Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.4
/
pp.116-125
/
2015
This paper presents experimental results obtained from actual installation conditions of surge protective devices (SPDs), with the aim of understanding the coordination of cascaded Class I and Class II SPDs. This paper also proposes effective methods for selecting and installing coordinating cascaded SPDs. The residual voltage of each SPD and the energy sharing of an upstream Class I tested SPD and a downstream Class II tested SPD were measured using a $10/350{\mu}s$ current wave. In coordinating a cascaded voltage-limiting SPD system, it was found that energy coordination can be achieved as long as the downstream SPD is a metal oxide varistor with a higher maximum continuous operating voltage than the upstream SPD; however, it is not the optimal condition for the voltage protection level. If the varistor voltage of the downstream SPD is equal to or lower than that of the upstream SPD, the precise voltage protection level is obtained. However, this may cause serious problems with regard to energy sharing. The coordination for energy sharing and voltage protection level is fairly achieved when the cascaded SPD system consists of two voltage-limiting SPDs separated by 3 m and with the same varistor voltage.
Lee, Sang-ik;Choi, Jin-yong;Sung, Seung-joon;Lee, Seung-jae;Lee, Jimin;Choi, Won
Journal of The Korean Society of Agricultural Engineers
/
v.62
no.5
/
pp.63-72
/
2020
Solar-sharing, which is an agricultural photovoltaic system installing solar panels on the upper part of crop growing field, has especially drawn attention. Because paddy fields for cultivating crops are large flat areas, there have been various attempts to utilize solar energy for solar photovoltaic as well as growth of crops in agriculture. Solar-sharing was first proposed in Japan, and has been actively studied for optimization and practical uses. The domestic climate differs from the climate conditions in which the solar-sharing has been widely studied, therefore, it is required to develop the solar-sharing technology suitable for the domestic climate. In this study, a simulation model was developed to analyze the change of solar radiation resulted from the solar-sharing installation. Monthly solar illumination intensity and the change of illumination intensity according to the various conditions of solar panel installation were simulated. The results of monthly illumination analysis differed by altitude of the sun, which was related to season. In addition, it was analyzed that the monthly illumination decreased by up to 42% due to solar-sharing. Accordingly, it is recommended that solar-sharing should be installed as a way to maximize the efficiency of solar photovoltaic system while minimizing the decrease in solar radiation reaching the crops.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.65-70
/
2005
In this study, the large scale model tests were executed to estimate the Load Sharing Ratio(LSR) of raft in a piled footing under various conditions. The conditions such as the subsoil type, pile length, pile spacing, array type and pile installation method etc. were varied in the pile loading tests about the free-standing group piles and a piled footing. As the results of this study, it was found that there were no differences of the load-settlement curves, along with the pile installation method and subsoil type. The piles supported most of the external load until a yielding load of the piled footing, but the raft supported a considerable load after a yielding load. And it was also found that the LSR didn't be affected by the pile installation method and the subsoil type. As the relative density of sands increased, the LSR decreased. As the pile spacing was wider and the pile length increased, there was a tendancy for the LSR to increase.
Proper installation of Flexible AC Transmission Systems (FACTS) devices in existing transmission networks can enable power systems to accommodate more power transfer with less network expansion cost. The problem to maximize transmission system loadability by determining optimal locations and settings for installations of two types of FACTS devices, namely static var compensator (SVC) and thyristor controlled series compensator (TCSC), is formulated as a mixed discrete-continuous nonlinear optimization problem (MDCP). For solving the MDCP, in the paper, the proposed method with fitness sharing technique involved in the updating process of the particle swarm optimization (PSO) algorithm, can diversify the particles over the search regions as much as possible, making it possible to achieve the optimal solution with a big probability. The modified IEEE-14 bus network and a practical power system are used to validate the proposed method.
Ku, Bok-Jae;Kim, Hyo-Seon;Park, Sung-Jun;Park, Seong-Mi
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.9
/
pp.73-82
/
2014
This research proposes a new type of flyback converter topology based on magnetic circuit sharing. The proposed flyback topology uses a transformer involving shared magnetic flux, and its characteristic is magnetic flux cancelation by cross magnetic flux in the magnetic flux-sharing part of the core. The new topology aims to reduce the volume of transformer by reducing the cross section of the core. Compared to conventional converters using only 1 transformer, its circuit configuration involving the serial input and parallel output of 2 flyback coils allowed increased converter insulation strength. In addition, the adoption of interleaved switching method achieved the improvement of output voltage ripple, while magnetic circuit sharing reduced by 50% the cross section of core where magnetic circuit was shared.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.18
no.3
/
pp.74-80
/
2004
If the withdrawal force of strand driven roll which is controlled with predetermined speed isn't distributed regularly in continuous casting process, mold level is changed cyclically and slab quality is not good. In this paper, both casting speed control and load sharing control algorithm of strand driven roll according to ratio which is set up by operator at same time is proposed. The proposed algorithm is to share the withdrawal force by following torque current of each driven roll as average torque current by changing speed reference of each driven roll motor. The load sharing control with anti-wind up for improvement transient state is adopted and the proposed algorithm is implemented in POSCO pilot caster.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.5
/
pp.95-103
/
2013
Protection of the electrical and electronic equipment against surges in low voltage AC power distribution systems is based on wide applications of surge protective devices(SPDs). Cascade application of SPDs located at the service entrance of a building and near sensitive equipment is intended to ensure the optimal voltage protection level and energy sharing among cascade SPDs. In this paper, when surges impinge at the service entrance of the building of interest, the protection characteristics of two-stage cascade SPD systems were investigated. The influence of the distance between the upstream and downstream SPDs on the voltage protection level and energy sharing of the two-stage cascade SPD systems were analyzed experimentally. It was found that the energy sharing of two-stage cascade SPD systems strongly depends on the distance between the two SPDs and the component of SPD. As the distance between the two SPDs increases, the energy absorbed by the upstream SPD increases while the energy absorbed by the downstream SPD decreases. Consequently, it is desirable to select the upstream and downstream SPDs having the proper energy capability with due consideration of the distance between the two SPDs.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.6
/
pp.91-98
/
2014
For the purpose of designing and applying the optimum surge protection scheme, multi-stage coordinated surge protective device(SPD) system is suitable to successfully fulfill its tasks; first, to divert a large amount of the transient energy, second, to clamp the overvoltage to the level below the withstand impulse voltage of the equipment to be protected. The length of SPD connecting leads shall be as short as possible. Long connecting leads will degrade the protection effect of SPDs. In this paper, the influences of the length of connecting leads on the energy sharing in a coordinated SPD system were investigated experimentally, and the simulation of determining the energy sharing and protection voltage level of each SPD depending on the length of connecting leads was carried out by using P-spice program. It was confirmed that the protection voltage level and energy sharing in coordinated SPD systems are strongly influenced by the length of connecting leads.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.2
/
pp.29-35
/
2013
For the purpose of designing and applying optimum surge protection, one of the essential points is to take into account the energy coordination between cascaded surge protective devices(SPDs) and it is important to obtain an acceptable sharing of the energy stress between two cascaded SPDs. In this paper, in case of two voltage-limiting SPDs connected in parallel, the amount of splitting impulse current and energy that flow through each SPDs is investigated as a function of the protective distance. As a result, the energetic coordination between cascaded SPDs is strongly dependent on the voltage protection level of SPDs and the protective distance. It was confirmed that the sharing of the energy between two cascaded SPDs and the limited voltage levels are appropriate when the voltage protection levels of both upstream and downstream SPDs are the same.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2000.11a
/
pp.173-178
/
2000
The time sharing type high frequency inverter using serial-parallel resonant to give VVVF function in the inverter used as power source of induction heating at high frequency is presented in this paper. This proposed inverter can reduce distribution of the switching current because of using the current of serial resonant circuit to the input current of the parallel one. The analysis of the proposed circuit is generally described by using the normalized parameters. Also, according to the calculated characteristics value, a method of the circuit design and operating characteristics of the inverter is proposed. In addition, this paper proves the validity of theoretical analysis through Simulation. This proposed inverter show that it can be practically used in future as power source system for induction heating application, DC-DC converter etc.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.