• 제목/요약/키워드: Inspection Planning

검색결과 220건 처리시간 0.024초

한국형 위험기반검사(K-RBI) 프로그램 개발 (Development of Program for K-RBI)

  • 권혁면;임대식
    • 대한기계학회논문집A
    • /
    • 제30권1호
    • /
    • pp.90-96
    • /
    • 2006
  • Since Risk Based Inspection(RBI) was introduced to quality the risks for jet engine and nuclear power, the technique has been expanded to the area of petrochemical plant. Recently among USA and Europe, window-based computer programme for RBI has been rapidly developed. When local companies procure such program to apply to their plants, it is difficult to build up a proper database as well as expect a good result. In this regards, K-RBI programme accustomed to Korean environments was developed. After completion of the programme in 2004, it was tested by 2 local petrochemical plants and was produced fruitful results. By using these programme, we are expecting accident prevention through risk based planning and implementing of equipment inspection, and saving dollars caused by procuring foreign expensive programme.

서비스 고정비용을 고려한 복수제품 품질시스템의 설계 (Design of A Quality System for Multi-Products with the Fixed Costs for Products Servicing)

  • 김성철
    • 한국경영과학회지
    • /
    • 제29권4호
    • /
    • pp.61-72
    • /
    • 2004
  • In this paper, we design sampling inspections and service capacities simultaneously for multi-products. Particularly, we extend Kim(2003) by introducing the fixed cost of providing services. We show that, due to the fixed cost considered, the cost function of a product is no longer linear or convex in terms of the level of service provision, and the total inspection is prefered to the small level of service capacity which results in high burden of the fixed cost. And we develop a simple framework to deal with this joint design problem for a product. Also we consider the problem of allocating the given number of the total service capacities among products. A dynamic programming algorithm is developed to determine the optimal allocation which minimizes the overall total cost of the system and the optimal allocation can be obtained with the considerably smaller computations than the total number of possible allocations. The results can be used to support planning decisions and to aid the joint design of inspections and service capacities for products.

Using System Reliability to Evaluate and Maintain Structural Systems

  • Estes, Allen C.;Frangopol, Dan M.
    • Computational Structural Engineering : An International Journal
    • /
    • 제1권1호
    • /
    • pp.71-80
    • /
    • 2001
  • A reliability approach to evaluate structural performance has gained increased acceptability and usage over the past two decades. Most reliability analyses are based on the reliability of an individual component without examining the entire structural system. These analyses often result in either unnecessary repairs or unsafe structures. This study uses examples of series, parallel, and series-parallel models of structural systems to illustrate how the component reliabilities affect the reliability of the entire system. The component-system reliability interaction can be used to develop optimum lifetime inspection and repair strategies for structural systems. These examples demonstrate that such strategies must be based on the reliability of the entire structural system. They also demonstrate that the location of an individual component in the system has a profound effect on the acceptable reliability of that component. Furthermore, when a structure is deteriorating over time, the reliability importance of various components is a1so changing with time. For this reason, the most critical component in the early life of the structure may not tie the most critical later.

  • PDF

도시철도에서의 적정 역간거리에 관한 연구 (A Study on Proper Station Spacing in Urban Railway)

  • 김강석;성기한;임영수
    • 한국철도학회논문집
    • /
    • 제9권6호
    • /
    • pp.766-771
    • /
    • 2006
  • Railway stations are important facilities for transport of passengers and freights. The location of station have an effect on the efficiency of railway transport and operation. In this study, an inspection of the primary factors for station spacing in urban railway has been performed and a review for the propriety of the present states and further improvement has been carried. It may be helpful for proper decisions on the route planning in urban railway. Primary factors for station spacing are 1)train capacity, 2)competitiveness with other transportation, 3)accessibility and 4)construction cost, which is out of consideration in the inspection. From the result of this study, the proper station spacing is about 600m for the accessibility, more over 1.03km for the train capacity and more over 1.4km for the competitiveness with other transportation.

공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구 (A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation)

  • 이강원;방연근;손영진
    • 한국철도학회논문집
    • /
    • 제9권5호
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.

지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안 (Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel)

  • 우종태;김종수;이송
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제5권4호
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

유제품 및 식품 분석 업무의 중요성 (분석학자의 관점) (Importance of Dairy and Food Analyses from an Analyst's Point of View)

  • 곽병만
    • Journal of Dairy Science and Biotechnology
    • /
    • 제38권4호
    • /
    • pp.237-239
    • /
    • 2020
  • Processes that products we consume that contain dairy foods comprise planning → design → production → quality/suitability assessment → safety verification → launch → distribution → consumption. Analysis of nutrients and potential toxins at each stage in the production process is essential to verify food quality, suitability, and safety. Products display ingredient lists and nutrient content to help consumers choose healthy foods. These products should also be fully assessed for microbes and toxins before reaching consumers. Products require verification through test inspections. However, this step has reduced value from a food manufacturer's viewpoint, because it does not visibly impact real economic trends. The most important first step in determining the quality and suitability of products is the inspection capability of food companies.

연안선박 대상 화물 선적 관리시스템에 대한 연구 (A study on cargo shipment management system for coastal ships)

  • 이훈;이승일
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2022년도 추계학술대회
    • /
    • pp.279-280
    • /
    • 2022
  • 국내 연안선박의 경우 화물 선적, 고박 및 검수 과정을 관리하는 별도의 정보시스템을 운용하지 않고 있다. 부두에서 선박 하역업무를 더욱 효율적으로 실행하기 위한 정보시스템에 대한 요구에 부합하는 기능적 요소를 제시한다. 본 논문은 연안선박을 이용하는 해상 운송 화물에 대한 예약, 선내 배치, 고박 및 검수 과정을 관리하는 정보시스템에 대한 연구이다.

  • PDF

성미산마을 공동체주거 계획과정의 거주자와 코디네이터의 의견조정 사례연구 (Case Study of Opinion Coordination between Residents and Coordinators on the Planning Process of Community Housing in Sungmisan Village)

  • 박경옥;류현수
    • 한국주거학회논문집
    • /
    • 제23권3호
    • /
    • pp.1-11
    • /
    • 2012
  • The purpose of this study was to make clear considerations in the planning of community housing and the roles of coordinators. Seongmisan village, a representative urban community village in Seoul, was selected for this study on problem solving between residents and opinion coordination between residents and coordinators. For this qualitative research, 2 residents and 2 coordinators answered 'open questionnaires' on prior basic planning, land purchase, financing, architectural planning, construction and inspection, and actual living conditions thereafter. They were each interviewed for 2 hours at a time that was 14-16 months after the residents started living in the new houses, and the records were transcribed. The following was the result. 1) The residents, who ruled the steps of prior basic planning and land purchase, did not have sufficient information or knowledge of the construction of community housing, so that they faced difficulties especially in the legal and financial aspects. 2) The coordinators participated in the project at the steps of architectural planning and construction. The residents accepted the coordinators' opinions on the choice of floor and position, and the coordinators listened to the residents' opinions on individual plans and finishing materials. In the construction step, however, there was conflict between them, and dissatisfaction occurred on the completion time and construction cost. For the successful construction of community housing, a professional coordination company needs to join the project to establish a system of opinion coordinating from the step of prior basic planning to the step of afterconstruction management.

드론 활용 교량 안전점검을 위한 표준절차 정립 (Establishment of a Standard Procedure for Safety Inspections of Bridges Using Drones)

  • 이석배;이기홍;최현민;임치성
    • 대한토목학회논문집
    • /
    • 제42권2호
    • /
    • pp.281-290
    • /
    • 2022
  • 우리나라는 안전점검을 의무적으로 시행하여야 하는 국가시설물이 증가하고 있으며, 또한 보다 안전한 안전점검 방법이 필요한 시점이다. 본 연구는 주로 육안조사에 의존하던 교량의 안전점검을 드론을 활용하여 수행함으로써 점검자의 안전을 확보하고 신속한 외관조사가 가능하게 함으로써 교량 안전점검 외관조사의 효율성을 높이고자 하였다. 연구를 위하여 인천의 영종대교를 테스트베드로 선정하고 와렌 트러스 부분, 현수교 메인 케이블, 주탑, 교각의 네 부분으로 나누어 드론 촬영을 실시하고 성과물을 제작하였으며 그 과정에서의 작업 내용들을 정리하고 분석하여 교량시설물에 대한 드론 안전점검시 다섯 단계의 표준절차를 정립할 수 있었다. 연구결과로 얻어진 표준절차의 단계별 내용은 1단계, 시설물 정보수집 및 분석, 2단계, 취약부 분석 및 비행계획, 3단계, 드론 촬영 및 데이터 처리, 4단계, 외관조사 상태평가, 5단계, 외관조사망도 및 DB 구축이다. 따라서 이 표준절차에 따라 교량을 포함한 토목시설물의 안전점검이 수행된다면 보다 체계적이고 효율적으로 안전점검을 수행해 나갈 수 있을 것으로 기대된다.