• Title/Summary/Keyword: Information Systems Planning

Search Result 1,343, Processing Time 0.031 seconds

A Study of Implementation to Enterprise Information Strategy Planning based on Information Technology Architecture (정보 기술 아키텍쳐 기반의 기업 정보화 전략 구현을 위한 연구)

  • Kim Tae-Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.2
    • /
    • pp.69-74
    • /
    • 2005
  • As today's Information Technology (IT) becomes more global and specialized the importance of Information Technology Architecture (ITA). Based on the case study of e-commerce, this paper presents a systematic approach to Information Strategy Planning (ISP) with ITA. To implementation of strategic approach, ITA is developed to establish e-commerce projects. It is believed that the Chief Information Officer (CIO) will be more receptive to results that include ISP and ITA are combined simultaneously.

Distribution Planning in a Multi-Echelon Inventory Model under Rolling Horizon Environment (Rolling Horizon 환경하에서 다단계 재고 모형의 분배계획 수립에 관한 연구)

  • Ahn, Jae-Sung;Kwon, Ick-Hyun;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.16 no.4
    • /
    • pp.441-449
    • /
    • 2003
  • In this paper we propose a distribution planning method aiming the use in the real-life situations. The assumed form of the distribution network is arborescence. At every node in the distribution network, orders are placed periodically. At each renewal of planning horizon, demand informations of periods in the horizon are updated. The objective of the problem is to minimize the total cost, which is the sum of holding and backorder costs of all sites during planning horizon. For such a situation, this study addressed an effective distribution plan when demands for demand-sites are provided for a given planning horizon.

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

Convergence of Business Information System Process using Knowledge-based Method (지식기반 데이터 방법론을 이용한 비즈니스 정보시스템 프로세스 융합)

  • Kim, Young-Jun
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.4
    • /
    • pp.65-71
    • /
    • 2015
  • The role of information systems and business strategies of companies have attempted a variety of changes in the information technology environment that is displayed various. The advent of big data and knowledge-based analysis began to have great significance in the field of strategic planning for information systems specially constructed. The organization factors that affect the strategic planning of information systems through the application and practical Many researchers, technology, environmental have been introduced specifically. Input factors that affect the planning of information systems of these. In this study, it found the elements of the communication mechanism that exists between information and factors, the process of when developing a plan for information systems, and to study its relevance and convergence.

The Strategies of Developing the Korea Planning Support Systems

  • Choe, Byong-Nam;Im, Eun-Sun;Kim, Kirl
    • Spatial Information Research
    • /
    • v.15 no.4
    • /
    • pp.371-383
    • /
    • 2007
  • The Korea Planning Support Systems (KOPSS) represent Korean style national policy and planning support systems using the GIS-based spatial analysis methods. The KOPSS refers to a kind of the spatial decision support systems (SDSS) or the planning support systems (PSS) for stakeholders' spatial decision-making. The KOPSS uses the existing individual databases obtained from the Architecture Information Systems (AIS) and Land Management Information Systems (LMIS) that have been constructed by information projects since the mid 1990s. The purpose of this paper is to suggest the development strategies and establish the theoretical frameworks of the KOPSS by considering the comprehensive basic composites of the GIS-based SDSS or PSS. For this, it deals with the basic concepts, the development strategies, the base environment strategies, and the promotion strategies of the KOPSS.

  • PDF

Systems Engineering Approach to Develop Intelligent Production Planning Scheduling Model linked to Machine and Quality Data (설비 및 품질 데이터 연계 지능형 생산계획 스케줄링 모델 개발을 위한 시스템엔지니어링 접근 방법)

  • Park, Jong Hee;Kim, Jin Young;Hong, Dae Geun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.2
    • /
    • pp.1-8
    • /
    • 2021
  • This study proposes a systems engineering approach for the development of an advanced planning & scheduling (APS) system for a cosmetic case manufacturing factory. The APS system makes production plans and schedules based on the injection process, which consists of 27 plastic injection machines in parallel to control recommended inventory of products. The system uses machine operation/failure information and defective product/work-in-process tracking information to support intelligent scheduling. Furthermore, a genetic algorithm model is applied to handle the complexity of heuristic rules and machine/quality constraints in this process. As a result of the development, the recommended inventory compliance rate is improved by scheduling the 30-day production plan for 15 main products.

A Study of Integrated Information System an Automated Warehouse System

  • Park, Young H.;Park, Eui H.
    • Journal of Korean Society for Quality Management
    • /
    • v.16 no.2
    • /
    • pp.48-55
    • /
    • 1988
  • There have been several papers to illustrate how an information system is used in an automated warehouse system. These papers, however. do not carefully address the role of warehouse planning/control systems nor do they recognize how to integrate the management planning/control systems, and automated warehouse system. This article addresses such issues and shows how a business computer system can be used to integrate and unify the warehouse planning/control systems and the automated warehouse system into it single and highly productive operating system.

  • PDF

IS Characteristics for Planning Decision Making : Contingent on Planning Modes (기획의사결정을 위한 정보시스템 특성 : 기획방식에 따른 상황적응적 접근)

  • Jo, Se-Hyeong
    • Asia pacific journal of information systems
    • /
    • v.3 no.2
    • /
    • pp.117-144
    • /
    • 1993
  • MIS researches involve, in particular, the problems of developing appropriate IS for given MIS environments and lay emphasis on identifying prominant IS characteristics pertaining to the system in issue. This study deals with the IS characteristics for the management task of "planning". It investigates empirically the impacts of IS characteristics, under a set of proposed hypotheses, with particular respect to users' information satisfaction and performance in carrying out the task of planning. Futhermore, it examines whether the IS characteristics have different effects depending on the planning modes on the part of IS users. Based on a group of hypotheses accepted, the IS characteristics for planning decision making are not only proposed according to planning modes: preactive, reactive and proactive, but also classified into six subsystem categories: input, process, ouput, storage, interface and communication. Finally, the implications of the findings are discussed.

  • PDF

The Measurement Model for the Evaluation of Information Systems Service : The Case of Chinese SI Company (정보시스템 서비스 평가를 위한 측정모형의 개발 및 실증적 검증 : 중국 SI 기업 사례)

  • Lee, Sang-Jae;Lim, Gyoo-Gun
    • Journal of Information Technology Services
    • /
    • v.10 no.2
    • /
    • pp.141-162
    • /
    • 2011
  • The controls of Information Systems (IS) have been an more critical issue controls as the sophistication and integration of IS is more proceeded. ITGI (The Information Technology Governance Institute) of ISACA (Information Systems Audit and Control Association) has suggested COBIT (Control Objectives for Information and related Technology) and this has been widely recognized the evaluation model of IS controls. In COBIT, IS was evaluated in terms of process, information quality, and IT resources. This study used COBIT in order to suggest and empirically test an evaluation model of IS service. The data was collated from one major Chinese SI (Systems Integration) company in four domains of processes : planning and organization, acquisition and implementation, delivery and support, and monitoring. Seven factors are extracted using an exploratory factor analysis as follows : Overall IT planning process, technological assessment process in IT planning of IT, cost-benefit assessment process in IT planning, implementation process, support process, monitoring process, post-implementation evaluation process. The results of confirmatory analysis of three alternative measurement models indicated that the measurement model with one inherent or conceptual variable has greater model fitness than the other models. This study suggests the logical and general way to test and apply COBIT in evaluating IS services.

Information Systems Planning Method Based on Value-focused Thinking

  • Li, Yi-Jia;Wang, Zhi-Yong
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2007.02a
    • /
    • pp.114-121
    • /
    • 2007
  • In the existing ISP methods, the important' role of enterprise value is usually ignored or not recognized in the information systems planning (ISP). Besides, in some ISP methods, there is a connotative precondition that the main body of value is always the enterprise stakeholder. Thus, in ISP, the enterprise stakeholders‘ value has been recognized while the value of other main bodies has been neglected, which has resulted in boycott and other problems in normalization construction. Based on the existing ISP analysis frame and ways, this article analyzes the enterprise fundamental principle of enterprise value acting on ISP and defines the formation of enterprise value. On the basis of Keeney's analysis way of value focused thinking for decision-making, we induct the factors of enterprise value into the ISP method and set forth such an ISP process: (1) identify the aggregation of enterprise value; (2) conform the objective structure of enterprise levels; (3) determine the appraisal standard for enterprise fundamental objectives; (4) determine the basic structure for information systems ; (5) confirm the data requirements for information systems; (6) give appraisal and comment.

  • PDF