• Title/Summary/Keyword: Injection pipe

Search Result 161, Processing Time 0.026 seconds

Status and Design of Rapid-mix for Mechanisms of Alum coagulation (급속(急速) 혼화공정(混和工程) 현황(現況) 및 개선(改善) 사례(事例) 연구(硏究))

  • Jun, Hang-Bae;Han, Kyung-Jeon;Lee, Tae-Yong;Son, Kwang-Ik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.9 no.4
    • /
    • pp.97-106
    • /
    • 1995
  • An improving example for traditional rapid mix system was studied in the base of mechanisms of alum coagulation. Local status of the major water treatment plants was also investigated and evaluated for upgrading these plants. A new design and operating criterium for rapid mix system was proposed to velocity gradient, G of $1,000-1,500sec^{-1}$ and detention time, t of 1 sec from the results of experiments and literature reviews. Comparing the present rapid mix system to this criterium, apparent difference existed between them. In this study, for improving Seongnam water treatment plant, a design criterium of velocity gradient, and detention time was set to $1,100sec^{-1}$, 1 sec, respectively. A new rapid mix system adopted the nozzle injection countcurrently cross the inlet pipe to the whole area. The injection velocity was 17m/s, nozzle diameter was 1.0mm, and number of nozzle was 70. The new modified system without running present four 75 HP agitators was able to improve water quality(based on sedimentation effluent) by 15-35% and to reduce electrical energy by 98%.

  • PDF

The Experimental Research of LNT for 3L-DME Engine (3리터급 DME 엔진용 LNT 후처리 장치 연구)

  • Jang, Jinyoung;Lee, Youngjae;Pyo, Youngduk;Cho, Chongpyo;Woo, Youngmin
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.21 no.6
    • /
    • pp.117-122
    • /
    • 2013
  • This study is aimed to develop LNT(Lean NOx Trap) aftertreatment system for DME engine. Modified DME engine, which was changed from diesel to current DME engine, is used for this research and is equipped with common rail type injector and fuel supplying system. LNT system has reductant injector. DME is also used as reduction agent. For this research, reduction agent injection time width and interval were varied. And also, swirler was used to improve homogeneity of reducing agent in exhaust pipe. The reduction rate of NOx by LNT was increased by longer injection width, short interval and swirler. The maximum diminution of NOx by LNT was over 85%.

The Behavior of Bearing Capacity of Steel Pipe Piles Reinforced by Super Injection Grouting at Pile Tip (S.I.G 공법으로 선단보강된 강관말뚝의 지지거동)

  • Park, Young-Ho;Kim, Nag-Young;Yook, Jeong-Hoon;Choi, Jin-O
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.20-27
    • /
    • 2004
  • Reinforced twice than width of foundation with SIC under steel piles drived in cohesion soil and in the coal-limestone which heavily fractured. To analyze behaviour characteristic of steel piles, load transfer test was performed to steel piles attached with strain gauges to axial direction. After it passed 49days, dynamic load test was performed to set-up effect of steel piles bearing capacity. The results of test were compared to each other. According to the results, as the skin friction of steel pile was on the same condition, end bearing capacity of steel piles established on SIC solid of cemented milk in cohesion soil was three times than steel piles established on SIG solid of cemented milk in heavily fractured coal- limestone. After piles were driven and passes 49days, in case of piles on SIG solid of comented milk in cohesion soil the increaes of allowable bearing capacity was 442.9% and allowable bearing capacity of piles on SIG solid of cemented milk in heavily fractured coal-limestone increased 22.4%.

  • PDF

Pre-reinforcing Grouting a Sand Gravel Layer for Tunnelling (모래자갈층에서 터널시공을 위한 굴착 전 그라우팅 보강 사례)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.26 no.6
    • /
    • pp.466-474
    • /
    • 2016
  • Pre-reinforcement with umbrella arch grouting is conducted around a tunnel where a portion of the upper part of the tunnel is located in a sand and gravel layer. Surroundings of a first tunnel situated below groundwater table are reinforced with LW or SSM that is composed of ultra-fine cement and injected into multi-stages through large diameter steel pipes. With them, a first tunnel is safely excavated without both leaking of groundwater and fallings of sand and gravel from the arch. A second tunnel where groundwater is drained down to the bedrock is reinforced with jet grouting. The effect of the pre-grouting reinforcement is monitored by checking whether groundwater is dripping or sand or gravel is falling from the arch of the tunnels.

On the validation of ATHLET 3-D features for the simulation of multidimensional flows in horizontal geometries under single-phase subcooled conditions

  • Diaz-Pescador, E.;Schafer, F.;Kliem, S.
    • Nuclear Engineering and Technology
    • /
    • v.54 no.9
    • /
    • pp.3567-3579
    • /
    • 2022
  • This paper provides an assessment of fluid transport and mixing processes inside the primary circuit of the test facility ROCOM through the numerical simulation of Test 2.1 with the system code ATHLET. The experiment represents an asymmetric injection of cold and non-borated water into the reactor coolant system (RCS) of a pressurized water reactor (PWR) to restore core cooling, an emergency procedure which may subsequently trigger a core re-criticality. The injection takes place at low velocity under single-phase subcooled conditions and presents a major challenge for the simulation in lumped parameter codes, due to multidimensional effects in horizontal piping and vessel arising from density gradients and gravity forces. Aiming at further validating ATHLET 3-D capabilities against horizontal geometries, the experiment conditions are applied to a ROCOM model, which includes a newly developed horizontal pipe object to enhance code prediction inside coolant loops. The obtained results show code strong simulation capabilities to represent multidimensional flows. Enhanced prediction is observed at the vessel inlet compared to traditional 1-D approach, whereas mixing overprediction from the descending denser plume is observed at the upper-half downcomer region, which leads to eventual deviations at the core inlet.

Numerical Study on Improvement of Mixing Equipment' Plan in a Water Treatment Plant (수리해석을 이용한 정수장내 혼화장치 설계 개선에 관한 연구)

  • Oh, S.Y.;Hyun, D.S.;Oh, J.J.;Lee, S.H.;Lee, N.Y.
    • Proceedings of the KSME Conference
    • /
    • 2001.06e
    • /
    • pp.777-782
    • /
    • 2001
  • In this study, we used In-line orifice mixer for efficient chemicals mixing in water treatment. The method of using In-line orifice mixer has been already proved the improvement of water treatment efficiency. Numerical study was performed using FLUENT, a commercial code, to standard design and production of effective In-line orifice mixer. As variable for exactly standardizing, a proper ratio between an outer diameter of cone and a diameter of pipe, a distance between cone and orifice, a determination of orifice diameter for an optimal mixing, a distance between injection nozzle's position and cone, Numerical study has been performed for optimal standard and analyzed flow field on a basis of turbulent intensity in an orifice downstream.

  • PDF

The Ground Reinforcement on Daylight Collapsed Block in Driving Work at the National Road No. 3 Line (국도 3호선 터널건설 공사 중 붕락구간에 대한 지반보강)

  • 천병식;정덕교;이태우;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.02a
    • /
    • pp.14-22
    • /
    • 1999
  • Daylight collapse have been occurred by about 6.$^{0}$ m deep at ground surface which connected to the ground surface and excessive overbreak have been occurred by the space and height of 3.$^1$~6.$^2$m at crown head part of the tunnel during tunnelling of lower-half part after completing upper-half part on tunnelling of a phyllite mountain by NATM method at the construction work of two way-double track national road. This study is a successful illustration case of earth improvement by confirming structural safety of the tunnel in a whole through solving the cause of the tunnel collapse and the work have completed successfully through applying such earth strengthening method as cement mortarㆍcement milk injection, S.G.R, steel pipe reinforced multi-step grouting etc.

  • PDF

A Study on the Ground Movement around Tunnel Reinforced by Umbralla Arch Method (Umbrella Arch 공법에 의한 터널 천단부 보강시 주변 지반의 거동에 관한 연구)

  • 배규진;김창용;문홍득;훙성완
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.299-309
    • /
    • 1997
  • Soil and rock improvement and reinforcement techniques are applied to achieve safe tunnel excavation in difficult geological conditions. The Umbrella Arch Method(UAM), one of the auxiliary techniques, is used to reduce ground permeability and improve stabtility of the tunnel by inserting a series of steel pipes into ground around the crown inclined to the longitudinal axis of the tunnel. Additionally, multi-step grouting is added through the steel pipes. UAM combines the advantages of a modern forepoling system with the grouting injection method. This technique has been applied in subway, road and utility tunneling sites for the last few years in Korea. This paper presents the results of analysis of the case studies on ground movements associated with UAM used in the Seoul Subway line 5 constructon site. Improvement of tunnel stability and decrease of ground settlement expected with pipe insertion are also discussed. Finally, the method to minimize ground settlements caused by NATM tunnelling are suggested.

  • PDF

Verification and Calribration of Hydraulic Analysis of Water Supply System Using Fluoride Tracer (불소를 이용한 상수관망 수리해석의 검증 및 보정)

  • Joo, Dae-Sung;Park, No-Suk;Park, Heekyung;Oh, Jung-Woo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.2
    • /
    • pp.76-82
    • /
    • 1998
  • It is necessary to calculate the accurate velocity from the hydraulic model for the reliable prediction of water quality changes in water supply system. To verify the hydraulic analysis of the water supply system, fluoride was used as a tracer to calculate the travel time from the injection point to the sampling points. Results from this field experiment indicate that fluoride can be a good conservative tracer while it showed a little longitudinal dispersion along the pipe lines. And the velocity from the model was verified by these travel times and calibrated by changing the ratio of the unaccountable water. When the ratio of the unaccountable water. When the ratio of the unaccountable water was 20%, the error between the estimation of hydraulic model and the real travel time was minimum.

  • PDF

Numerical Study on effective Mixing Chemical Liquid using Hydraulic Energy in a Water Treatment Plant (정수장내 수류에너지를 이용한 액체약품의 효율적인 혼화를 위한 수리해석)

  • Song K. S.;Oh S. Y.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.132-137
    • /
    • 2001
  • We used In-line orifice mixer for efficient chemicals mixing in water treatment. The method of using In-line orifice mixer has been already proved the improvement of water treatment efficiency. Code of computational fluid dynamics for numerical analysis was performed using FLUENT, a commercial code. As variable for exactly standardizing, a proper ratio between an outer diameter of deflector and a diameter of pipe, the distance between deflector and orifice, a determination of orifice diameter fur an optimal mixing, a distance between injection nozzle's position and cone, Numerical study has been performed for optimal standard and analyzed flow field on a basis of turbulent intensity in an orifice downstream.

  • PDF