• Title/Summary/Keyword: Intermittently aerated activated sludge

Search Result 12, Processing Time 0.01 seconds

A study on the Simultaneous Removal of Nitrogen and Phosphorus on Reactor Configuration in Intermittently Aerated Activated Sludge System (간헐폭기 활성슬러지 시스템에서 반응조 형태에 따른 질소 및 인의 동시제거 특성에 관한 연구)

  • Lee, Won-Ho;Seo, In-Seok;Kim, Kwang-Yul
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.2
    • /
    • pp.106-114
    • /
    • 1998
  • In this research, single-, two- and four-stage intermittently aerated activated sludge system were investigated for simultaneous removal of nitrogen and phosphorus with swine wastewater. For the comparison of removal efficiency, conventional activated sludge system was operated. Operational conditions of intermittently aerated activated sludge system were SRT 20day, HRT 24hr and aeration/nonaeration time 1hr/1hr, respectively. Nitrogen and phosphorus removal efficiency in Intermittently aerated activated sludge system was upgraded compare with conventional activated sludge system. In single-stage intermittently aerated activated sludge system, release-uptake of $PO_4^{3-}-P$ was observed very well but, phosphosrus removal in effluent was not effective. In single-stage intermittently aerated activated sludge system, release-uptake of $PO_4^{3-}-P$ in first reactor, was observed very well but, in following reactor, $PO_4^{3-}-P$ concentation showed almost no change. T-N removal efficiency in conventional activated sludge system, single-, two-, and four-stage intermittently aerated activated sludge system were 48, 87, 90.9 and 95.5%, respectively, and phosphorus removal efficiency were 48, 75, 97 and 95%, respectively. Intermittently aerated activated sludge system as a alternative processes of conventional system leads to meet satisfactory effleunt with only on/off aeration regulation and save energy for aeration.

  • PDF

A Study on the Field Application of Intermittently Aerated Activated Sludge Process for Water Reuse System (간헐포기 활성슬러지 중수처리공정의 현장적용 연구)

  • Seo, In-Seok;Kim, Byung-Goon;Park, Seung-Kook;Kwon, Sun-Woong
    • Journal of Korean Society on Water Environment
    • /
    • v.16 no.4
    • /
    • pp.513-521
    • /
    • 2000
  • Intermittently aerated activated sludge process was applied as a water reuse process of $70m^3/day$ for the upgrade of organic, nitrogen and phosphorus removal efficiency and clarifier performance. After application of the intermittently aeration, removal efficiency of BOD, SS, T-N and T-P were achieved 95%, 90%, 80% and 60%, respectively. Removal efficiencies in intermittently aerated process were considerably increased. comparing to those of continuously aerated activated sludge process. Also sludge rising problem in clarifier was improved. Average concentration of supplied reusing water were BOD 5 mg/L, turbidity 4 NTU and after chlorination, residual chlorine 0.4 mg/L, coliform 0 MPN/100mL. Intermittently aerated activated sludge process could be one of the best alternative process for the retrofit of conventional activated sludge process for the removal of nutrient in water reuse system.

  • PDF

Removal of Nitrogen and Phosphorus by Activated Sludge Process Combined with Aluminum Corrosion (알루미늄 부식을 적용한 활성슬러지법에서 질소 및 인 제거)

  • Choi Hyung Il;Cheong Kyung Hoon;Park Sang Il;Paik Ke Jin
    • Journal of Environmental Health Sciences
    • /
    • v.31 no.2 s.83
    • /
    • pp.172-178
    • /
    • 2005
  • A laboratory experiment was performed to investigate simultaneous removal of phosphorus and nitrogen from raw sewage by intermittently aerated activated sludge process packed with aluminum and silver plate. Two continuous experimental process, i.e. an intermittently aerated activated sludge process, and an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor were compared. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The amounts of Al eluted from aluminum plate 17 mg to 60.6 mg in this experimental conditions, and Al/P mole ratio were from 3.31 to 11.25. The total nitrogen removal efficiency in Run E were $60.6\%$ at the HRT of 12 hours. The effluent $PO_4-P$ concentration as low as $1.0\;mg/\iota$ could have been obtained during the continuous experiment in Run E at HRT of 12 hours.

Simultaneous Removal of Phosphorus and Nitrogen by Intermittently Aerated Activate Sludge combined with Aluminum Corrosion (알루미늄 부식을 조합한 간헐폭기 활성슬러지 공정에서 질소와 인의 동시 제거)

  • Cheong Kyung-Hoon;Choi Hyung-II;Jung Oh-Jin;Park Sang-II;Kim Woo-Hang
    • Journal of Environmental Science International
    • /
    • v.14 no.7
    • /
    • pp.675-681
    • /
    • 2005
  • A laboratory experiment was performed to investigate phosphorus and nitrogen removal from synthetic wastewater by intermittently aerated activated sludge process packed with aluminum and silver plate. Three continuous experi­mental processes, i. e. an intermittently aerated activated sludge process(Run A), an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor(Run B), and a reactor post stage(Run C) were compared. In the batch experiments, the phosphorus removal time in the reactor packed with aluminum and silver plate simultaneously was faster than that of the reactor packed with only an aluminum plate. More phos­phorus was removed with an increase of NaCl concentration. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The total nitrogen removal efficiency in Run B was $57\%\;and\;43.6\%$ at the HRT of 12 and 6 hours respectively. The effluent $PO_{4-}P$ concentration as low as 1.0 mg/L could be ob­tainable through the continuous experiment in Run B at HRT of 6 hours.

Determination of operation parameter on intermittently aerated activated sludge system by computer simulation model (컴퓨터 예측모델을 활용한 간헐폭기 활성슬러지 시스템의 운영인자 결정)

  • 이상일;서인석;이원호;손종렬
    • Journal of environmental and Sanitary engineering
    • /
    • v.10 no.2
    • /
    • pp.23-29
    • /
    • 1995
  • In this research effect of SRT, feeding pattern and reactor configuration on intermittently aerated activated sludge system was evaluated by using computer simulation model. T- N removal was affected to the SRT. SRT for the effective T- N removal was 156ay or longer. Feeding pattern in intermittently aerated activated sludge system was affect to the T- N removal. Feeding pattern which 100% loading to the first reactor was most effective for T- N removal. When multi- stage of 2- stage or more was operated, COD and T- N in effluent removal was nearly the same.

  • PDF

Relationship Between C/N Ratio and Nitrogen Removal in Intermittently Aerated Activated Sludge System (간헐폭기 활성슬러지공정에서 C/N비와 질소제거의 관계)

  • 서인석;김병군;이상일
    • Journal of environmental and Sanitary engineering
    • /
    • v.13 no.2
    • /
    • pp.57-65
    • /
    • 1998
  • In this research, Effect of C/N ratio on nutrient removal in intermittently aerated activated sludge system(IAASS) was investigated with dormitary, building and swine wastewater. Three types (2-stage, 4-stage, modified) of IAASS were operated. Time interval of aeration/nonaeration in IAASS was 1hr/1hr. In treatment of Dormitary wastewater(BOD/T-N ratio : 4.4), Building wastewater (BOD/T-N ratio : 3.14) and swine wastewater(BOD/T-N ratio : 3.84), Nitrogen removal efficiency of 80, 70 and 90.4% was achieved, respectively. Nitrogen removal in IAASS was a great influenced on influent C/N ratio, efficient nitrogen removal was achieved at BOD/T-N ratio over 4. In IAASS operation, $\Delta $BOD mg/L/$\Delta $ nitrogen mg/L ratio was about 4-6. Simultaneous removal of organic, nitrogen and phosphorus in IAASS can achieved. And influent organic was efficiently utilized in denitrification. IAASS could be one of the best alternative process for the retrofit of conventional activated sludge system for the removal of nutrients.

  • PDF

Performances of Intermittently Aerated and Dynamic Flow Activated Sludge Process (2단간헐폭기 및 유로변경 간헐폭기 활성슬러지 시스템을 이용한 도시하수 처리)

  • 원성연;민경국;이상일
    • Journal of environmental and Sanitary engineering
    • /
    • v.13 no.1
    • /
    • pp.26-31
    • /
    • 1998
  • Removal of nitrogen and phosphate in wastewater is concerned to important for the prevention of eutrophication in receiving water and lake. Conventional activated sludge system designed for organics removal can be retrofitted only by modification of aeration basin to maintain anaerobic and aerobic state. Biological nutrient removal processes(BNR) such as Bardenpho, A$^{2}$/O, UCT, VIP were generally used for the treatment of wastewater. However these BNR processes used in large scale WWTP were not suitable in small scale WWTP(i.e., package type WWTP) due to relatively large fluctuation of flow rate and concentration of pollutants. The purpose of this research was to develop the compact, effective and economical package type WWTP for the removals of carbon and nitrogen in small scale wastewater. Intermittently aerated activated sludge system (IADFAS) were investigated for removal of nitrogen in both domestic wastewater, Bardenpho process was also evaluated. Nitrogen removal of IAAS, IADFAS, Bardenpho were 75, 77 and 67%, respectively.

  • PDF

Removal of Nutrients from Domestic Wastewater Using Intermittently Aerated Activated Sludge Systems Supplemented with Fermented Settled Sludge (발효된 1차 침전슬러지를 공급하여 간헐폭기조를 이용한 도시하수의 영양염류 처리)

  • Weon, Seung-Yeon;Lee, Sang-Ill
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.1
    • /
    • pp.18-23
    • /
    • 2004
  • In this research, a 2-stage intermittently aerated activated sludge system(IA) and intermittently aerated dynamic flow activated sludge system(DF) were investigated for the removal of nutrients in domestic wastewater. Wastewater was characterized by low C/N( organics/nitrogen) ratio. $COD_{cr}$, $BOD_s$, TKN and TP concentrations of domestic wastewater were 235, 47, 32 and 5.4 mg/L, respectively. Three sets of IA and one set of DF were operated. Three of four systems were added with fermented settled sludge taken from primary settling tank as an external electron donor and the other(IA) for control reactor was operated without addition of electron donor. All systems were operated at same sludge retention time of 20 days and hydraulic retention time of 12hrs. The supplemental electron donor was supplied into the anoxic mode. A higher denitrification rate was observed from the reactors with fermented settled sludge as an electron donor for denitrification compared to that of without addition of organic source. The result of this study indicates that the settled primary sludge, if the fermented at the acid stage, was an excellent electron donor for denitrification. 81 % of TN and 80% of TP were removed from the systems with the supplemental organic source added. However, the control reactor without addition of electron donor showed only 39% of TN and 43% of TP.

A Study on the Treatment of Swine Wastewater by Using Intermittently Aerated Activated Sludge Process (간헐폭기법에 의한 돈사 폐수 처리에 관한 연구)

  • Yang, Tae-Du;Lee, Mi-Kyung;Chung, Yoon-Jin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.4
    • /
    • pp.86-96
    • /
    • 1998
  • In this study, an intermittently aerated activated sludge process, modified process from conventional activated sludge process, was developed to treat high strength swine wastewater, which has been blamed as major pollutant for stream pollution. Therefore, the optimum cycle for oxic and anoxic period, SRT, and OLR were studied as design parameters. The effects of different time interval for oxic and anoxic period on nitrification and denitrification were examined by operating two reactors with 60/60min and 60/90min as oxic/anoxic period. Although the reactor with 60/60min showed complete denitrification of $NO_x-N$ generated during oxic period, the reactor with 60/90min showed incomplete nitrification due to the inactivity of nitrifier by accumulated $NH_3-N$ toxicity during anoxic period. Therefore, it is recommended to operate same interval for oxic and anoxic period. In order to determine the optimum cycle for oxic/anoxic period, four different reactors with 30/30, 60/60, 90/90 and 120/120min were examined. The reactor operation with 90/90min was optimum to get the most stable results in this study. However, the optimum cycle for oxic and anoxic period should be changed with characteristics of influent wastewater and operating conditions. According to lie operation results of three reactors with SRT of 15, 20 and 30days. The reactor with 2Odays SRT showed best removal efficiency of T-N. The optimum OLR would be $2.5Kg\;COD/m^3/day$ which showed the most stable nitrification and denitrification. Since characteristics of influent wastewater in the real system has a severe fluctuation, so it is very difficult to determine each interval for oxic and anoxic period. Therefore, ORP curves, describing the change of oxidation/reduction potential in reactor, can be used as a control parameter for automatic control of oxic and anoxic period. In other words, bending point (Nitrate Knee) of ORP curve during anoxic period could be used as a starting point of oxic period.

  • PDF

Effect of Advanced Wastewater Treatment by Variations Operating Conditions of 4-stage Intermittently Aerated Activated Sludge process (4단 간헐포기 공정의 운전조건이 고도처리에 미치는 영향)

  • Choi, Yong-Bum;Lee, Jeong-Gyu;Han, Dong-Joon;Kwon, Jae-Hyouk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.970-976
    • /
    • 2013
  • An evaluation of the organic matter removal efficiency showed high removal efficiencies of 91.1~96.3% and 91.4~97.5% for TCODcr and TBOD5, respectively, for 9hr or longer of HRT. However, the removal efficiencies decreased to 86.9~90.5% and 88.0~90.9%, respectively for 6hr of HRT. $NH_3$-N showed a high removal efficiency of 95% or higher for 9hr or longer of HRT. The total nitrogen removal efficiency was 67.6~76.7% for 9~12hr of HRT, and it decreased to 50% for 6hr of HRT, which seems to be due to the insufficient carbon source required for denitrification. The T-P removal efficiency was 32% on average. To comply with the legal standards, a chemical phosphorus removal process is needed after the reactor.