• Title/Summary/Keyword: Installation guide

Search Result 147, Processing Time 0.024 seconds

A study on the improvement for installation guide of soundproofing facilities in construction site (공사장 방음시설 설치기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.361-367
    • /
    • 2013
  • Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.

Application Method Analysis at Voltage Drop Calculations on Low Voltage Feeder by IEC Standard (국제 표준에 따른 저압간선 전압강하 계산시 적용 방법 고찰)

  • Kim, Gi-Hyun;Lee, Ju-Chul;Choi, Young-Kyu;Kim, Han-Soo;Lee, Young-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.6
    • /
    • pp.53-58
    • /
    • 2012
  • A conductor has been produced according to IEC standard and low voltage electrical facility has been installed according to IEC 60364. But because of many related and varied standards, it is difficult to apply to design and inspect for electrical equipment. We researched the necessity of design guide which is detailed and systematization from survey. For detailed design guide, we suggest application method and review items at calculations for voltage drop calculations on low voltage feeder by IEC 60364, BS 7671 standard and Consumer's Electrical Installation Guide.

Study on Offshore Stabbing Guide design (해양 스태빙 가이드 설계 고찰)

  • 조철희;홍성근
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.69-77
    • /
    • 1999
  • The stabbing guide is often used to guide an add-on pile into an existing pile in offshore jacket installation. It provides a pile alignment for a welding tie-in in static condition as well. Even stabbing guide is an essential component in pile installation, it is not considered as a permanent offshore structure. In this regard, there is not a define design guideline proposed. In API RP 2A WSD, it briefly define the design considerations of stabbing guide. The failure of stabbing guide can cause a greate economical loss and a serious impact to the project schedule. Stabbing guide design should consider many factors considering actual work conditions for both static and dynamic situations. In the paper, a design method is proposed by appling the plate theory and it is confirmed numerically with FEM modeling. The geometry of stabbing guide is assumed as a cylinder shape with various wall thickness and effective length. The various thickness, effective length and pile size are compared for stable stabbing guide design.

  • PDF

Analysis of Factors Increasing Construction Cost for the Curtain-wall Accompanied by the Installation of a Guide Rail for High-rise Building Maintenance (초고층 외벽 유지관리용 Guide Rail 설치에 따른 커튼월 공사비 증가요인 분석)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.97-98
    • /
    • 2011
  • The number of high-rise buildings has increased year after year, with there currently being 5 projects in progress to construct buildings higher than 100 stories in Seoul alone. The construction cost for such high-rise buildings is significantly higher than the cost for a conventional low-rise building, while maintenance costs are expected to be two to three times higher. To reduce the maintenance cost of a high-rise building, there is the need for a guide rail to be used for maintenance, which is why there is the need for research on the guide rail system. For this reason, as preliminary research to develop a guide rail, this study aims to derive the factors increasing construction cost by taking the installation of a guide rail into account. This is expected to lay the groundwork for the design and construction of guide rails for high-rise building maintenance.

  • PDF

A 10-year follow-up study on clinical outcomes of dental implant rehabilitation using surgical guide

  • Haoyun Li;Mi Young Eo;Kezia Rachellea Mustakim;Soung Min Kim
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.50 no.2
    • /
    • pp.70-79
    • /
    • 2024
  • Objectives: The surgical guide is a static computer-assisted device used for implant surgery planning and guidance. By taking an impression and referring to the patients' three-dimensional computed tomography scan of the desired implant site, a surgical guide can be created. During surgery, the surgical guide aids in achieving the designed implant placement position and direction. We examined and evaluated the long-term clinical outcomes of implant surgery using surgical guides. Materials and Methods: This study investigated a total of 15 patients with 32 implants that were placed using surgical guides from 2009 to 2011 with a mean follow-up period extended beyond 10 years. Patient demographics and implant survival rates were recorded. We analyzed marginal bone loss (MBL) by assessing the radiographs acquired at installation, three months after installation, and one month, one, two, and five years after prosthesis delivery. Results: The mean patient age was 57.33 years at implant placement. Of the 32 implants, five implants were placed in the anterior region and 27 implants were in the posterior region. Six implants failed and three of them were replaced, resulting in an 81.25% survival rate. The mean follow-up period was 10 years and nine months. Mean MBL compared to post-installation was significantly higher than at three months after installation, and one month, one, two, and five years after prosthesis delivery. Mean MBL at three months after installation, and one month, one year, and two years were significantly higher compared to the previous visit (P<0.05). However, MBL at five years after prosthesis delivery did not differ significantly compared to at two years. Conclusion: In this study, implant rehabilitation assisted by surgical guides exhibited favorable survival rates. With the limitation of the sample amount in this study, further research and more samples are required to evaluate the long-term clinical effectiveness of surgical guides.

A Study on Outage Restoration Guide Including Load Cutoff in Distribution System (부하차단을 포함한 배전계통 정전복구방안에 관한 연구)

  • 김세호
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.1
    • /
    • pp.98-104
    • /
    • 2004
  • This paper represents the fast and efficient load transfer guide for fault or outage restoration in distribution system. For restoration guide, system trace is performed to reverse direction(source side) from tie breaker in tree-structured distribution network. Search space and breaker's combinational number for restoration guide are greatly reduced. It is proposed the load transfer method including first stage restoration(single load transfer, double load transfer, triple load transfer), second stage restoration(transferring load to neighboring feeder in order to expand the capacity margin) and load cutoff guide. The proposed method can be easily applied to primary customer restoration, multi-fault recovery and distribution automation system.

Influence of guide vane shape on the performance and internal flow of a cross flow wind turbine

  • Son, Sung-Woo;Singh, Patrick Mark;Choi, Young-Do
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.2
    • /
    • pp.163-169
    • /
    • 2013
  • In order to make the vertical-axis cross flow wind turbine commercially feasible, a guide vane is adopted and the effect of the guide vane shape is examined in order to improve the wind turbine performance. CFD analysis on the performance and internal flow of the turbine is carried out for the wind turbine model. The result shows that when the guide nozzle is installed, almost over two times of power coefficient are achieved in comparison with the case of no guide nozzle installation. The guide nozzle acts as a role of suppressing the flow resistance at the blade passage, which is found when the guide nozzle is installed. Moreover, in this study, two kinds of the guide vane with a straight type and a curved type are adopted and compared. The curved guide vane nozzle produces higher power coefficient in comparison with that of straight guide vane nozzle.

A Study on the Present State and Consistent use of Terminologies Concerning Grounding (접지에 관한 용어의 실태와 일관성 있는 사용을 위한 고찰)

  • Lee, Bok-Hee;Lee, Kang-Hee;Kim, Tae-Ki;Kim, Han-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.81-87
    • /
    • 2013
  • A grounding scheme is one of important parts in protection for safety of electrical installations. Terminologies are successively creating and gradually increasing due to diversity and external environments. The declaration and definition of terminologies concerning grounding are in disorder in several KS standards, electrotechnical provisions for electrical installations and electrotechnical guides related to electrical installations. There seem to be serious confusions in use among technicians and experts. In this paper, we proposed a new scheme and system to consistently use the technical terms concerning grounding described in KS standards and technical provisions. Different use examples and the present state of terminologies on grounding described in Korean documents such as KS IEC standards, technical provisions for electrical installations, consumer's electrical installation guide, and etc are investigated. Although the scope of this work is limited to examine the terminologies on grounding, it is expected that the proposed method could be contributed to the consistent use of terminologies in all areas in KS C IEC standards and technical provisions for electrical installations.

Heat/Mass Transfer for Impingement/Effusion Cooling System with Circular Guide (원형가이드 설치에 따른 충돌제트/유출냉각에서 열/물질전달 특성)

  • Hong, Sung-Kook;Cho, Hyung-Hee
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.30 no.12 s.255
    • /
    • pp.1147-1154
    • /
    • 2006
  • An experimental investigation was conducted to enhance the heat/mass transfer for impingement/effusion cooling system when the initial crossflow was formed. For the improvement of heat transfer, the circular guide is installed on the injection hole. At the fixed jet Reynolds number of 10,000, the measurements were carried out for blowing ratios ranging from 0.5 to 1.5. The local heat/mass transfer coefficients on the effusion plate are measured using a naphthalene sublimation method. The result presents that the circular guide protects the injected jet from the initial crossflow, increasing the heat/mass transfer. The heat transfer of stagnation region is hardly changed regardless of the blowing ratio. The secondary peak is obviously formed by flow transition to turbulent flow. At high blowing ratio of 1.5, the circular guide produces $26{\sim}30%$ augmentation on the averaged heat/mass transfer while the case without circular guide leads to the low and non-uniform heat/mass transfer. With the increased heat/mass transfer, the installation of circular guide is accompanied by the increase of pressure loss in the channel. However, the pressure drop caused by the circular guide is lower than that for other cooling technique with the circular pin fin.