• Title/Summary/Keyword: Intermittent operation

Search Result 176, Processing Time 0.021 seconds

Battery Power Switching System for Implantable Telemetry Systems (체내 삽입 텔리메터리 시스템용 전원 스위칭 시스템 개발)

  • Seo, Hee-Don
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1990 no.11
    • /
    • pp.118-121
    • /
    • 1990
  • This paper describes development of an implantable power switching system for biotelemetry system. This system is designed and manufactured to achieve as small size and low power dissipation as possible, using pulse powered circult and CMOS technology. The function of the power switching system is to connect the implantable battery to implanted sensors and, electronics systems by receiving intermittent command signals from external circuits. The power dissipation of this system was about $15{\mu}W$ for a stand-by operation.

  • PDF

High power pulse source

  • 안수길
    • 전기의세계
    • /
    • v.11
    • /
    • pp.14-17
    • /
    • 1963
  • 정확하게 control된 pulse의 용도는 과학과 공업이 발달될수록 날로 많아져 가고 있는데 그의 일부는 대전력을 취급하는 경우로서, Radar에 대한 응용을 들 수 있다. 한편, 요지음 gallium-arsenide등 반도체 diode를 사용해서 Laser action을 일으킬 수 있다는것이 발견되어 G.E. 및 IBM등에서 개발되고 있다. 이 경우에, continuous emission도 가능하지만 흔히, intermittent operation을 시켜야 할 때가 많기 때문에 timed pulse source가 필요하게 된다. 또 한편, spot welding의 경우에도 이러한 pulse source가 필요하게 된다. 이들을 크게 나누어 source를 AC로 할 경우와 DC로 할 경우가 있는데, 전자의 경우는 thyratron을 사용할 경우가 많게 될 것이다. DC의 경우나 AC의 경우에나 잘 shape되고 time된 pulse source를 만들어 놓으면 진공관이나 thyratron이나 같은 모양으로 drive할 수 (thyratron의 경우는 trigger)있을 것이기 때문에, 이러한 pulse source를 만들 필요가 있게 된다.

  • PDF

Analysis on Factors Influencing on Wind Power Generation Using LSTM (LSTM을 활용한 풍력발전예측에 영향을 미치는 요인분석)

  • Lee, Song-Keun;Choi, Joonyoung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.4
    • /
    • pp.433-438
    • /
    • 2020
  • Accurate forecasting of wind power is important for grid operation. Wind power has intermittent and nonlinear characteristics, which increases the uncertainty in wind power generation. In order to accurately predict wind power generation with high uncertainty, it is necessary to analyze the factors affecting wind power generation. In this paper, 6 factors out of 11 are selected for more accurate wind power generation forecast. These are wind speed, sine value of wind direction, cosine value of wind direction, local pressure, ground temperature, and history data of wind power generated.

Magnetic and Thermal Analysis of a Water-cooled Permanent Magnet Linear Synchronous Motor

  • Zhang, Xinmin;Lu, Qinfen;Cheng, Chuanying;Ye, Yunyue
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.1 no.4
    • /
    • pp.498-504
    • /
    • 2012
  • The water-cooled Permanent Magnet Linear Synchronous Motor (PMLSM) has a wide range of applications due to high efficiency, high thrust force density and high acceleration. In order to ensure normal operation and maximum output, both the magnetic and thermal performance are vital to be considered. Based on ANSYS software, electromagnetic and thermal finite-element analysis (FEA) models of a 14-pole, 12-slot water-cooled PMLSM are erected adopting suitable assumptions. Firstly, the thrust force and force ripple with different current densities are calculated. Secondly, the influence of different water flow on the motor heat dissipation and force performance under different operationional conditions are investigated and optimized. Furthermore, for continuous operation, the temperature rise and thrust feature are studied under the rated load 8A, the proper temperature $120^{\circ}C$ and the limited temperature $155^{\circ}C$. Likewise, for short-time operation, the maximum duration is calculated when applied with a certain large current. Similarly, for intermittent operation, load time as well as standstill time are determined with the optimal current to achieve better thrust performance.

A Case of Duodenal Web Associated with Intestinal Malrotation (장이상회전이 동반된 십이지장 막양구조(Web) 1례)

  • Kim, Jin-Suk;Lee, Jhoo-Taek;Park, Jae-Ock;Shin, Sang-Mann
    • Pediatric Gastroenterology, Hepatology & Nutrition
    • /
    • v.2 no.1
    • /
    • pp.99-103
    • /
    • 1999
  • Duodenal web is an uncommon lesion that infrequently cause partial or complete intestinal obstruction. If the duonenal web is incomplete and only partially obstructs the duodenal lumen, the onset of symptoms may be delayed for years, and obstructive symptoms will be only minimal and intermittent. Congenital duodenal obstruction is occasionally associated with intestinal malrotation. We experienced a case of duodenal web associated with intestinal malrotation in a 9-year-old girl who had been suffered from intermittent projectile vomiting since birth without failure to thrive. The diagnosis was made by UGI series & abdominal CT. Patient remained asymptomatic after operation.

  • PDF

Evaluation of Nuclear Plant Cable Aging Through Condition Monitoring

  • Kim, Jong-Seog;Lee, Dong-Ju
    • Nuclear Engineering and Technology
    • /
    • v.36 no.5
    • /
    • pp.475-484
    • /
    • 2004
  • Extending the lifetime of a nuclear power plant [(hereafter referred to simply as NPP)] is one of the most important concerns in the global nuclear industry. Cables are one of the long-life items that have not been considered for replacement during the design life of a NPP. To extend the cable life beyond the design life, it is first necessary to prove that the design life is too conservative compared with actual aging. Condition monitoring is useful means of evaluating the aging condition of cable. In order to simulate natural aging in a nuclear power plant. a study on accelerated aging must first be conducted. In this paper, evaluations of mechanical aging degradation for a neoprene cable jacket were performed after accelerated aging under tcontinuous and intermittent heating conditions. Contrary to general expectations, intermittent heating to the neoprene cable jacket showed low aging degradation, 50% break-elongation, and 60% indenter modulus, compared with continuous heating. With a plant maintenance period of 1 month after every 12 or 18 months operation, we can easily deduce that the life time of the cable jacket of neoprene can be extended much longer than extimated through the general EQ test. which adopts continuous accelerated aging for determining cable life. Therefore, a systematic approach that considers the actual environment conditions of the nuclear power plant is required for determining cable life.

Intermittent Operation Induced Deactivation Mechanism for HER of Ni-Zn-Fe Electrode for Alkaline Electrolysis (수소발생용 Ni-Zn-Fe 합금 전극의 간헐적 작동에 따른 비활성화 특성)

  • HAN, JIMIN;KIM, JONGWON;BAE, KIKWANG;PARK, CHUSIK;JEONG, SEONGUK;JUNG, KWANGJIN;KANG, KYOUNGSOO;KIM, YOUNGHO
    • Journal of Hydrogen and New Energy
    • /
    • v.31 no.1
    • /
    • pp.8-22
    • /
    • 2020
  • In this study, we investigated the deactivation characteristics of Ni-Zn-Fe electrodes due to intermittent operation in alkaline water electrolysis. To find suitable method to accelerate deactivation of electrode, the accelerated stress-test (AST) which repeated on/off step was performed with constant current/voltage control. The AST under constant voltage control is suitable to deactivate electrode so it were selected to investigate deactivation of electrode. The AST which repeated on/off step in range of -1.3 V and 0 V was performed and the relationship between oxidation current and electrode deactivation in the off step was investigate. As results, it was confirmed that the nickel and zinc on electrode surface were oxidized due to anodic current which occurred at off step.

Analysis for Temperature and Relative Humidity of Showcase in Exhibition Hall Operated Intermittent Air Conditioning (간헐공조 전시관내 유물 진열장의 온·습도 환경 분석)

  • Lee, Sun Myung;Lim, Bo A;Kim, Seojin
    • Journal of Conservation Science
    • /
    • v.29 no.4
    • /
    • pp.311-320
    • /
    • 2013
  • The showcase has insufficient temperature control, but it has excellent humidity control. The annual average temperature and relative humidity inside the showcase was $18.8^{\circ}C$ and 60.3%, respectively, and the showcase showed lower temperature and higher humidity than the exhibition room. The temperature inside the showcase appeared with high variation according to the seasons, while relative humidity was ranging from 59% to 61% regardless of the seasons. The showcase showed high temperature and humidity likewise the exhibition room in summer. In addition, lowering of temperature was elevated relative humidity according to the operation of air conditioner in summer. A moisture problem occurred because the temperature and humidity differences between the exhibition room and showcase were large according to the operation of air conditioner in winter. PI for temperature and relative humidity inside the showcase is 18.0%, and it means conservation environment for exhibition is unsuitable. In particular, continuous management of temperature and humidity inside the showcase is required because PI in the summer and winter is less than 1.0%.

Optimum Operation of a PVDF-type Hollow Fiber Membrane Bioreactor for Continuous Sewage Treatment

  • Shin, Choon-Hwan
    • Journal of Environmental Science International
    • /
    • v.19 no.11
    • /
    • pp.1315-1322
    • /
    • 2010
  • A membrane bioreactor (MBR) was designed using polyvinylidene fluoride(PVDF)-type hollow fiber membrane modules with a treatment capacity of 10 ton/day. A pilot plant was installed in a sewage treatment plant and was operated with an intermittent aeration method which avoids any concentration gradient of suspended solids (SS) in the MBR. For continuous operation, the pilot plant was first tested with influent (mixed liquor suspended solid:MLSS of 1000-2000 mg/L) of aeration tanks in the sewage treatment plant. The MBR was pre-treated with washing water, 10% ethanol solution, 5% NaOCl solution and finally washing water, one after another. To demonstrate the effect of the MBR on sewage treatment, compared with conventional activated sludge processes, we investigated the relationships among permeate amount (LMH), change in operation conditions, influent MLSS level and sludge production. It was found that the optimum aeration rate and suction pressure were $0.3\;m^3$/min and 30~31 cmHg, respectively. Under stable conditions in aeration, suction pressure, influent flow rate and drainage, the SS removal efficiency was more than 99.99% even when the MLSS loading rate changes. Compared with conventional activated sludge processes, the MBR was more effective in cost reduction by 27% based on permeate amount and by 51.5% on sludge production.

A Study on Simplified Robust Optimal Operation of Microgrids Considering the Uncertainty of Renewable Generation and Loads (신재생에너지와 부하의 불확실성을 고려한 마이크로그리드의 단순화된 강인최적운영 기법에 관한 연구)

  • Lee, Byung Ha
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.513-521
    • /
    • 2017
  • Robust optimal operation of a microgrid is required since the increase of the penetration level of renewable generators in the microgrid raises uncertainty due to their intermittent power output. In this paper, an application of probabilistic optimization method to economical operation of a microgrid is studied. To simplify the treatment of the uncertainties of renewable generations and load, the new 'band of virtual equivalent load variation' is introduced considering their uncertainties. A simplified robust optimization methodology to generate the scenarios within the band of virtual equivalent load variation and to obtain the optimal solution for the worst scenario is presented based on Monte Carlo method. The microgrid to be studied here is composed of distributed generation system(DGs), battery systems and loads. The distributed generation systems include combined heat and power(CHP) and small generators such as diesel generators and the renewable energy generators such as photovoltaic(PV) systems and wind power systems. The modeling of the objective function for considering interruption cost by the penalty function is presented. Through the case study for a microgrid with uncertainties, the validity of proposed robust optimization methodology is evaluated.