• Title/Summary/Keyword: Installation technology

Search Result 1,962, Processing Time 0.029 seconds

Effective Installation and Operating of High Frequency Ocean Surface Radars in Korea -Part 1: Hardware (고주파 해수면 관측레이더의 국내 설치 및 운용방안 : 하드웨어 부문)

  • Song, Kyu-Min;Cho, Cheol-Ho
    • Ocean and Polar Research
    • /
    • v.34 no.4
    • /
    • pp.453-462
    • /
    • 2012
  • Ocean surface current data in Korea was collected using sets of High-Frequency Ocean Surface Radars (HFOSRs) with 25 radial sites in the frequency range of 5~43 MHz. Site selection and the correct installation of HFOSR are very important considerations in order to secure continuous and reliable results. The installation procedures of HFOSR are summarized as follows: 1. Survey area selection; 2. Investigation of ambient radio waves and installation environment; 3. Domestic license of radio station; 4. Installation of antenna and housing of electrical and communication devices. The current work describes the entire processes of HFOSR installation within Korea.

The Development and Performance Analysis of Multiple Signal Processing Circuit for Marine Installation Sensor (해양설비용 센서의 다중 신호처리 회로 개발 및 성능 분석)

  • Cho, Jeong-Hwan;Ko, Sung-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.12
    • /
    • pp.84-89
    • /
    • 2014
  • This paper proposes the new multiple signal processing monitoring sensor for the marine installation. The recent marine technology is focused on underwater sensors and underwater sensor networks in order to measure, monitor, surveillance of and control of underwater environments. For these marine applications to be available, however, the provision of precise location information using monitoring sensor is essential. In this paper, the multiple signal processing circuit for obtaining the precise location information of marine installation sensor is developed and analyzed. The performance characteristics for obtaining the location information of marine installation sensor is analyzed. The theoretical and experimental studies have been carried out. The presented results from the above investigation show considerably excellent performance for the monitoring for the marine installation.

Development of New Micropiling Technique and Field Installation (신개념 마이크로파일 개발 및 현장시험시공)

  • Choi, Chang-Ho;Goo, Jeong-Min;Lee, Jung-Hoon;Cho, Sam-Deok;Jeong, Jae-Hyeong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.571-578
    • /
    • 2009
  • Recently, micropiling techniques are increasingly applied in foundation rehabilitation/underpinning and seismic retrofitting projects where working space provides the limited access for conventional piling methods. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. Its installation is possible in restrictive area and general ground conditions. The cardinal features that the installation procedures cause minimal vibration and noise and require very low ceiling height make the micropiling methods to be commonly used for underpin existing structures. In the design point of view, the current practice obligates the bearing capacity of micropile to be obtained from skin friction of only rock-socketing area, in which it implies the frictional resistance of upper soil layer is ignored in the design process. In this paper, a new micropiling method and its verification studies via field installation are presented. The new method provides a specific way to grout bore-hole to increase frictional resistance between surrounding soil and pile-structure and it allows to consider the skin friction of micropiles for upper soil layer during design process.

  • PDF

Calculation of Load on Jacket Leg during Float-over Installation of Dual Topsides using Single Vessel (단일 설치선을 사용한 2기 해양플랜트 Topside Float Over 설치 시 Jacket Leg의 하중 계산)

  • Bae, Dong-Yeol;Lee, Seung-Jae;Lee, Jaeyong
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.2
    • /
    • pp.135-142
    • /
    • 2015
  • The float over method is the most preferred method for installing heavy topside onto a jacket platform. A very complex platform with multiple jacket structures on a specific field requires multiple installation procedures. This study validated the installation of two topsides using a single installation barge to reduce the operation and installation cost. The hydrodynamic properties of the installation barge during the installation of two topsides were calculated. The tension and fender forces during docking were investigated to show the validity of the proposed dual topside installation method. In conclusion, the operational safety of the proposed procedure was validated through the calculation of the motion of the installation vessel and loads on the jacket legs.

Interpretational Consideration of Geosynthetics Shear Behaviors (지오신세틱스 전단거동의 해석학적 고찰)

  • Jeon, Han-Yong;Kim, Cho-Rong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.293-302
    • /
    • 2010
  • 2 types of geogrids and geotextiles was used to evaluate shear behaviors after installation damage test. Shear behaviors were compared after installation damage test and coefficient of resistance to direct sliding($f_{ds}$) was estimated by theoretical shear analysis. Shear strength of damaged geogrid decreased under high normal stress of 150kPa and shear strength of geotextile decreased with increasing normal stress. It is seen that $f_{ds}$ values after installation damage decreased than before installation damage through comparison calculated $f_{ds}$ by direct theoretical shear analysis. $f_{ds}$ values to be calculated by theoretical shear analysis were changed with before and after installation damage.

  • PDF

Strategic Vitalization Method of AMP Installation through SWOT/AHP Analysis (SWOT/AHP 분석을 통한 전략적 AMP 설치 활성화 방안)

  • Kim, In-Ho;Lee, Kang-Won
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.49-60
    • /
    • 2019
  • Recently the concentration of fine dust and ultra fine dust becomes so bad, which seriously threatens the health and even the life of people. So, government started to investigate several ways to reduce the amount of fine dust and ultra fine dust. From a few years ago it has been known that ships anchored at port emit a lot of pollution and seriously affect air quality of neighboring cities. To reduce the pollution emitted by ship AMP (Alternative Maritime Power Supply) has been proposed, which uses the electricity instead of bunker C oil or diesel. Many developed countries already installed AMP to improve air quality in port area. Korea is in the stage of planning to install AMP at port. However, there are many complicated problems to be handled before AMP installation. Due to huge initial cost and long period of construction ship owner and habour operating company are reluctant to AMP installation. And there are serious technological difficulties in constructing AMP in existing harbour. Lack of AMP core technology and operational difficulties of AMP are also big challenges to be conquered. In this study SWOT/AHP method is used to find strategic and efficient ways to handle above complicated challenges and then to vitalize the AMP installation.

An optimum design of on-bottom stability of offshore pipelines on soft clay

  • Yu, Su Young;Choi, Han Suk;Lee, Seung Keon;Do, Chang Ho;Kim, Do Kyun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.4
    • /
    • pp.598-613
    • /
    • 2013
  • This paper deals with the dynamic effect of pipeline installation and embedment for the on-bottom stability design of offshore pipelines on soft clay. On-bottom stability analysis of offshore pipelines on soft clay by DNV-RP-F109 (DNV, 2010) results in very unreasonable pipe embedment and concrete coating thickness. Thus, a new procedure of the on-bottom stability analysis was established considering dynamic effects of pipeline installation and pipe-soil interaction at touchdown point (TDP). This analysis procedure is composed of three steps: global pipeline installation analysis, local analysis at TDP, modified on-bottom stability analysis using DNV-RP-F109. Data obtained from the dynamic pipeline installation analysis were utilized for the finite element analysis (FEA) of the pipeline embedment using the non-linear soil property. From the analysis results of the proposed procedure, an optimum design of on-bottom stability of offshore pipeline on soft clay can be achieved. This procedure and result will be useful to assess the on-bottom stability analysis of offshore pipelines on soft clay. The analysis results were justified by an offshore field inspection.