• 제목/요약/키워드: Information Quantity

검색결과 1,530건 처리시간 0.027초

파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링 (3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique)

  • 와카스 아샤드 타놀리;하스나인 라자;이승수;박상일;서종원
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

BIM기반 물량산출 완성도 측정을 위한 지수 개발 (An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off)

  • 이창희;김성아;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.79-92
    • /
    • 2011
  • 건설 프로젝트에서 물량 산출은 공사비를 결정하는 중요한 요소로 정확성과 신뢰성이 요구된다. BIM 데이터로부터 물량정보의 추출은 물량산출을 매우 정확하고 신속하게 수행할 수 있다는 점에서 매우 매력적이다. 하지만, BIM을 어떻게 구축하였는가에 따라 그 물량산출 결과가 매우 상이하게 나타날 수 있다. 프로젝트가 진행됨에 설계정보가 점점 더 구체화되기 때문에 BIM 모델의 완성도와 물량산출의 정확도 또한 높아질 것으로 기대할 수 있다. 하지만, 단계별로 공사비를 예측할 때 현 단계에서의 BIM data를 기반으로 한 물량산출의 정확도가 얼마 정도인지 평가하거나 예측할 수 있는 방법이 없기 때문에 그 결과물을 신뢰하기 어렵고 기존방식의 견적에 다시 의존하게 되는 문제가 발생할 수 있다. 따라서 본 연구에서는 BIM기반 물량산출에 영향을 미치는 요인을 도출하고, 이를 기반으로 BIM기반 물량산출 결과물의 완성도를 정량적으로 측정하고 예측할 수 있는 방법과 체계를 제시하는 것에 초점을 두고 있다. 본 연구에서 제시하는 측정체계와 지수는 약 6개의 파일럿 프로젝트 적용을 통해 그 측정결과의 일관성과 타당성이 검증되었다.

BIM기반 철근콘크리트구조의 물량산출 비교 (A Comparison of Quantity Take-Offs of RC Structures based on BIM)

  • 윤종덕;조현식;이재홍;신재용;김은석
    • 한국전산구조공학회논문집
    • /
    • 제33권1호
    • /
    • pp.35-44
    • /
    • 2020
  • 최근 건설업계에서 설계시의 수량산출 및 예정공사비의 정확도에 대한 요구가 높아지고 있으며, 설계변경 시에 즉각적인 물량의 변화와 공사비의 변화를 파악하는 것이 중요한 이슈가 되고 있다. 또한, 수량과 공사비와 관련한 각종 소송들이 빈번하게 발생하면서 이를 해결하기 위한 방안으로 BIM기반의 물량산출 및 견적이 대안으로 등장하였다. 그러나 현재 BIM기반의 물량산출 및 견적은 2D 기반의 기존 방식보다 활용이 원활하지 못하다. 이는 물량산출 및 내역에 대한 국가적인 표준이나 기준이 마련되어 있지 못하고, 산출 작업자의 경험이 중요한 요소로 작용하기 때문이다. 하지만, 이는 견적의 관점이고 설계자의 관점에서 BIM을 이용한 즉각적이고 비교적 정확도가 우수한 수량과 공사비의 파악이 예산에 맞는 설계를 진행하기 위하여 필요하다. 본 연구에서는 서울시 ◯◯타운 생활관의 철근콘크리트 구조의 콘크리트, 철근, 거푸집의 수량을 사례로 2D기반의 설계수량과 BIM을 기반으로 한 계획설계, 실시설계 시의 수량과 실제 시공수량을 비교·분석하고 차이가 발생하는 원인을 분석하여 향후 설계자 관점에서 BIM기반의 수량산출에 도움이 되고자 하였다.

정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 - (A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction -)

  • 이명훈;함남혁;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

음성신호의 선형예측계수에 의한 잡음량의 인식 (Recognition of Noise Quantity by Linear Predictive Coefficient of Speech Signal)

  • 최재승
    • 대한전자공학회논문지SP
    • /
    • 제46권2호
    • /
    • pp.120-126
    • /
    • 2009
  • 잡음환경 하의 회화에서 잡음량을 줄이고 신호처리 시스뎀의 성능을 향상시키기 위해서는 잡음량에 따라서 적응적으로 처리되는 신호처리 시스템이 필요하다. 따라서 본 논문에서는 선형예측계수를 사용하여 잡음량을 인식하는 방법을 제안하며, 본 잡음량 인식은 다양한 배경잡음에 의하여 열화된 3종류의 음성이 신경회로망에 의하여 학습되어진다. 제안한 잡음량 인식의 성능은 다양한 잡음에 대하여 인식율을 사용하여 측정되었다. 본 실험에서는 Aurora2 데이터베이스를 사용하여 여러 잡음에 대하여 평균적으로 약 98.4% 이상의 양호한 인식결과를 확인할 수 있었다.

지문 인식을 위한 정합 알고리즘에 관한 연구 (A Study of Matching Algorithm for Fingerprint Recognition)

  • 조기형;이대령
    • 한국통신학회논문지
    • /
    • 제16권2호
    • /
    • pp.155-161
    • /
    • 1991
  • 본 연구는 지문인식을 위한 성합 알고리즘에 관한 것으로 지문 영상이 갖는 특징점에서 4개의 단점과 분기점의 위치와 방향정보를 이용하였으며, 입력 지문과 참조 지문의 특징점 일치수, 이동량, 위치 정합량을 정의하고 위치성합량차를 산출하여 동일 지문을 판정하였다.

  • PDF

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제25권12호
    • /
    • pp.1-15
    • /
    • 2020
  • 본 논문에서는 토목 분야 설계와 시공 단계에서의 기존의 2D 프로세스들을 향후 BIM 방식의 프로세스들로 전환하기 위한 새로운 방법을 제안한다. 먼저, 생애주기 관점의 토공 및 도로 구조물의 BIM 설계와 시공 단계에서의 수량-공정(4D)-공사비(5D) 연계 활용의 전체 프로세스에 대하여 기존 2D 방식의 성과품과 3D BIM 방식의 성과품들의 실적용 과정을 비교 분석한다. 제안하는 방법은 IFC 국제 공통 표준 파일 정보와 CBS/OBS/WBS 표준 분류 체계 정보를 연계하여 설계 단계의 성과품을 만들고 수량-공정(4D)-공사비(5D) 연계 활용 모듈을 활용하여 시공 단계의 성과품을 만든다. 궁극적으로는 제안하는 방법을 사용하여 토목 분야 BIM 설계와 시공의 단계별 기술들을 상용화하고자 한다.

실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구 (A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase)

  • 박승화;김흥수;윤두영
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.