relationship between benefit and weight factors. Finally, a multi-objective genetic algorithm was applied to select the optimal set of weight factors. The findings from this study can be used by state DOTs to strategically manage their roadway systems in a cost effective manner.

  • PDF

우주에서의 환경오염 방지를 위한 국제법적 규제 (International Legal Regulation for Environmental Contamination on Outer Space Activities)

  • 이영진
    • 항공우주정책ㆍ법학회지
    • /
    • 제24권1호
    • /
    • pp.153-194
    • /
    • 2009
  • 우주활동의 증가와 더불어 이는 지구상의 인류와 환경에 대한 지속적인 위협요인이 되고 있으며 그중에서도 우주활동과 관련된 환경문제로서 가장 심각한 것으로 파악되고 있는 것이 우주폐기물의 문제이다. 이는 다른 우주 물체에 대해서도 커다란 위협이 될 뿐 아니라 지구의 대기권으로 재진입하여 인간이 통제(control)할 수 없는 상태에서 지구상에 낙하될 때에 인간의 생명과 재산상에 커다란 위험을 초래하게 된다. 현재 우주활동과정에서의 우주공간이나 지구를 포함한 천체에 대한 환경보호와 그 대처를 위한 제도적 장치는 아직 미흡하며 이를 위한 우주국제법적 해결이 모색되고 있고 부분적으로는 우주환경오염을 방지하고자 하는 규정이 일부 조약에 도입되기도 하였다. UN COPUOS를 중심으로 우주조약이나 책임협약 및 달 협정뿐만 아니라 등록협약의 관련조항에서도 가능한 위험을 최소화하기 위한 규정을 두고 있음은 주지의 사실이다. 그밖에도 부분적 핵실험 금지조약이나 핵무기비확산 조약 그리고 환경변화기술의 군사적 사용금지협약 등을 통해서도 우주나 지구자연의 평화적인 이용에 대한 장애요인을 제거하기 위한 직,간접적인 법적 장치가 마련되어 있는 것으로 평가된다. 특히 별도의 법체계를 정립하는 것이 필요하다는 문제와 관련하여 ILA는 일찍이 1986년 세계국제법협회 (ILA) 서울 총회에서 의제로 제안된 이래로 8년여에 걸쳐 여러 차례 각국에서의 회기를 거쳐 이 문제에 대한 지속적인 논의를 해왔던 바, 그 결과 동 협회는 1994년 Buenos Aires 회의에서 최종 초안인 "우주 폐기물에 기인되는 손해로부터 우주 내지 자구환경을 보호하기 위한 국제문서초안"을 작성하여 COPUOS에 제출한 바 있다. 향후 이것은 COPUOS가 의제로 채택하여 기술분과나 법률분과소위원회에서 논의를 할 때 기초적인 검토 자료로서 중요한 역할을 할 것으로 사료되며 동위원회에서 이를 충분히 심의한 후 사안의 심각성에 비추어 조속한 결실을 맺게 되도록 노력해야 할 것이다.

  • PDF