• Title/Summary/Keyword: Inspection Planning

Search Result 220, Processing Time 0.021 seconds

Establishment of Preventive Maintenance Planning for Generation Facility Considering Cost (비용을 고려한 발전설비의 예방유지보수 계획 수립)

  • Kim, Hung-Jun;Shin, Jun-Seok;Kim, Jin-O;Kim, Hyung-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.328-333
    • /
    • 2007
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for tm based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM In this paper, a Markov state model much can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

  • PDF

Development of an Operation Software for the ASRI-FMS/CIM (ASRI-FMS/CIM 을 위한 운용 소프트웨어의 구축)

  • Park, Chan-Kwon;Park, Jin-Woo;Kang, Suk-Ho
    • IE interfaces
    • /
    • v.6 no.2
    • /
    • pp.53-65
    • /
    • 1993
  • This paper deals with the development of a software module for production planning and scheduling activities of an existing Flexible Machining and Assembly System (FMAS). The Production Planning Module uses the hierarchical and sequential scheme based on "divide and conquer" philosophy. In this module, routes are determined based on the production order, orders are screened, tools are allocated, and order adjustments are executed according to the allocated tools. The Scheduling Module allocates the resources, determines the task priority and the start and completion times of tasks. Re-scheduling can be done to handle unforeseen situations such as lumpy demands and machine breakdowns. Since all modules are integrated with a central database and they interface independently, it is easy to append new modules or update the existing modules. The result of this study is used for operating the real FMAS consisting of a machining cell with 2 domestic NC machines and a part feeding robot, an assembly cell with a conveyor and 3 robots, an inspection cell, an AGV, an AS/RS, and a central control computer.

  • PDF

Development of Pre-Service and In-Service Information Management System (iSIMS) (원전 가동전/중 검사정보관리 시스템 개발)

  • Yoo, H.J.;Choi, S.N.;Kim, H.N.;Kim, Y.H.;Yang, S.H.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.24 no.4
    • /
    • pp.390-395
    • /
    • 2004
  • The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro & Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS.

Development of Weld Examination Management System in NPP (원자력발전소 용접부 검사 관리시스템 개발)

  • 최성남;유현주;김세경;황원걸
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.299-301
    • /
    • 2004
  • Weld examination is one of the most important processes to ensure the integrity of facilities of Nuclear Power Plants. Weld examination must be the implemented based on the approved plan, the qualified examiners and equipments. Weld examination management system provides functionalities for planning of inspection, reporting the examination results, and managing the examiners and equipments.

  • PDF

Sample Size Determination and Evaluation of Form Errors

  • Chang, Sung Ho;Kim, Sunn Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.3
    • /
    • pp.85-98
    • /
    • 1994
  • In current coordinate measuring machine practice, there are no commonly accepted sample sizes for estimating form errors which have a statistical confidence. Practically, sample size planning is important for the geometrical tolerance inspection using a coordinate measuring machine. We determine and validate appropriate sample sizes for form error estimation. Also, we develop form error estimation methods with certain confidence levels based on the obtained sample sizes in various form errors: straightness, flatness, circularity, and cylindericity.

  • PDF

BrDSS: A decision support system for bridge maintenance planning employing bridge information modeling

  • Nili, Mohammad Hosein;Zahraie, Banafsheh;Taghaddos, Hosein
    • Smart Structures and Systems
    • /
    • v.26 no.4
    • /
    • pp.533-544
    • /
    • 2020
  • Effective bridge maintenance reduces bridge operation costs and extends its service life. The possibility of storing bridge life-cycle data in a 3D parametric model of the bridge through Bridge Information Modeling (BrIM) provides new opportunities to enhance current practices of bridge maintenance management. This study develops a Decision Support System (DSS), namely BrDSS, which employs BrIM and an efficient optimization model for bridge maintenance planning. The BrIM model in BrDSS extracts basic data of elements required for the optimization process and visualizes the inspection data and the optimization results to the user to help in decision makings. In the optimization module of the DSS, the specifically formulated Genetic Algorithm (GA) eliminates the chances of producing infeasible solutions for faster convergence. The practicality of the presented DSS was explored by utilizing the DSS in the maintenance planning of a bridge under operation in the southwest of Iran.

Building Commissioning Management Framework from the Case Study of Green Building (녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출)

  • Jeong, Jin-Hak;Park, So-Yeon;Song, Dong-Hun;Ahn, Yong-Han
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

Comparison of regression model and LSTM-RNN model in predicting deterioration of prestressed concrete box girder bridges

  • Gao Jing;Lin Ruiying;Zhang Yao
    • Structural Engineering and Mechanics
    • /
    • v.91 no.1
    • /
    • pp.39-47
    • /
    • 2024
  • Bridge deterioration shows the change of bridge condition during its operation, and predicting bridge deterioration is important for implementing predictive protection and planning future maintenance. However, in practical application, the raw inspection data of bridges are not continuous, which has a greater impact on the accuracy of the prediction results. Therefore, two kinds of bridge deterioration models are established in this paper: one is based on the traditional regression theory, combined with the distribution fitting theory to preprocess the data, which solves the problem of irregular distribution and incomplete quantity of raw data. Secondly, based on the theory of Long Short-Term Memory (LSTM) Recurrent Neural Network (RNN), the network is trained using the raw inspection data, which can realize the prediction of the future deterioration of bridges through the historical data. And the inspection data of 60 prestressed concrete box girder bridges in Xiamen, China are used as an example for validation and comparative analysis, and the results show that both deterioration models can predict the deterioration of prestressed concrete box girder bridges. The regression model shows that the bridge deteriorates gradually, while the LSTM-RNN model shows that the bridge keeps great condition during the first 5 years and degrades rapidly from 5 years to 15 years. Based on the current inspection database, the LSTM-RNN model performs better than the regression model because it has smaller prediction error. With the continuous improvement of the database, the results of this study can be extended to other bridge types or other degradation factors can be introduced to improve the accuracy and usefulness of the deterioration model.

A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan (전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로)

  • Sung, Hyun-Chan;Kim, Kwi-Gon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF

The Study on NCS Development for the Production of Hanbok (한복생산 분야의 국가직무능력표준 개발에 관한 연구)

  • Suh, Seunghee;Kim, Jung-Sook
    • Journal of the Korean Society of Costume
    • /
    • v.65 no.2
    • /
    • pp.62-74
    • /
    • 2015
  • The purpose of this research is to analyse the process of development and verification of 'National Competency Standards' of Hanbok production, which was carried out in 2013 for the fashion industry. As the result of this research, the definition of the duty in Hanbok production is 'to conduct a series of step-by-step processes of planning and developing fabric and design, then making pattern, cutting fabric and sewing.' The competency unit for Hanbok production is analyzed in 10 categories: analysis of market trends, design plan, production and manipulation of fabric, production process plan, sample making, pattern making, cutting out, sewing, finishing sewing, inspection of the product quality. Competency unit elements of each competency unit are as follows. 1) analysis of market trends: to research market trend resources, to analyse consumers' buying trend, to analyse industry changes, 2) design plan: to develop design, to plan fabrication, to draw flats, 3) production and manipulation of fabric: to develop fabric planning, to prepare fabric manipulation, to conduct fabric manipulation, 4) production process plan: to grasp design, to plan sewing method, to prepare a specification sheet, 5) sample making: to make a sample pattern, to cut sample fabrics, to sew sample, to finish sample making, 6) pattern making: to measure body, to make production pattern, to adjust production pattern, 7) cutting out: to care fabrics, to lay out patterns, to cut out fabrics, 8) sewing: to sew a garment, to sew a lining, to attach a lining, 9) finishing sewing: to neaten edges, to attach trims, to press to finish, 10) inspection of the product quality: to confirm correspondence with the specification sheet, to inspect appearance.