Development of Extended IFC Schema for BIM-based Korean Construction Standards Review (BIM 기반 국가건설기준 검토 수행을 위한 확장형 IFC 구조 개발)

  • Suk, Chae-Hyun;Jeong, Yu-Jeong;Yu, Young-Su;Koo, Bon-Sang;Ryu, Sang-Hun
    • Journal of KIBIM
    • /
    • v.14 no.2
    • /
    • pp.35-49
    • /
    • 2024
  • IFC, a neutral standard data model for BIM, ensures data interoperability across BIM applications but struggles with adapting to diverse construction standards across countries and regions. In practice, the standard IFC schema does not include the entity and attribute information necessary for reviewing Korean Construction Standards. To overcome this, this study developed an extended IFC schema that incorporates design and construction standards data specifically for bridge. The extended IFC schema defines entities for representing types of bridges, structures, and elements, and Psets for containing relevant standards information. This schema is customized to be compatible with both Korean Design Standards (KDS) and Korean Construction Specifications (KCS). Additionally, based on the extended IFC schema, a specialized extension module was developed, capable of embedding design and construction standards data by element within IFC Physical File. Through this module, the necessary design and construction standards were inserted into specific elements.

A Fundamental Study on Development Framework of Integrated Database for Construction CALS (건설CALS 통합데이터베이스 구축을 위한 기초적 연구)

  • Kwon Sung-Hyun;Moon Sung-Woo;Lee Cheol-Kyu;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2002
  • To establish integrated Database, this paper (1) grasped key success factors of integrated data environment, (2) selected linking information through investigating information-oriented projects and database necessary to perform construction project in public section, (3) divided selected information into project-based information and general information, and then (4) presented plan of sharing knowledge through using the linking method of knowledge database and meta-database.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

Acquiring the International Availability of Construction Manager System in the Global Environment (세계화시대에서의 감리기술자제도의 국제통용성확보에 관한 연구)

  • Moon, Haeng-Kyu;Yang, Jae-Soo
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.8 no.4
    • /
    • pp.163-169
    • /
    • 2009
  • Recently, the concern of the FTA (Free Trade Agreement) have shifted to the promotion of the professional service's trade via the bilateral and reciprocal agreement of its professional laws. In the construction industry, this policy has intended to make the standardization of the construction manager's profession in the world. The purpose of this paper is 1) first to define the general model of professions in the U.S., UK and Japan, 2) then to declare the construction manager's model of the profession in them to apply the general model of professions, and 3) finally to analyze the identity of Korean construction managers and acquirement of its construction manager's law comparing with construction manager's model of the profession in the U.S., UK and Japan.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

COMPARATIVE ANALYSIS OF BIM ADOPTION IN KOREAN CONSTRUCTION INDUSTRY AND OTHER COUNTRIES

  • Jongsung Won;Ghang Lee;Chijoo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.587-592
    • /
    • 2009
  • Construction companies in Korea have shown interest in BIM (Building Information Modeling) even if late, adopted it, and applied it to several projects. But, it is hard to figure out the status of BIM implementation. Thus, this study is to figure out the status of BIM implementation in Korea by surveying major construction companies in Korea and comparing with similar surveys abroad. The survey result shows that only 11 companies in Korean construction industry adopted BIM. The clash check (73%) was mostly used among various BIM functions and other functions were used less than 30%. As of 2008, only 8 construction companies have used BIM in 27 projects and thus, Korean companies are in the BIM introduction period. Therefore, successful introduction of BIM is required by benchmarking the BIM introduction process of overseas construction industries

  • PDF

A MODEL OF CONSTRUCTION WORKER'S PERCEPTIONS ON ELECTRONIC MONITORING

  • Bill L.P. Lee;Stephen Mak
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.190-195
    • /
    • 2009
  • With the growth of information and communication technologies adoption in construction projects, it could be anticipated that more property owners and construction firms will attempt to use electronic gears and gadgets for site monitoring or surveillance purposes. As the construction workers may be the major group of project team members being monitored, from managerial perspectives and for ethical reasons, it is essential to investigate their degree of acceptance on site monitoring systems. Indeed studies on office workplace monitoring suggest that a monitoring system could shape or control the behaviors of employees. With adequate refinements, their research models could be applicable in the construction industry. This paper presents a model for analyzing the antecedences that affect workers' acceptance level on electronic monitoring, and investigating if there is any behavioral change.

  • PDF

Generation Model for BIM Elements based on Architectural Drawings (2D 건축도면기반 BIM 엘리먼트 생성 모델)

  • Bae, Chang-Joon;Park, Sang-Hun;Cho, Dong-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.68-69
    • /
    • 2018
  • The construction drawing is a collection of knowledge that has accumulated knowledge and experience of designers and is highly valuable for recycling in the future. BIM is a process and technology that acquires and manages the information needed for the whole life cycle of a building. In order to recycle digitalized 2D drawings in BIM Tool, it is required to use 3D information based on the drawing information to save and reuse them, but there is little research on related methods or system development. In this study, 3D elements are created based on 2D drawing information, and libraries are constructed, and BIM Tool is used to improve the recyclability of drawing information.

  • PDF

A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information (형상정보가 없는 공종의 속성정보모델링 기법 개발에 관한 연구)

  • Lee, Min-Cheol;Lee, Sang-Jin;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.114-125
    • /
    • 2011
  • Construction industries worldwide have moved to Building Information Modeling environment in conjunction with IT technology progress. Korean domestic construction market is in the midst of enthusiastically adopting BIM technique and the public sectors try to apply the method to their projects. Difficulties have been introduced, however, in doing so mainly due to the complexity in reflecting the distinctions of the public cost estimate requirements to BIM modeling. The main objective of this study is to propose four kinds of BIM property information modeling methodologies which would be used in the quantity surveys of the public construction projects. To evaluate the applicability of the suggested modeling methods, the research performed a case study.