A Study on the Tact Management Using a Daily Report Information (작업일보 정보를 이용한 택트공정관리방안 연구)

  • Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.80-87
    • /
    • 2003
  • Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.

A Study on Information Scheme for IETM Implementation in Construction (건설분야 전자매뉴얼 구현을 위한 정보체계에 관한 연구)

  • Jeong, Seong-Yun;Kim, Seong-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.11a
    • /
    • pp.125-128
    • /
    • 2005
  • 건설산업의 특성 상 도로, 교량 등 하나의 시설물을 준공하여 유지관리하기까지 설계 기준서, 시방서, 규격서, 보고서 등 각종 건설 제기준과 기술문서를 지속적으로 참조하여야 한다. 이러한 문서를 언제, 어디서, 누구나 쉽고 편리하게 공유 및 재활용할 수 있도록 전자매뉴얼체계를 건설분야에 도입하고자 본 연구를 수행하였다. 전자매뉴얼 구축에 필요한 요소기술과 기능기술을 분석하였다. 분석된 요소 및 기능기술에 부합하도록 XML 스키마 기반으로 한 35종의 전자매뉴얼 정보체계를 개발하였다.

  • PDF

Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM (4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Kim, Hyun-Soo;Ahn, Jae-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases (설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안)

  • Park, Bo Sung;Kim, Sean Hay
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Framework of Electronic Construction Specification by Using IETM (전자매뉴얼에 의한 건설공사 시방서 구성방안)

  • Moon, Hyoun-Seok;Kang, Leen-Seok;Jeong, Seong-Yun;Kwak, Joong-Min;Jung, Won-Myoung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1114-1117
    • /
    • 2004
  • Application of information technology for the construction area has been processed actively with the development of information technology. In this study, a framework of the Construction Specification IETM(Interactive Electronic Technical Manual) was suggested through the analysis of the Department of Defense(DoD)'s standards and the trend of techniques related to the IETM. As the Framework, the DFD(Data Flow Diagram) of the construction specification IETM's organizing and using procedure was suggested. And a Model of construction specification IETM was organized on the basis of DFD. Finally, a scenario was constructed by the pilot system which is based on the model. The application of the construction specification IETM would make efficient and effect task implementations possible. By that, in addition to the reduction of the cost and time, the quality enhancement from information missing protect effectiveness could be expected.

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.