• Title/Summary/Keyword: Integrated Management Model

Search Result 1,591, Processing Time 0.029 seconds

Development and Application of An Integrated Model for Quality Management Systems (품질경영시스템 통합모형 개발과 적용에 관한 연구)

  • Shin, W.S.;Yoo, J.S.;Na, S.B.
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.3
    • /
    • pp.75-87
    • /
    • 2007
  • This paper deals with an integration model of three major quality management systems. The well known global standards such as ISO 9001 quality system, Malcolm Baldrige model, and EFQM model are integrated as a prototype quality system. The proposed model is then applied to help a power generation company to select improvement tasks for enhancing quality management. Here, we discuss three quality management systems, an integration process of the three systems, the integrated model, and a real world application case.

A Study on the Development of Integrated Utilization Considering Multi Functions of Urban Estuarine Area (대도심 하구역 개발과 보전의 융합이용모형 개발 연구 -낙동강 하구역을 중심으로-)

  • Im, Jung-Hyeun;Choi, Jin-Hyu;Kim, Jun-Ho;Yoon, Han-Sam;Ryu, Cheong-Ro
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.22 no.4
    • /
    • pp.589-603
    • /
    • 2010
  • The purpose of this study is to develop a integrated(fusion) utilization model aimed at maximizing the development/management functions of urban estuarine area and to present an integrated concept by analyzing the existing document and data. The main points of this study are as follows: 1) The integrated utilization model suggested in this paper goes beyond the existing idea of sustainable utilization and conservation, putting an emphasis on rational decision-making in estuary management and peaceful coexistence between human and nature. 2) Policies for utilization/development/conservation/regeneration of urban estuarine area include the establishment of communication system between human and nature and a safety net considering both human and nature, the support for environment-friendly community development and the importance of preserving valuable ecosystem and wetland habitat. 3) Lastly, this study suggested that the major tasks for the fusion utilization model development are the integrated management of estuary areas, the conservation and preservation of wetland ecosystem, proper utilization of estuary's productivity, and the introduction and action plans of the integrated management model including the best way to address contamination and disaster management.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

Studying Retailer Strategies through an Integrated E-Business Model: a Multi-Agent Approach

  • Xie Ming;Chen Jian
    • Management Science and Financial Engineering
    • /
    • v.11 no.3
    • /
    • pp.1-17
    • /
    • 2005
  • Agent technology has been widely applied in today's electronic business, such as mobile agents, multi-agent information systems, etc. In particular, multi-agent systems have been applied as powerful simulation tools to study complex business networks composed of various self-interested trading firms and/or human beings. In this paper, we build an integrated model that consists of a multi-agent B2C market model and a B2B trade network model, and incorporate more reality than much of prior work. Then with this model, we carry out experimental studies on two different strategies that are common in electronic business - 'loyal' strategy (retailers try to build stable cooperation with suppiers to ensure material supply) and 'cost-saving' strategy (retailers try to reduce cost by choosing suppliers with lower wholesale price).

Strategic Approaches to Integrated Delivery System(IDS): Vertical Integration and Strategic Alliance (통합의료시스템(Integrated Delivery System, IDS)의 전략적 접근: 수직적 통합과 전략적 제휴)

  • Suh, Won S.
    • Korea Journal of Hospital Management
    • /
    • no.spc
    • /
    • pp.39-50
    • /
    • 2016
  • This paper discusses the strategic concepts applied to integrated delivery system(IDS). IDS is rooted in vertical integration(VI) and strategic alliance(SA), but only few knows about the theoretical backbone of the IDS. The paper explains how VI and SA applies to IDS, then provides cases of IDS rooted in strategic concepts; Kaiser Permanante Model, Mayo Clinic Model, and ACO(Accountable Care Organizations). Finally the paper provides the implication of IDS on Korean healthcare delivery system.

Development of Integrated Water Quality Management Model for Rural Basins using Decision Support System. (의사결정지원기법을 이용한 농촌유역 통합 수질관리모형의 개발)

  • 양영민
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.5
    • /
    • pp.103-113
    • /
    • 2000
  • A decision support system DSS-WQMRA (Decision Support System-Water Quality Management in Rural Area) was developed to help regional planners for the water quality management in a rural basin. The integrated model DSS-WQMRA, written in JAVA, includes four subsystems such as a GIS, a database, water quality simulation models and a decision model. In the system, the GIS deals with landuse and the location of pollutant sources. The database manages each data and supplies input data for various water quality simulation models. the water quality simulation model is composed of the GWLF( Generalized Watershed Loading Function), PCLM(Pollutant Loading Calculation Module) and the WASP5 model. The decision model based on mixed integer programming is designed to determine optimal costs and thus allow the selection of managemental practices to meet the water quality criteria. The methodology was tested with an example application in the Bokha River Basin, Kyunggi Province in Korea. It was proved that the integrated model DSS-WQMRA could be very useful for water quality management including the non-point source pollution in rural areas.

  • PDF

The Study on the Integrated Model of Strategic Enterprise Management System (전략적 경영관리 (SEM) 시스템의 통합 연계 방안에 관한 연구)

  • Yoon, Jae-Hee
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.479-488
    • /
    • 2003
  • With rapid changes in the business environment, many organizations pursue to manage cost management and performance management of the organizational business activities over the concept of profit management strategically, But the strategic enterprise management system is implemented individually and is not integrated. And the integrated model of strategic enterprise management is ambiguous and many consulting firms didn't suggested the proper model yet. Therefore in this study we studied the strategic enterprise management system, And we studied how to try to integrate the various components of the strategic enterprise management system through the case of the domestic L company site that implemented ABC/ABM, ABS, BSC, business planning & forecasting system recently.

  • PDF

Integrated Traffic Management Strategy on Expressways Using Mainline Metering and Ramp Metering (본선미터링과 램프미터링을 이용한 고속도로 통합교통관리 전략)

  • Jeong, Youngje;Kim, Youngchan;Lee, Seungjun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.2
    • /
    • pp.1-11
    • /
    • 2013
  • This research proposed integrated expressway traffic management strategy using ramp metering and toll mainline metering. This research suggested a traffic signal optimization model for integrated operation of ramp and mainline metering based on Demand-Capacity Model that is used to optimize allowable input volume for ramp metering in FREQ model. The objective function of this model is sectional throughput volume maximization, and this model can calculate optimal signal timings for mainline metering and ramp metering. This study conducted an effectiveness analysis of integrated metering strategy using PARAMICS and its API. It targeted Seoul's Outer Ring Expressway between Gimpo and Siheung toll gate. As a simulation result, integrated operation of mainline and ramp metering provided more smooth traffic flow, and throughput volume of mainline increased to 14% in congested section. In addition, a queue of 400 meter was formed at metering point of toll gate. This research checked that integrated traffic management strategy facilitates more efficient traffic operation of mainline and ramp from diffused traffic congestion.

AI Smart Factory Model for Integrated Management of Packaging Container Production Process

  • Kim, Chigon;Park, Deawoo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.3
    • /
    • pp.148-154
    • /
    • 2021
  • We propose the AI Smart Factory Model for integrated management of production processes in this paper .It is an integrated platform system for the production of food packaging containers, consisting of a platform system for the main producer, one or more production partner platform systems, and one or more raw material partner platform systems while each subsystem of the three systems consists of an integrated storage server platform that can be expanded infinitely with flexible systems that can extend client PCs and main servers according to size and integrated management of overall raw materials and production-related information. The hardware collects production site information in real time by using various equipment such as PLCs, on-site PCs, barcode printers, and wireless APs at the production site. MES and e-SCM data are stored in the cloud database server to ensure security and high availability of data, and accumulated as big data. It was built based on the project focused on dissemination and diffusion of the smart factory construction, advancement, and easy maintenance system promoted by the Ministry of SMEs and Startups to enhance the competitiveness of small and medium-sized enterprises (SMEs) manufacturing sites while we plan to propose this model in the paper to state funding projects for SMEs.

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.