• Title/Summary/Keyword: Information quantity analysis

Search Result 481, Processing Time 0.028 seconds

An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object (BIM 기반의 공간객체를 이용한 물량산출 정확성 분석)

  • Cha, You-Na;Kim, Seong-Ah;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.13-23
    • /
    • 2014
  • After being introduced, Building Information Modeling (BIM) has been actively applied to the cost estimation of construction projects, and various studies on BIM based quantity take-off have been carried out. In practice, however, these calculations take considerable time, because BIM based quantity take-off is further conducted along with 2D-based quantity take-off. Studies on the quantity take-off using BIM spatial objects have been carried out on early stages of projects, but how this method differs from the existing quantity take-off method and how accurate it is in comparison have rarely been verified. Therefore, by comparing 2D based quantities with quantities through BIM spatial objects, this study analyzed the accuracy of quantity take-off using BIM spatial objects. To this end, the properties of BIM spatial objects and quantity calculable spatial types were analyzed, and existing 2D-based quantities and quantities extracted from BIM spatial objects were compared through a case study. As a result, the quantity of spatial objects found to be more by about 7.13% in 0.05% and therefore, this difference should be considered during quantity take-off using BIM spatial objects. Through the results of this study, we can improve the accuracy of quantity take-off using BIM spatial objects in the early stage of a construction project.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

Decision of optimal incentives and total order quantity with consideration of return rate of remanufacturing product (재생산 제품의 회수율을 고려한 최적 인센티브 및 총 주문량 결정)

  • Lee, Yong-Hyun;Lee, Chul-Ung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.8
    • /
    • pp.165-176
    • /
    • 2011
  • In this paper, we develop the cost minimization model to select two incentives and total order quantity with consideration of remanufacture company's return incentive. Return rate is sensitive to the incentive that the manufacture company offers. Using a EOQ(Economic Order Quantity) model of a cost minimization, we show concavities of the model about two incentives and total order quantity respectively. According to the proposed algorithm using the concavities, we find out the optimized incentive prices and total order quantity. Through numerical study, we examine sensitive analysis of the incentive price and order quantity for each parameter when the return rate is sensitive to incentive. Company lessens incentive to reduce total price. However, this makes the total price increase due to a diminution of return quantity. We expect that domestic or overseas remanufacture businesses are able to decide optimal incentive and total order quantity by this research.

Indexability and Information Quantity Analysis in Title and Abstract (표제(標題)와 초록(抄錄)의 색인성(索引性)과 정보량(情報量) 분석(分析))

  • Kim, Jae-Soo;Nam, Young-Joon
    • Journal of Information Management
    • /
    • v.23 no.2
    • /
    • pp.1-13
    • /
    • 1992
  • This study intends to measure the indexibility and the information quantity in title and abstract. The result of analysis was that when the source was title or abstract, result was not good. But when it was the title and abstract, the result was better.

  • PDF

A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work (개방형BIM기반의 건축공사 개산견적을 위한 물량산출 적용지침 활용방안 기초 연구)

  • Kim, Inhan;Um, Sung-Gon;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.182-192
    • /
    • 2015
  • In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.

Development of a Large Quantity of Inputs Interface System Using a Single Chip microcontroller (원칩 마이컴을 이용한 대용량 입력 인터페이스 시스템의 개발)

  • Park, Ju-Tae;Choi, Duck-sung;Jeong, Seung-Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.1
    • /
    • pp.215-221
    • /
    • 2016
  • In this thesis we introduce a large quantity of input interface system using a low cost single chip microcontroller which is consists of walking board with 1600 switches, RS485 communication for switch data communication and PC application software for walking pattern analysis. When a pedestrian walks on the walking board, the pattern analysis of foot pressed switches can be utilized on diverse divisions of sports and industry such as walking physical therapy, dancing, a large quantity of sensors interface system, etc.

The Study on analysis methodology of optimal performance and quantity for Mission-Based drones (임무 기반 드론의 최적성능 및 소요량 분석 방법론 연구)

  • Ha, Young-Seok
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.231-236
    • /
    • 2020
  • This paper addresses the analysis method about optimal performance and required quantity for Mission-Based drones. In the case of drones, although scientific verification of operational performance and quantity of demanded, such as total flight time, total operation time, and appropriate required quantity, is required depending on the operation concept, there is no methodology for analyzing them systematically. That is the reason this research was carried out. Through the suggestion and study about Mission-Based six step analysis method and, this study can present the optimal ROC (Required Operational Capability) and the required quantity based on the operational concept of drones, and technical and economic effects were suggested.

Basic Research on BIM-Based Quantity Take-off Guidelines

  • Yun, Seokheon;Kim, Sangchul
    • Architectural research
    • /
    • v.15 no.2
    • /
    • pp.103-109
    • /
    • 2013
  • Various types of building information should be linked to 3D model objects for their effective use by stakeholders. Because Building Information Modeling (BIM) based on 3D is used by different stakeholders, the created BIM need standard guidelines for each purpose, as, for example, for quantity take-off. Thus, this study was conducted to propose guidelines for BIM modeling for quantity take-off in the framework, especially, in the concrete and form. The proposed guidelines adopted each element of the BIM model based on an analysis of the problem of the general BIM model. Moreover, the usability and accuracy of the reinforced structure modeling guidelines were verified by comparing the quantity of the commercial estimation software and the modeling quantity using the proposed modeling guidelines.

Factors Clustering Approach to Parametric Cost Estimates And OLAP Driver

  • JaeHo, Cho;BoSik, Son;JaeYoul, Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.707-716
    • /
    • 2009
  • The role of cost modeller is to facilitate the design process by systematic application of cost factors so as to maintain a sensible and economic relationship between cost, quantity, utility and appearance which thus helps in achieving the client's requirements within an agreed budget. There are a number of research on cost estimates in the early design stage based on the improvement of accuracy or impact factors. It is common knowledge that cost estimates are undertaken progressively throughout the design stage and make use of the information that is available at each phase, through the related research up to now. In addition, Cost estimates in the early design stage shall analyze the information under the various kinds of precondition before reaching the more developed design because a design can be modified and changed in all process depending on clients' requirements. Parametric cost estimating models have been adopted to support decision making in a changeable environment, in the early design stage. These models are using a similar instance or a pattern of historical case to be constituted in project information, geographic design features, relevant data to quantity or cost, etc. OLAP technique analyzes a subject data by multi-dimensional points of view; it supports query, analysis, comparison of required information by diverse queries. OLAP's data structure matches well with multiview-analysis framework. Accordingly, this study implements multi-dimensional information system for case based quantity data related to design information that is utilizing OLAP's technology, and then analyzes impact factors of quantity by the design criteria or parameter of the same meaning. On the basis of given factors examined above, this study will generate the rules on quantity measure and produce resemblance class using clustering of data mining. These sorts of knowledge-base consist of a set of classified data as group patterns, of which will be appropriate stand on the parametric cost estimating method.

  • PDF

A Study of User′s Perspective and Satisfaction in National Assembly Library Electronic Library System (국회도서관 전자도서관시스템에 대한 이용자의 기대와 만족에 대한 연구)

  • Hong, Ki-Churl
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.36 no.2
    • /
    • pp.265-284
    • /
    • 2002
  • The purposes of this study are research for user's perspective and satisfaction, and analyze degree of difference in user's perspective and satisfaction through electronic library system of National Assembly Library. According to analysis of questionnaire, score of the factors that quantity of information, latest of information, quality of information, system of classification, accuracy of information are higher than average in user's perspective. Also score of the factors that speed of response, quality of information, consistency of information, consistency of retrieval, quantity of information, accuracy of information are higher than average in user's satisfaction. Result of analysis show that latest of information, quantity of information, variety of information, system of classification, accuracy of information are higher gap in user's perspective and satisfaction.