• Title/Summary/Keyword: Installation Projects

검색결과 164건 처리시간 0.026초

비정형 콘크리트 패널의 수학적 알고리즘을 이용한 생산-설치 데이터 생성모델 기초연구 (A Basic Study on Data Estimation Model of Production-installation Using Mathematical Algorithm in Free-Form Concrete Panel)

  • 손승현;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.166-167
    • /
    • 2016
  • Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.

  • PDF

올라퍼 엘리아슨의 설치 작품에 나타난 공간 경험 및 디자인 방법 - 인간, 환경 사이의 관계성을 중심으로 - (Spatial Experience and Design Method in the Installation Projects of Olafur Eliasson - Focusing on Relationship between Human and Surrounding -)

  • 이송학;김종진
    • 한국실내디자인학회논문집
    • /
    • 제23권5호
    • /
    • pp.33-40
    • /
    • 2014
  • The Danish-Icelandic artist, Olafur Eliasson who was born in 1967 is known for installation projects employing materials such as colour, fog, mirror and light to rethink the relationship between human and surrounding. Since he started the early projects, Eliasson has been interested in the relationship between an art, a viewer and space. He has used the medium from nature because he thought nature is very common subject to derive new idea of relationship between human and surrounding. Eliasson revealed the idea of relationship between human and surrounding by three characteristics of spatial design such as 'reinterpretation of placeness by juxtaposition of mediums and defamilarization', 'ambiguity and extensity of depth distance of space by mediums' and 'change in spatiality by movement of viewers and time'. This paper focused on four case projects : The mediated motion in 2001, The weather project in 2003, The blind pavilion in 2003, Your rainbow panorama in 2011. It is aimed to discover relationship between human and surrounding in the case projects under three characteristics. This study found that three characteristics were differently applied in the case projects in terms of spatial experience and design methods. Inside & outside locations, formal quality, visual-perceptual relationships in and around each case are crucial elements and tools. The unique relationship between human and surrounding of Eliasson and three characteristics are applicable to architecture and spatial design.

한국 태양광발전사업의 에너지균등화비용(LCOE) 추정: 재무적투자자 참여사업을 대상으로 (Estimation of LCOE for Korean PV Projects : For the Ones that Financial Investors Participated in)

  • 김영경;장병만
    • 신재생에너지
    • /
    • 제8권3호
    • /
    • pp.23-29
    • /
    • 2012
  • LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1 MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.

Feasibility Analysis for Introducing ESCO Program of LED Luminaire Replacements in Schools

  • Shin, Hyunman;Jang, Woojin
    • 조명전기설비학회논문지
    • /
    • 제30권1호
    • /
    • pp.8-13
    • /
    • 2016
  • Public institutions should replace their luminaires with LED lighting by 2020 to save energy. Because the LED lighting installation rate in schools has not yet reached the legal goal, the ESCO program feasibility was investigated. The amount of electricity used, electric rates, times of use in classrooms and fluorescent lighting maintenance costs etc., as well as the elements of lighting maintenance were analyzed. In the case of schools, the lamp usage time was so short that the ESCO projects with only energy savings were impossible. In order to execute the ESCO projects, the maintenance cost savings by replacing an existing luminaire should be considered and the introduction of the relatively cheaper tube type LED lamp than the flat type LED luminaire was required.

해안개발사업의 부유토사 저감방안의 현황 및 개선방안 - 오탁방지막을 중심으로 - (Status and Improvement of the Mitigation Option to the Suspended Sediments in Coastal Development Projects - Focused on Silt Protector -)

  • 맹준호;조광우;주용준
    • 환경영향평가
    • /
    • 제15권5호
    • /
    • pp.289-297
    • /
    • 2006
  • The study investigates the problems of silt protector used for mitigation measure of suspended sediments (SS) during coastal construction and provides their improvements based on the field investigation and analysis of the environmental impact assessment reports for the coastal development projects of Korea. The field investigation along west, east and south coasts of Korea reveals a variety of problems in the installation and management of silt protector solely used for the SS mitigation in Korea. Major problems include installation itself, low cost and quality of silt protector, and maintenance. These problems superimpose the effectiveness of silt protector in mitigating coastal environment impact. The present study provides the specific guideline on the project type needed for the installation of silt protector, installation standard and planning, maintenance and management. The study also suggests new mitigation options such as environmental window to limit the construction period and environmental dredger to compensate for the deficits of silt protector.

A Study on Constructing Common Database for Supporting Urban Rail Transit Project

  • Lee, Young-Hoon;Lee, Jae-Chon
    • 조명전기설비학회논문지
    • /
    • 제23권11호
    • /
    • pp.44-51
    • /
    • 2009
  • A variety of Urban Rail Transit (URT) systems have been operating and they have different technology bases, causing a lot of difficulties in taking measures against trouble, training, upgrading, interoperability and so on. As such, a standardization project has been carried out to solve the problems by setting up the national standards for URT systems. A common database was built to provide the integrated engineering environment to the community of URT project. This paper discusses the design of the database and how it can be utilized in the successful promotion of the project. The products of the projects are stored into the database with traceability management to be referred to by other new URT projects for reusing and sharing the acquired knowledge through cross organizations.

설치미술의 조형적 사고와 표현특성 (The Artistic Thinking and Expressive Characteristics of Installation Art)

  • 김주미
    • 한국실내디자인학회논문집
    • /
    • 제26호
    • /
    • pp.104-111
    • /
    • 2001
  • This study deals with the expressive characteristics of Installation Art and their applicability to environmental design, and as such, aims to specify a artistic methods from the contemporary art. What Installation Art is search of in their works is "the state of relationships" which is "to replace the concept of form with that of structure, and the concept of space with that of the environment" that is, the terms of relations in the overall environment of time and space. Installation Art essentially relies on a multiplicity of forms and attitudes leading to projects which positively make use of "spatial-temporal process" to reaffirm and "problematise" their open-endedness manifest in complex contextuality and shifting temporality. This study presents a new interpretation of spatial-temporal dimension, site-specificity, and intermedia art that we find in Installation Art and tries to combine that new artistic insight a with environmental design to provide a basis for integrated art. This study places a great emphasis on the interdisciplinary approaches to the environment we inhabit, which I hope will contribute to generating a greater number of creative possibilities for environmental design.

  • PDF

Hybrid wind-solar power deployment in India: Green Energy Open Access (GEOA) and Renewable Energy Certificates (REC)

  • Hardik K. Jani;Surendra Singh Kachhwaha;Garlapati Nagababu;Alok Das
    • Advances in Energy Research
    • /
    • 제8권4호
    • /
    • pp.243-252
    • /
    • 2022
  • The hybrid wind-solar energy concept has a big influence on the spread of wind and solar power projects in India since it combines the benefits of both industries while also providing extra benefits such as resource sharing such as land, infrastructure, and power evacuation systems. Furthermore, while the hybrid policy may reduce certain barriers to the installation of wind and solar energy in India, there are still some issues that must be resolved rapidly in order to ensure a sustainable installation. According to the study's findings, the installation of wind and solar power plants is significantly influenced by energy policy. The wind-solar hybrid energy strategy will also be crucial in the near future for growing the usage of renewable energy sources. Aside from that, the establishment of Green Energy Open Access (GEOA) and the restart of the trading of Renewable Energy Certificates (REC) would promote the quick deployment of standalone and hybrid renewable power projects throughout the nation, enabling it to reach 500 GW of installed non-fossil energy capacity by 2030.

A Study on the Sustainable Features of Realized and Planned Floating Buildings

  • Moon, Chang-Ho
    • 한국항해항만학회지
    • /
    • 제36권2호
    • /
    • pp.113-121
    • /
    • 2012
  • According to the climate change and the improvement of income level, floating building on water has been emerging as a strong alternative. This study was intended to suggest some reference materials of sustainability for new floating building projects. The concept of sustainability and floating building was investigated, and 3 realized projects and 3 planned projects were reviewed in terms of sustainability. Sustainable features of the sample projects can be summarized as recycled and relocatable usage, adoption of various renewable energy techniques, installation of self-supporting plant, application of modular system and others like new material & open layout. Sustainable features need to be developed more and more in detail and applied to many types of floating buildings.

Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF